Loading…
Loading…
Tender Value
₹15.9 L
EMD Value
₹16,000
Closing Date
17 Jun 2026, 6:00 pm
The Superintending Engineer, Project Implementation Unit
Providing annual comprehensive maintenance contract for A.C,W.C, Geyser under Kheda & Anand District.
310674
23/12 of 2026/2027
Open
Electrical and Maintenance Works
Gandhinagar
8 documents required · 8 mandatory
₹900
PIU-General Fund A/c 11-114
₹16,000
2 Jun 2026
2 Jun 2026
2 Jun 2026
17 Jun 2026
2 Jun 2026
NAME OF WORK : Providing annual comprehensive maintenance contract for A.C,W.C, Geyser under Kheda & Anand District.
Sr.no SOR No. Item Discripton Unit Qty TOTAL AMOUNT
Sr.no SOR No. Item Discripton Unit Qty TOTAL AMOUNT
(1) The All inclusive comprehensive maintenance cost covers the yearly
maintenance cost of the electrical machineries with material & Labour cost
including preventive maintenance. The cost covers entire installation from outlet
of main switch to electrical machine..
(2)In case of Monoblock & Openwell pump sets following item covers cost of
necessary plumbing works, repairs of foundations etc.
(3) All inclusive comprehensive maintenance cost of Window type / Split type Air
conditioners & Water coolers covers the yearly maintenance & preventive
maintenance with all required painting materials & labours. including sheet metal
work, refrigerant gas , compressor & all the contains parts. The cost covers entire
installation from outlet of main switch to the Unit.
(4) For A.M.C. of electrical installation Yearly rates not covered in following items.
For such items rate shall be derived considering the current S.O.R. cost as capital
cost & A.M.C. yearly rate shall be derived at 10 % Cost for estimation purpose
Rupees One Thousand
All inclusive comprehensive maintenance cost for the period of one year for the
Two hundred Thirty
Split type Air-conditioning Unit of following Capacity (B) 1.5 ton capacity (1) Ea. 258.00 1233.21
Three Paise Twenty One
Charges for breakdown Maintenance as per requirement throughout the year
Rupees One hundred
(2) Charges for 1st Routine Maintenance of Dry Services between date of
Ea. 258.00 144.43 Forty Four Paise Forty
commencement to 3rd Months from date of issue of work order.
(3) Charges for 2nd Routine Maintenance of wet Services with water or Chemical Rupees Two hundred
as per site requirement Services between 3rd months to 6th Months from date Ea. 258.00 267.65 Sixty Seven Paise Sixty
of issue of work order. Five Only
Rupees One hundred
(4) Charges for 3rd Routine Maintenance of Dry Services between 6th months to
Ea. 258.00 144.43 Forty Four Paise Forty
9th Months from date of issue of work order.
(5) Charges for 4th Routine Maintenance of wet Services with water or Chemical Rupees Two hundred
as per site requirement Services between 9th months to 12th Months from date Ea. 258.00 267.65 Sixty Seven Paise Sixty
of issue of work order. Five Only
All inclusive comprehensive maintenance cost for the period of one year for the Rupees One Thousand
Split type Air-conditioning Unit of following Capacity (C) 2.0 ton capacity (1) Ea. 9.00 1464.50 Four hundred Sixty Four
Charges for breakdown Maintenance as per requirement throughout the year Paise Fifty Only
Rupees One hundred
(2) Charges for 1st Routine Maintenance of Dry Services between date of
Ea. 9.00 171.70 Seventy One Paise
commencement to 3rd Months from date of issue of work order.
2 12-7-5. (3) Charges for 2nd Routine Maintenance of wet Services with water or Chemical Rupees Three hundred
as per site requirement Services between 3rd months to 6th Months from date Ea. 9.00 317.14 Seventeen Paise
of issue of work order. Fourteen Only
Rupees One hundred
(4) Charges for 3rd Routine Maintenance of Dry Services between 6th months to
Ea. 9.00 171.70 Seventy One Paise
9th Months from date of issue of work order.
(5) Charges for 4th Routine Maintenance of wet Services with water or Chemical Rupees Three hundred
as per site requirement Services between 9th months to 12th Months from date Ea. 9.00 317.14 Seventeen Paise
of issue of work order. Fourteen Only
All inclusive comprehensive maintenance cost for the period of one year for the
Rupees Two Thousand
Inverter Based Split type Air-conditioning Unit of following Capacity (B) 1.5 ton
Ea. 163.00 2282.60 Two hundred Eighty Two
capacity. (A) Charges for breakdown Maintenance as per requirement throughout
Paise Sixty Only
Rupees Two hundred
(B) Charges for 1st Routine Maintenance of Dry Services between date of
Ea. 163.00 267.65 Sixty Seven Paise Sixty
commencement to 3rd Months from date of issue of work order.
(C) Charges for 2nd Routine Maintenance of wet Services with water or Chemical Rupees Four hundred
3 12-7-6. as per site requirement Services between 3rd months to 6th Months from date Ea. 163.00 494.90 Ninety Four Paise Ninety
of issue of work order. Only
Rupees Two hundred
(D) Charges for 3rd Routine Maintenance of Dry Services between 6th months to
Ea. 163.00 267.65 Sixty Seven Paise Sixty
9th Months from date of issue of work order.
(E) Charges for 4th Routine Maintenance of wet Services with water or Chemical Rupees Four hundred
as per site requirement Services between 9th months to 12th Months from date Ea. 163.00 494.90 Ninety Four Paise Ninety
of issue of work order. Only
All inclusive comprehensive maintenance cost for the period of one year for the
Rupees Two Thousand
Inverter Based Split type Air-conditioning Unit of following Capacity (C) 1.7 to
Ea. 7.00 2829.01 Eight hundred Twenty
2.0 ton capacity. (A) Charges for breakdown Maintenance as per requirement
Nine Paise One Only
throughout the year
Rupees Three hundred
(B) Charges for 1st Routine Maintenance of Dry Services between date of
Ea. 7.00 330.27 Thirty Paise Twenty
commencement to 3rd Months from date of issue of work order.
(C) Charges for 2nd Routine Maintenance of wet Services with water or Chemical
4 12-7-6. Rupees Six hundred
as per site requirement Services between 3rd months to 6th Months from date Ea. 7.00 612.06
Twelve Paise Six Only
of issue of work order.
Rupees Three hundred
(D) Charges for 3rd Routine Maintenance of Dry Services between 6th months to
Ea. 7.00 330.27 Thirty Paise Twenty
9th Months from date of issue of work order.
(E) Charges for 4th Routine Maintenance of wet Services with water or
Rupees Six hundred
Chemical as per site requirement Services between 9th months to 12th Ea. 7.00 612.06
Twelve Paise Six Only
Months from date of issue of work order.
Rupees Two Thousand
All inclusive comprehensive maintenance cost for the period of one year for the
Ea. 35.00 2654.28 Six hundred Fifty Four
5 12-7-7. water Cooler of following Capacity (A) 80 Ltr capacity
Paise Twenty Eight Only
(B) 120 / 150 Ltr capacity Ea. 68.00 3339.06 Rupees Three Thousand
All inclusive comprehensive maintenance cost for the period of one year for the
Rupees Six hundred
6 12-7-8. water Heater( Geysers) inclusive inlet & outlet water connections flexible piping of Ea. 102.00 611.05
Eleven Paise Five Only
following Type & Capacity (A) 3 to 10 Ltr Instant /Storage Type
Total Amount (without GST) in Rs.(A)
Total Amount (without GST) in Rs.(A)
A.E (Elect.) Dy. Executive Eng.(Elect.)
PIU,Kheda P.I.U.,Sola
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
0.SBD Book CR AC Water Cooler Kheda Anand Dist 2025-26.pdf
ANNEXURE-A.pdf
ANNEXURE-C.pdf
New Notice no - 23.pdf
PQ CRITERIA For Example .pdf
schedule b.pdf
Standard Specification for Electrical Work.pdf
Terms and Conditions For AC Machines.pdf
Download all tender documents and submit your bid