Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.2 LAccepted-Finance | L1 | Accepted-Finance 1st Lowest | |
| 2 | L2₹54.0 L+₹7.8 L (16.9%)Accepted-Finance | L2 | Accepted-Finance 2nd Lowest | |
| 3 | L3₹54.7 L+₹8.6 L (18.6%)Accepted-Finance | L3 | Accepted-Finance 3rd Lowest |
| Sl No | Description | Qty | Unit | VT MOHAMMED L1 | BADARUDDEEN K P L3 | MUHAMMED AFSAL P L2 |
|---|---|---|---|---|---|---|
| 1.00DR Works | ||||||
| 1.00 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | 1,418.5 | cum | 1,795 ₹25,46,207.5 Lowest | 1,941.74 ₹27,54,358.19 | 1,914 ₹27,15,009 |
| 1.00 | OD17691/2026-2027:DR PACKING FOR APRONS USING DEPARTMENTAL STONES - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1,418.5 | cum | 1,460 ₹20,71,010 Lowest | 1,917.7 ₹27,20,257.45 | 1,890 ₹26,80,965 |
Tender Value
₹59.6 L
EMD Value
₹50,000
Closing Date
25 Sept 2026, 5:00 pmClosed
Dileep M V
O/o Executive Engineer Chamravattom Project Division Eswaramangalam Ponnani
DR Dumping-Extension of guide wall on the downstream of Chamravattom RCB-General Civil Work
2026_Irrig_869953_1
IRR/IA/TR/4181/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Downstream of Chamravattom RCB
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹50,000
28 Sept 2026
15 Sept 2026
28 Sept 2026
15 Sept 2026
25 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DR Works | |||||
| 1.001 | 60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. | 1,418.5 | cum | - | - |
| 1.002 | OD17691/2026-2027:DR PACKING FOR APRONS USING DEPARTMENTAL STONES - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 1,418.5 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1474037.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.66 MB
BOQ_1474037.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .