Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | ₹5.0 L | L1 | Accepted-AOC Awarded |
| 2 | L1₹5.0 LRejected-AOC | ₹5.0 L | L1 | Rejected-AOC Rejected by the Committee Members |
| 3 | L1₹5.0 LRejected-AOC | ₹5.0 L | L1 | Rejected-AOC Rejected by the Committee Members |
| 4 | L1₹5.0 LRejected-AOC | ₹5.0 L | L1 | Rejected-AOC Rejected by the Committee Members |
| 5 | L1₹5.0 LRejected-AOC | ₹5.0 L | L1 | Rejected-AOC Rejected by the Committee Members |
Tender Value
₹5.0 L
EMD Value
₹5,042
Closing Date
16 Jun 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO.II, SUNDARGARH
R.W.Sub-Division Office at Kuarmunda_building
2026_CERWI_131500_1
OnlineEERKL 08/2025-26
Open Tender
Civil Works - Buildings
Percentage
60 days
ROURKELA
2 documents required · 2 mandatory
₹4,000
₹5,042
Yes
21 Sept 2026
8 Jun 2026
17 Jun 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
8 Jun 2026 - 15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in hard soil with initial lead and lift including dressing & levelling the foundation bed and depositing the excavated earth away from work site etc. completeas per direction of the E.I.C.. | 30.32 | Cum | 210.5 | ₹6,382.36 |
| 2 | Filling in foundation and plinth with sand well watered and rammed including cost conveyance and royalty etc. complete. | 8.36 | cum | 556.8 | ₹4,654.85 |
| 3 | Providing and laying P.C.C. (1:3:6) in foundation trench and below flooring using 40mm down graded chrusher broken HG Metal, including compaction, curing including cost of all materials and labour etc. complete as per direction of Engineer- In -Charge. | 7.2 | cum | 6,052.2 | ₹43,575.84 |
| 4 | Cement Concrete (1:2:4) with 12mm size hard granite chips | 3.08 | cum | 7,701.6 | ₹23,720.93 |
| 5 | Brickwork with Cement Flyash Bricks in cement mortar (1:6) in Foundation and Plinth. including cost conveyance and royalty etc. complete. | 20.35 | cum | 5,261.2 | ₹1,07,065.42 |
| 6 | Brickwork with Cement Flyash Bricks in cement mortar (1:6) in Super structure including cost conveyance and royalty etc. complete. | 12.34 | cum | 5,299.5 | ₹65,395.83 |
| 7 | 16mm thick cement plaster (1:6) over Brick / stone massonary finished smooth including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect in all floors or as directed by the Engineer-in-charge | 53.64 | sqm | 265.8 | ₹14,257.51 |
| 8 | 12mm thick cement plaster (1:6) over Brick / stone massonary finished smooth including watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect in all floors or as directed by the Engineer-in-charge | 53.64 | sqm | 180.2 | ₹9,665.93 |
| 9 | Dismantling and removing doors, windows & ventilators including removal of frame,hinges,fastenings and stacking the useful materials for reuse and removing the debris within 50m lead. | 12.42 | sqm | 461.9 | ₹5,736.8 |
| 10 | Supplying fitting fixing of two track UPVC sliding Window of approved make with 6mm thick glass approved quality complete with frame shutters and all fitting and fixtures | 3.6 | sqm | 5,010.58 | ₹18,038.09 |
stage.html
html • 0.09 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.31 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_595263.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .