Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | L1 | Accepted-AOC Accepted |
Tender Value
₹16.9 L
EMD Value
₹42,218
Closing Date
18 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer
The Executive Engineer Roads Division Kollam
GENERAL RM 2022-23/cluster 2 one year RC Karunagappally KLM RM 2022-23 Zone 2 One year Running Contract for Various PWD Roads Under Roads Section Karunagappally in Kollam District 3 road stretches for a length of 15.20 Km
2023_PWD_562511_9
130/ET/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
360 days
Kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹42,218
Yes
13 Oct 2023
10 Jul 2023
20 Jul 2023
10 Jul 2023
18 Jul 2023
10 Jul 2023
Amount
Appendix A Reactive Maintenance/Initial rectification
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
Appendix B Premonsoon works
OD130669/2022-2023:Engaging Hydraulic Excavator of 1cum bucket for various works as directed by the officer in charge.
OD130659/2022-2023:Engaging tipper for conveying waste and debrisfrom site as per the direction of departmental officers in charge
OD130667/2022-2023:Engaging Man mazdoor for lowering side berms,clearing side berms,clearing side drains,removing silt from culverts,cutting earthen drains,diverting blocked water,removing the branches of trees leaned towards the road threatening pedestrains and traffic and removal of fallen trees or branches on the road clearing traffic blockage,stack the wood at suitable place, clearing silt and clay deposited in the BT surfaceand various works as directed by engineer in charge etc
OD130668/2022-2023:Filling up pot holes with bituminous ready mix compacting (25kg bag) and compacted (rate is arrived a bag of 25kg )and compacted by ramming to get a compact surface including cost of materials laying charges, transportation to site etc complete. Assuming that an average of 30 bag of 25kg ready mix compound will laid in pot holes in a day
Appendix C Proactive/Preventive Maintenance
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
Appendix D Road Emergency works
OD130706/2022-2023:Engaging Man mazdoor for lowering side berms,clearing side berms,clearing side drains,removing silt from culverts,cutting earthen drains,diverting blocked water,removing the branches of trees leaned towards the road threatening pedestrains and traffic and removal of fallen trees or branches on the road clearing traffic blockage,stack the wood at suitable place, clearing silt and clay deposited in the BT surfaceand various works as directed by engineer in charge etc
OD130707/2022-2023:Engaging tipper for conveying waste and debrisfrom site as per the direction of departmental officers in charge
OD130708/2022-2023:Engaging Hydraulic Excavator of 1cum bucket for various works as directed by the officer in charge.
Appendix E Routine Inspection Charges
OD32051/2022-2023:Conducting and Reporting Routine Inspections for the entire length of the Project Road frequency of 7 days throughout the agreement period of the Running Contract as directed by the departmental officers at site. Additional RI may be required in response to reports of complaints from the police, other authorities and the public as a result of major incidents, typhoon or flooding damages etc and are not measurable/ payable. A proportion of the RI should be carried out either during or immediately following a period of we weather.
Bidder Name
ATHINAN B
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_867737.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .