Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-Finance N A | PALWAL | HARYANA | 121004 | ₹4.7 L | 1 | Accepted-Finance L2 |
| 2 | 2₹4.9 L+₹13,000 (2.75%)Rejected-Finance N A | FARIDABAD | HARYANA | 121004 | ₹4.9 L+₹13,000 (2.75%) | 2 | Rejected-Finance L2 |
| 3 | 3₹5.0 L+₹22,000 (4.65%)Rejected-Finance HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 172111 | ₹5.0 L+₹22,000 (4.65%) | 3 | Rejected-Finance L3 |
| 4 | Rejected-Technical R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | - | - | Rejected-Technical Reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Nisha Kumari L1 | MUKHTIAR SINGH PATIYAL L3 | Sukh Dev L2 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Harlog Challeli whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 4,73,000 ₹4,73,000 Lowest | 4,95,000 ₹4,95,000 | 4,86,000 ₹4,86,000 |
| 2.00Description of main components of the scheme is as under:- | ||||||
| 2.01Civil works: 1 No pump house, Rising main: Booster stage 65mm dia 30 Rmt, 1st stage 65mm dia 840 Rmt Pumping machinery:Booster stage: 2x5=10 HP, 1st stage 2x30=60 HP. Distribution system: 85.10 Km No of storage tanks: 1 No main storage tank & 5 Nos sub storage tank, Total working hours: 18 through , 3 Nos perons. Indicators to be mentioned:Average per day 2 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: (72000 Litr). | ||||||
Tender Value
₹4.8 L
EMD Value
₹9,530
Closing Date
7 Aug 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Harlog Challeli Tehsil Ghumariwn District Bilaspur (SH Operation and maintenance of pumping machinery and distribution system of water supply for sector storage tank to different habitations for one year)
2026_HPIPH_140208_2
BLP-BLP-0736-NIT No. 6646-6744 Dated 27/07/2026
Open Tender
Civil Works
Item Rate
365 days
Sub Division Kandrour Section Harlog
Please refer Tender documents.
4 documents required · 4 mandatory
₹350
₹9,530
30 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Harlog Challeli whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 108 | ₹108 |
| 2Description of main components of the scheme is as under:- | |||||
| 2.01 | Civil works: 1 No pump house,
Rising main: Booster stage 65mm dia 30 Rmt, 1st stage 65mm dia 840 Rmt
Pumping machinery:Booster stage: 2x5=10 HP, 1st stage 2x30=60 HP.
Distribution system: 85.10 Km
No of storage tanks: 1 No main storage tank & 5 Nos sub storage tank, Total working hours: 18 through , 3 Nos perons.
Indicators to be mentioned:Average per day 2 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No.
Quantity of water lifted per day: (72000 Litr). | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
PWD6.pdf
Tender Documents • 0.40 MB
PWD8.pdf
Tender Documents • 1.32 MB
TC.pdf
Tender Documents • 0.18 MB
BOQ_207919.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .