Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 CrAccepted-AOC | ₹11.9 Cr | L1 | Accepted-AOC lowest rate |
| 2 | L2₹15.1 CrRejected-Finance P O BADARPURGHAT DIST HAILAKANDI ASSAM PIN 788803 | KARIMGANJ | ASSAM | 788803 | ₹15.1 Cr | L2 | Rejected-Finance Firm has quoted high rate |
Tender Value
Refer Docs
Closing Date
7 Jun 2021, 10:00 amClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizoram
PDG AND LYG OF READY MIX BC 30 MM TH AND APPLYING TACK COAT INCL CORRECTION WK FOR RESURF WK BET KM 0 PT00 AND KM 136 PT 35 NET LENGTH 43 PT 547 KM ON HSS RD UNDER 71 RCC PROJECT PUSHPAK IN MIZORAM STATE 2ND CALL
2021_BRO_443064_1
CA CE (P) PSK/12/2020-21
Open Tender
Civil Works - Roads
240 days
BET KM 0.000 to KM 136.350 ON HSS RD
As per Tender Docs
8 documents required · 8 mandatory
₹0
Exempted
HQ CE (P) Pushpak C/O 99 APO Zemabawk Aizawl Mizor
26 Aug 2021
15 May 2021
8 Jun 2021
15 May 2021
7 Jun 2021
24 May 2021
17 May 2021 - 22 May 2021
21 May 2021
Amount
RESURFACING WORK ON HNATHIAL-SANGAU-SAIHA ROAD KM 0.000 TO KM 4.000, KM 10.835 TO KM 10.895, KM KM 14.640 TO KM 15.000, KM 29.440 TO KM 29.850, KM 36.300 TO KM 40.400, KM 59.000 TO KM 82.690, KM 83.110 TO KM 86.000, KM 95.000 TO KM 96.077, KM 96.577 TO KM 96.977, KM 97.177 TO KM 98.550, KM 108.430 TO KM 117.400, KM 124.550 TO KM 124.800 AND KM 136.112 TO KM 136.350
Providing and laying of Bituminous Concrete (BC) 30 mm thick consolidated with bitumen VG-10/VG-30 as per clause 507 of MoRT&H (Ministry of Road Transports and Highways)(fifth revision) specification for road & bridge works, including tack coat as per clause 503 of MoRT&H (fifth revision) on the already existing BT surface, correction work with WBM 75 mm thick consolidated as per Clause 404 of MoRT&H (Fifth revision) and Prime coat over WBM correction surface as per Clause 502 of MoRT&H (Fifth revision) duly maintaining the road profile and laying the ready mix for Bituminous Concrete 30 mm with paver finisher and rolled as per clause 501.6 and 501.7 of Mort&H (fifth revision) to achieve desired compaction (including cost of conveyance of mix). Note : 1. The specification given at Clause 3004.2 of MoRT&H (Fifth revision) specifications will be complied while carried out correction work i.e Preparation of area for potholes and patch repair, filling/spreading with WBM materials and application of bitumen emulsion (prime coat) 2. The maximum area of correction work with WBM 75 mm thick consolidated will be 10% of BC area
SLT INFRACON PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid