| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC DHARMANAGAR TRIPURA WEST | ₹1.7 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.7 Cr+₹4.7 L (2.78%)Rejected-Finance SHIBNAGAR AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799001 | ₹1.7 Cr+₹4.7 L (2.78%) | L2 | Rejected-Finance Rejected due to L2 bidder |
| 3 | L3₹1.9 Cr+₹18.6 L (11.0%)Rejected-Finance | ₹1.9 Cr+₹18.6 L (11.0%) | L3 | Rejected-Finance Rejected due to L3 bidder |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
8 Nov 2022, 5:00 pmClosed
DGM under ED-DMR
O/o the DGM under ED-DMR
Extension of HT/LT line including sub-stn for DWS scheme under ED-DMR
2022_POWER_32930_1
DGM/ED-DMR/22-23/04
Open Tender
Electrical Works
Turn-key
1801 days
DWS scheme under ED-DMR
As per NIT
3 documents required · 3 mandatory
₹10,000
Yes
₹3.5 L
Yes
O/o the DGM under ED-DMR
11 Aug 2023
17 Oct 2022
9 Nov 2022
17 Oct 2022
8 Nov 2022
28 Oct 2022
17 Oct 2022 - 21 Oct 2022
25 Oct 2022
Amount
SCHEDULE-A Supply
9 mtr Long PCC pole
8 mtr. Long PCC pole
Stay set Complete
Stay wire 7/2.5mm
Stay insulator(HT)
Stay insulator (LT)
LT Shackle insulator
Straps with Nuts & Bolts
MS Channel 100X50X50X6 mm
MS Channel 75X40X40X6 mm
MS Angle 65X65X6 mm
MS Angle 50X50X6 mm
11 KV Polymer pin insulator
11 KV polymer disc insulator
11 KV Disc fittings
ACSR (6/1/2.59mm)
GI wire 8 SWG
GI wire 10 SWG for S/C
11 KV GOS unit(3-phase)
11 KV DOF unit (3-phase)
11 KV polimeric L.A.(9 KV, 5KA)
100 Amp Cut out
40 mm dia GI pipe 2.5 mtr long (Make:-TATA/JINDAL)
60 kg salt 7 55 kg Charcoal (For 1 pit)
LT 95 sq.mm PVC cable
LT 16 sq.mm. PVC cable
M.S. Nuts & Bolts i/c washer, ISI markedmachine made(assorted size)
Stay Clamps of MS Flat (50X6mm)
Febricated Brackets clamps of MS Flat (50X6mm)
11 KV Danger Plate (HT)
11 KV Danger Plate (LT)
Wooden plank 1X0.25X0.038 mtr, (local Teak wood) for cut out
Bimetalic Lugs (Assorted Size)
Reel insulator
SCHEDULE-B Dismantle
9mtr. Long steel pole
9mtr. Long pcc pole
8 mtr. Long pcc pole
11KV Top bracket (0.3 mtr. Long) 75 channel
11KV "V" X-arm (75 Channel)
11KV single Disc. Insulator set along with necessary fittings
11KV Pin Insulator
Shackle insulator
Cross-arm 2/3/4 wire upto 1.1mtr.(50/65 angle)
Stay set
ACSR 6/1/2.59mm
8swg G.I.wire
Cradle Guard HT/LT
Dismantaling existing 1phase Service Connection with PVC cable from nearby Electrical pole to premises i/c. G.I. wire, real insulator
SCHEDULE-C Erection
Erection of 9.00 mtrs length of PCC pole at any kind of soil upto a depth of 1/6th of pole height , i/c excavation of earth , refilling the pit with soil upto the ground level, ramming and making complete in all respect .
9mtr. Long steel pole ( Dismantled pole)
Erection of 8.00 mtrs length of PCC pole at any kind of soil upto a depth of 1/6th of pole height , i/c excavation of earth , refilling the pit with soil upto the ground level, ramming and making complete in all respect i/c Hand-cart carriage & mannual carriage with necessary loading & unloading.
Erection of stay set direct in earth complete with 19mm X 1800mm long stay rod , anchor plate of size 300X300x8 mm , thimble, turn buckle, 7/2.5mm dia GI stranded stay wire and stay insulator etc.with supply of MS clamp, nuts 7 bolts etc as required and making complete in all respect .
Erection of MS Channel cross arm 2.8 mt.long 100X50X50X6 mm for Sub-Station bracket (for line & txr base)
Erection of MS Channel cross arm 0.65 mt.long 100X50X50X6 mm for Sub-Station bracket ( for Txr base)
Erection of MS Channel cross arm 2.8 mt.long 75X40X40X6 mm for Sub-Station bracket (for GOS & DOF)
Erection of MS angle cross arm 2.8 mt.long 65X65X6 mm MS angle for Sub-Station bracket (for GOS Handle)
Erection of MS angle cross arm 3.1 mt.long 65X65X6 mm MS angle for Sub-Station Guard bracket
Erection of MS Channel cross arm 0.3 mt.long 75X40X40X6 mm (SP Top Bracket for 11KV line)
Erection of MS Channel cross arm 1.2 mt.long 75X40X40X6 mm (SP Bottom Bracket for 11KV line)
Erection of MS angle cross arm 1.5 mt.long 65X65X6 mm ( SP guard Bracket for 11KV line)
Erection of MS Channel cross arm 1.2 mt.long 75X40X40X6 mm (DP Top Bracket for 11KV line)
Erection of MS Channel cross arm 1.6 mt.long 75X40X40X6 mm (DP Bottom Bracket for 11KV line)
Erection of MS Channel cross arm 2.5 mt.long 75X40X40X6 mm (DP Out-Gank Bracket for 11KV line)
Erection of MS angle cross arm 2.5 mt.long 65X65X6 mm ( DP out-Gang GO,DO,handle Bracket for 11KV line)
Erection of MS angle cross arm 1.7 mt.long 65X65X6 mm ( DP guard Bracket for 11KV line)
Erection of MS angle cross arm bracket for LT line upto 1.2 mtr. Long of 50X50X6 mm
Erection of shackle insulator of size 75 mm X 90 mm/ 100 mmm X15mm with straps & bolts/ clamps on poles
Erection of 11 KV Polymer pin insulator
Erection of 11 KV polymer disc insulator set alongwith necessary fittings
Laying & stringing of 1 km (single conductor ) ACSR 6/1/2.59mm dia weasel i/c hoisting & binding etc. complete as reqd.
Laying & stringing of 1 km (single conductor ) 8 SWG GI wire i/c hoisting & binding etc. complete as reqd.
Erection of 11 KV 200 Amps GOS unit set of three nos i/c necessary connection complete as per technical specification
Erection of 11 KV DOF unit set of three nos i/c necessary connection complete as per technical specification
Erection of 9 KV, 5KA single pole metal oxide gapless type i/c necessary connection complete as per technical specification
Installation / positioning of 11/0.430 KV , 3-phase 63 KVA of distribution transformer on pole with necessary connection and fitting fixing of all allied assessories components as required for making complete in all respect for energizing . (TSECL SUPPLY)
Earthing with GI pipe 2.5 mtr. Long and 40 mm dia i/c excavation , refilling with alternate layer of salt and charcoal as per drawing
Laying of 8 SWG GI wire at 300 mm below the ground level for earthing of sub-station equipments from the earth electrode.
Providing 3 phase service connection with laying PVC cable from nearby electrical pole to premises upto 35 mtr. In length supported by GI wire, reel insulator i/c fitting fixing of energy meter as required.
Febrication of cross arms by MS Channel/ MS Angle as per specification
Erection of Danger plate on OH lines (11KV/415 volts)
Providing protective Sub-Station fencing of approve quality as per technical specification i/c supply of all materials.
Erection of 11 KV protective guarding by GI wire 8 SWG as per technical specification, across road/river/telecom line etc. in horizontal formation complete
Erection of 11 KV protective guarding/ Cross lacing for 415/240 volt line by GI wire 8/10 SWG as per technical specification, across road/river/telecom line etc. in horizontal/vertical formation complete with spool/ reel insulator.
Erection of anti-climbing devices viz barbed wires on pole structures including supply of barbed wres in helical form 7.5 cm. apart starting from ground level (1.5 Kg. / pole) as per direction of Engineer-in-charge.
GI coil earthing (spiral earthing) i/c supply of necessary materials as per REC specification.
Jungle Cutting
Supply of Vehical With Driver ( Supervision of Site)
SCHEDULE-D Carriage of 11/0.430, 3 phase 63 KVA Transformer by Mechanical Transport from the Sub-Divisional store yard to working site i/c. loading, unloading and placing on base, as required :-
a) Upto the lead range 25km
SCHEDULE-E Carriage of 9.0mtr. Length of PCC poles by Mechanical Transport from the factory / Sub-divisional store to working site Vis-à-vis i/c. loading, unloading and stacking as required :-
a) For maximum 04(four) pole
b) Beyond 04(four) poles
SCHEDULE-F Carriage of 8.00 mtr. Length of PCC poles by Mechanical Transport from the factory / Sub-divisional store to working site Vis-à-vis i/c. loading, unloading and stacking as required :-
a) Upto the lead range 125 KM (for max. 5nos. Poles)
b) Beyond 05(five) poles
SCHEDULE-G Carriage of materials such as cable, AAC, AAAc, ACSR, GI wire, cross-arm, stay set, insulators etc. by Mechanical Transport from factory / the Sub-Divisional store yard to working site Vis-à-vis i/c. loading, unloading and stacking as required :-PCC poles by Mechanical Transport from the Sub-Divisional store yard working site Vis-à-vis i/c. loading, unloading and stacking as required :-
a) Upto the lead range 125 KM
SCHEDULE-H Carriage of G.O.S., D.O.F. L. A. etc. by Mechanical Transport from factory /the Sub-Divisional store yard to working site Vis-à-vis i/c. loading, unloading and stacking as required :-
a) Upto the lead range 125 KM
SCHEDULE-I Grouting of 19 nos. 9mtr steel tubular pole of ratio 1:2:4(1cement: 2 river send: 4 jhama brick aggregate) of 20mm normal size i/c. Supply of cement,send & jhama brick aggregate complect excavation,refilling & ramming of cach alongwith centering & shuttaring ang clamping.(per pole= 0.392cum)
a) 19 nos 9 mtr. Long steel pole ((per pole= 0.392cum))
RANJAN BHATTACHARJEE
THE TRIPURA ELECTRICAL HOUSE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .