| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC APRA A 20 DEVIKRIPA MARUTHOORKADAVU KALADY KARAMANA P O | L1 | Accepted-AOC Being L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically qualified rejected being L6 | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically qualified it is rejected being L3 | |
| 4 | Rejected-Technical M K ENGINEERS AND CONTRACTORS PARASSALA TVPM | PARASSALA | THIRUVANANTHAPURAM | KERALA | - | Rejected-Technical Technically qualified it is cancelled being L2 | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically qualified it is rejected being L4 |
| Sl No | Description | Qty | Unit | RATHEESH D L5 | Arun Kumar L1 | ARUN S KUMAR L3 | MANOJ KUMAR S (M.K.Engineers And Contractor) L2 | N.AJANTHA KUMAR L4 | ABHILASH V N L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Civil Works | |||||||||
| 1.00 | 15.23.2:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles above 25 mm and up to 40 mm | 178.5 | sqm | 111 ₹19,813.5 | 95 ₹16,957.5 | 90 ₹16,065 | 40 ₹7,140 Lowest | 80 ₹14,280 | 90 ₹16,065 |
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 121.1 | sqm | 53 ₹6,418.3 | 45 ₹5,449.5 | 48.86 ₹5,916.95 | 30 ₹3,633 Lowest | 60 ₹7,266 | 70 ₹8,477 |
| 1.00 | 15.60:Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 129.36 | cum | 261 ₹33,763.22 | 238 ₹30,787.92 | 200 ₹25,872.2 Lowest | 200 ₹25,872.2 Lowest | 400 ₹51,744.4 | 500 ₹64,680.5 |
| 1.00 | 50.4.1.1:Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc. | 7.75 | cum | 8,687 ₹67,341.62 | 7,950 ₹61,628.4 | 7,700 ₹59,690.4 | 7,000 ₹54,264 Lowest | 9,000 ₹69,768 | 9,500 ₹73,644 |
| 1.00 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 49.5 | sqm | 366 ₹18,117 | 338 ₹16,731 | 333.19 ₹16,492.91 | 200 ₹9,900 Lowest | 380 ₹18,810 | 400 ₹19,800 |
| 1.01 | OD165027/2025-2026:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), excluding grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm. | 456.25 | sqm | 1,448 ₹6,60,650 | 1,300 ₹5,93,125 Lowest | 1,350 ₹6,15,937.5 | 1,300 ₹5,93,125 Lowest | 1,400 ₹6,38,750 | 1,500 ₹6,84,375 |
| 1.01 | 11.48.2:Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg). including filling /grouting and finishing complete as per direction of Engineer-in-charge.Size of Tile 600x600 mm | 526.93 | sqm | 308 ₹1,62,294.44 | 280 ₹1,47,540.4 | 300 ₹1,58,079 | 125 ₹65,866.25 Lowest | 250 ₹1,31,732.5 | 300 ₹1,58,079 |
| 1.01 | OD106651/2025-2026:Providing and fixing 3mm thick Aluminum Composite Panel (ACP), in panelling fixed in aluminium doors, windows shutters and partition frames with C. P. brass/stainless steel screws etc. complete as per architectural drawings and directions of Engineer-in-Charge | 126.17 | sqm | 996 ₹1,25,665.32 | 1,000 ₹1,26,170 | 906.8 ₹1,14,410.96 Lowest | 1,750 ₹2,20,797.5 | 1,150 ₹1,45,095.5 | 1,200 ₹1,51,404 |
| 1.01 | OD106650/2025-2026:Supplying and fixing window film sticker on existing glazed portion of window glass including all labour charges cost of materials etc complete as directed by departmental officers in charge | 61.05 | sqm | 54 ₹3,296.7 | 47 ₹2,869.35 Lowest | 49.6 ₹3,028.08 | 100 ₹6,105 | 415 ₹25,335.75 | 420 ₹25,641 |
Tender Value
₹20.3 L
EMD Value
₹50,000
Closing Date
14 Oct 2025, 5:00 pmClosed
Executive Engineer
PWD Buildings Division Thiruvananthapuram
General-Partition and false ceiling at PTC roof top Providing partition and false ceiling at PTC main Building roof top sheet roof area Civil work
2025_PWD_805247_1
TR/13313/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
120 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
11 Nov 2025
4 Oct 2025
17 Oct 2025
4 Oct 2025
14 Oct 2025
4 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1340268.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .