Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹30.8 LAccepted-AOC | ₹30.8 L | 1 | Accepted-AOC Lowest bidder |
| 2 | 2₹30.8 LRejected-Finance | ₹30.8 L | 2 | Rejected-Finance highest bid |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Documents not Submitted |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance TANAKPUR ROAD PITHORAGARH UTTARAKHAND | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Documents are incomplete |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Not submitted Earnest money |
| Sl No | Description | Qty | Unit | M/S Dev Singh Chuhan L2 | MAHESH RAM L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material Ordinary soil Upto 3 m depth | 193 | cum | 444.3 ₹85,749.90 | 440 ₹84,920 |
| 2.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing) | 8.5 | cum | 6,957.73 ₹59,140.71 | 6,955 ₹59,117.50 |
| 3.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 296 | cum | 4,375.61 ₹13.0 L | 4,375 ₹12.9 L |
| 4.00 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,etc. including supply of all material, labour, T&P and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203 of MORD Specifiction. | 101 | cum | 2,423.4 ₹2.4 L | 2,423 ₹2.4 L |
| 5.00 | Hand Packed stone filling in back of wallls including cost of all materials,Hand Packed stone filling in back of wallls including cost of all materials,Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 27 | cum | 1,094.8 ₹29,559.60 | 1,094 ₹29,538 |
| 6.00 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:5). | 132 | cum | 4,930.04 ₹6.5 L | 4,930 ₹6.5 L |
| 7.00 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 and technical specifications Clauses 800, 1205.4 and 1205.5 For nominal mix 1:2:4 (Hand mixed) Height upto 5m R.C.C grade M 20. | 36 | cum | 8,853.24 ₹3.2 L | 8,853 ₹3.2 L |
| 8.00 | Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 | 2.8 | Tonne | 68,793.3 ₹1.9 L | 68,790 ₹1.9 L |
| 9.00 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 10 | cum | 1,614 ₹16,140 | 1,610 ₹16,100 |
| 10.00 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) GI wire 10 gauge BWG | 6.7 | cum | 2,003.8 ₹13,425.46 | 2,003 ₹13,420.10 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹99,000
Closing Date
29 Nov 2025, 1:00 pmClosed
Executive Engineer Irrigation Division Pithoragarh
Office of Executive Engineer Irrigation Division Pithoragarh
Renovation of Sera Minor in Block Bin District Pithoragarh Under State Sector (Reach 0.00 to 2.00km)
2025_IRDCE_88650_1
04/EE/25-26 Dated 31-10-25
Open Tender
Civil Works - Canal
240 days
Sera BIN block
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
Executive Engineer ID Pithoragarh
₹99,000
Pithoragarh
12 Feb 2026
4 Nov 2025
29 Nov 2025
4 Nov 2025
29 Nov 2025
6 Nov 2025
14 Nov 2025
Amount
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material Ordinary soil Upto 3 m depth
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3.6 (Hand mixing)
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls,etc. including supply of all material, labour, T&P and royaltiies etc.complete as per drawing and technical specifications Clauses 702, 704,1202 & 1203 of MORD Specifiction.
Hand Packed stone filling in back of wallls including cost of all materials,Hand Packed stone filling in back of wallls including cost of all materials,Hand Packed stone filling in back of wallls including cost of all materials,royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 In cement mortar (1:5).
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 and technical specifications Clauses 800, 1205.4 and 1205.5 For nominal mix 1:2:4 (Hand mixed) Height upto 5m R.C.C grade M 20.
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) GI wire 10 gauge BWG
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD SpecifictionG
Dismantling Stone Masonry as per Technical Specification Clause 202.
Jungle Clearance
Slip cliarence
silt/bajari clearence specifications)
M/S Dev Singh Chuhan (BID ID -407068)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.47 MB
Tender Documents
Tender Documents • 4.56 MB
BOQ
BOQ • 0.32 MB
Download all tender documents and submit your bid