Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹25.3 LAccepted-AOC | I | Accepted-AOC First Lowest | |
| 2 | II₹29.9 LAccepted-AOC | II | Accepted-AOC Second Lowest |
Tender Value
Refer Docs
EMD Value
₹63,500
Closing Date
26 Oct 2023, 5:00 pmClosed
Superitending Engineer
Superintending Engineer, Mechanical Circle, UPJN, Haldwani
Supply Installation Testing and Commissioning of 05 Nos Solar Dual Power Hand Pump System for Existing India Mark II with 5 year Comprehensive maintenance including one years defect liability period in Dhari Okhalkanda Block Distt Nainital
2023_MDPEY_64688_1
1524/G-7/66 Dated 10-10-2023
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
90 days
Bhimtal
Please refer tender documents
3 documents required · 3 mandatory
₹2,950
Executive Engineer, Mechanical Division. UPJN, Hal
₹63,500
Haldwani
20 Jun 2025
16 Oct 2023
28 Oct 2023
16 Oct 2023
26 Oct 2023
19 Oct 2023
18 Oct 2023
Amount
Providing Galvanized Special water chamber for making of Solar Dual Pumping system
Providing Stainless steel cylinder of O.D. 75 mm for solar Dual pumping system
Providing & fixing submersible cable 3 core 2.5 sq.mm (5No X 100 Mtr Each)
Providing HDPE pipe of 6 Kg per cm square of 32 mm dia for Solar sub pump. (5No X 75 Mtr Each)
Supplying & erecting water level controller.
Supply and laying of 2x2.5 sq mm FR PVC copper wire in rigid PVC conduit pipe of minimum 20 mm Dia along with 2.5sq.mm earth wire. (5No X 0 Mtr Each)
Construction of foundation for solar PV panel including supply of all material, labour, T&P etc.
Supply & Installation of hot dip galvanized steel structure on suitable solid foundation made of reinforced cement concrete for above mentioned solar PV panels and water storage tank, minimum 3 mt. height.
Vinyl Painting on steel structure and S&F of M.S painted board including paint, material etc complete.
Supply & Installation of 5000 ltr HDPE water storage tank at 3 meter height on steel structure.
Supply and laying of 32mm dia G.I. Pipe including excavation of trenches, connection of pipes, with all labour , T& P etc complete as required.
Supply and laying of 20mm GI Pipe from HDPE water tank to stand post including supply of all material, labour, excavation and connection etc as required. (5No X 50 Mtr Each)
Providing & construction two taps stand post including supply of all material, labour, T&P etc including all required excavation and connection as required. (5No X 2 No Each)
Comprehensive maintenance contract charges of 5 years for solar water pumping system including one years defect liability period
shyam engineers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .