Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.6 L+₹26,476.24 (11.2%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.6 L+₹27,490 (11.6%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AMEER ALI N. L1 | RedRock Developers L3 | Musthafa KT L2 |
|---|---|---|---|---|---|---|
| 1.00Construction of toilet block at GLPSchool,Poothuruthi | ||||||
| 1.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 4.37 | cum | 359.72 ₹1,571.98 Lowest | 1,359.72 ₹5,941.98 | 500 ₹2,185 |
| 1.02 | 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 4.37 | cum | 3,993.46 ₹17,451.42 Lowest | 3,993.46 ₹17,451.42 Lowest | 5,000 ₹21,850 |
| 1.03 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 3.12 | sqm | 386.16 ₹1,204.82 Lowest | 1,386.16 ₹4,324.82 | 500 ₹1,560 |
| 1.04 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work upto plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.48 | cum | 10,488.77 ₹5,034.61 Lowest | 10,488.77 ₹5,034.61 Lowest | 10,488.77 ₹5,034.61 Lowest |
| 1.05 | 7.1.1
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.72 | cum | 8,343.49 ₹22,694.29 Lowest | 8,343.49 ₹22,694.29 Lowest | 8,343.49 ₹22,694.29 Lowest |
| 1.06 | 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 3.28 | cum | 318.47 ₹1,044.58 Lowest | 318.47 ₹1,044.58 Lowest | 318.47 ₹1,044.58 Lowest |
| 1.07 | 50.6.1.5
Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 3.69 | cum | 7,279.03 ₹26,859.62 Lowest | 7,279.03 ₹26,859.62 Lowest | 7,279.03 ₹26,859.62 Lowest |
| 1.08 | 5.4
Providing and laying up to floor five level reinforced cement concrete in kerbs, steps and the like excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.94 | cum | 12,291.55 ₹11,554.06 Lowest | 12,291.55 ₹11,554.06 Lowest | 12,291.55 ₹11,554.06 Lowest |
| 1.09 | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 131.96 | kg | 112.43 ₹14,836.26 Lowest | 112.43 ₹14,836.26 Lowest | 200 ₹26,392 |
Tender Value
₹3 L
Closing Date
6 Nov 2025, 5:00 pmClosed
BaijuT P
Forest Industries Travancore Limited , Aluva
Toilet Block
2025_FITL_817179_1
FIT/CP-107/2025-26
Open Tender
Civil Works - Roads
Item Rate
365 days
wadakancheri Muncipality
Refer Tender Document
8 documents required · 8 mandatory
₹2,950
Exempted
Forest Industries Travancore Limited Thaikkattukar
12 Nov 2025
30 Oct 2025
7 Nov 2025
30 Oct 2025
6 Nov 2025
30 Oct 2025
30 Oct 2025 - 3 Nov 2025
3 Nov 2025
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1369132.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .