Tender Value
₹3.3 L
Closing Date
2 Apr 2026, 5:00 pmClosed
MUNICIPALITIES ANDHRA PRADESH
Construction of Village Health Clinic Building ( Secretariat Code 10590348 NIN No 1121148173) at Doddanapudi 2 village of Kalla Mand
914905
01/2025-26/GENERAL FUNDS/E3/8 dated : 17.04.2025
OPEN - NCB
Works
Andhra Pradesh
17 Apr 2026
28 Apr 2025
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308) ncluding Cost and Conveyance of all Materials and all Labour Charges etc Complete but Excluding Seignorage and GST Charges. in Ordinary Soils Manual Means
Bailing out water for earth work excavation /concrete for foundation below water level. (For building items only) - Other than sandy soil - 2.0 M to 3.0 M ncluding Cost and Conveyance of all Materials and all Labour Charges etc Complete but Excluding Seignorage and GST Charges.
Filling with Excavated Earth in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Filling with Stone Dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
MAT-05352 Pre construction Anti termite is a process in which chemical toxic to subterrean termites is apply/ inject into soil during early stage of building Construction 2. Treatement of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuouschemical barrier beneath the building which kills or repels terminates & impervious to tremite entry Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the colums , plinth beams (Back filling) walls and floor junction, external perimeters, along reatining wall @ 5.0 Liters/Sqm of the horizontalsurface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around coulmns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for sparying, rodding etc. completefor furnished item of work as per the approval of the Engineer-in-charge
Plain Cement Concrete (1:4:8) Proportion for foundation and flooring bed using Specified Quantity of 40 mm size HBG / Machine Crushed Granite Metal and Specified Quantity of Fine Aggregate (Sand) as per IS 383 Code and Specified Quantity of Cement, machine mixing , laying concrete in fourndations and under flooring bed, Ramming in 15 cm layers, Finished top surface to the required level ,Curing etc, Complete including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Ground Floor Providing HYSD steel bars (Fe-500) grade asper IS 1786-1985) of 8mm to 40mm diameters cutting, bending to required sizes and shapes placing in position with cover blocks of approved sizes and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and coveyance of binding wire and all labour charges, such as cutting, bending, placing inpostion, tying etc and sales tax etc including contractors profit for finished item of work (APSS No. 126)
Ground Floor Cost and supply of MS Grills including cost and conveyance of bars from approved sources to site of work, including cost and coveyance of binding wire and allLabour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, excluding cost of fixing in positi, such as cutting, bending, placing inpostion, tying etc and sales tax etc including contractors profit for finished item of work (APSS No. 126)
FOOTINGS -Vibratory Reinforced Cement Concrete M30 Grade using Specified Quantity of 20mm Graded M/C Metal & 12 mm Graded M/C Metal HBG / Machine Crushed Granite Metal and Specified Quantity of Fine Aggregate (Sand) as per IS 383 Code and Specified Quantity of Cement Machine Mixing , Laying concrete, Vibratory Charges , Finished top surface to the required level ,Curing etc, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
PEDESTAL -Vibratory Reinforced Cement Concrete M30 Grade using Specified Quantity of 20mm Graded M/C Metal & 12 mm Graded M/C Metal HBG / Machine Crushed Granite Metal and Specified Quantity of Fine Aggregate (Sand) as per IS 383 Code and Specified Quantity of Cement Machine Mixing , Laying concrete, Vibratory Charges , Finished top surface to the required level ,Curing etc, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
PLINTH BEAM -Vibratory Reinforced Cement Concrete M30 Grade using Specified Quantity of 20mm Graded M/C Metal & 12 mm Graded M/C Metal HBG / Machine Crushed Granite Metal and Specified Quantity of Fine Aggregate (Sand) as per IS 383 Code and Specified Quantity of Cement Machine Mixing , Laying concrete, Vibratory Charges , Finished top surface to the required level ,Curing etc, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Columns Ground Floor -Vibratory Reinforced Cement Concrete M30 Grade using Specified Quantity of 20mm Graded M/C Metal & 12 mm Graded M/C Metal HBG / Machine Crushed Granite Metal and Specified Quantity of Fine Aggregate (Sand) as per IS 383 Code and Specified Quantity of Cement Machine Mixing , Laying concrete, Vibratory Charges , Finished top surface to the required level ,Curing etc, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Lintels Ground Floor -Vibratory Reinforced Cement Concrete M30 Grade using Specified Quantity of 20mm Graded M/C Metal & 12 mm Graded M/C Metal HBG / Machine Crushed Granite Metal and Specified Quantity of Fine Aggregate (Sand) as per IS 383 Code and Specified Quantity of Cement Machine Mixing , Laying concrete, Vibratory Charges , Finished top surface to the required level ,Curing etc, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Sunshades Ground Floor -Vibratory Reinforced Cement Concrete M30 Grade using Specified Quantity of 20mm Graded M/C Metal & 12 mm Graded M/C Metal HBG / Machine Crushed Granite Metal and Specified Quantity of Fine Aggregate (Sand) as per IS 383 Code and Specified Quantity of Cement Machine Mixing , Laying concrete, Vibratory Charges , Finished top surface to the required level ,Curing etc, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Roof Beams Ground Floor -Vibratory Reinforced Cement Concrete M30 Grade using Specified Quantity of 20mm Graded M/C Metal & 12 mm Graded M/C Metal HBG / Machine Crushed Granite Metal and Specified Quantity of Fine Aggregate (Sand) as per IS 383 Code and Specified Quantity of Cement Machine Mixing , Laying concrete, Vibratory Charges , Finished top surface to the required level ,Curing etc, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Roof Slab 125 mm Thickness Ground Floor -Vibratory Reinforced Cement Concrete M30 Grade using Specified Quantity of 20mm Graded M/C Metal & 12 mm Graded M/C Metal HBG / Machine Crushed Granite Metal and Specified Quantity of Fine Aggregate (Sand) as per IS 383 Code and Specified Quantity of Cement Machine Mixing , Laying concrete, Vibratory Charges , Finished top surface to the required level ,Curing etc, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Brick Masonry work in CM (1:6) for Basement with Well Burnt Bricks 2nd Class traditional size (23 x 11 x 7 cm) Materials like cement, sand, bricks, wate etc, to site ,all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scafforliding charges, lift charges, curing cahrges, etc, for the work including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Brick Masonry work in CM (1:8) for Superstructure Ground Floor with Well Burnt Bricks 2nd Class traditional size (23 x 11 x 7 cm) Materials like cement, sand, bricks, wate etc, to site ,all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scafforliding charges, lift charges, curing cahrges, etc, for the work including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Reinforced Brick Masonry work Ground Floor in CM (1:6) prop with Well Burnt Bricks 2nd Class traditional size (23 x 11 x 7 cm) and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509 including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges Over Head and Contingent Charges and GST for finished item of work
Ground Floor -Ornamental Plastering 8 mm thick in single coat in CM(1:3) with dubara sponge finish materials like cement, sand, water tc, to site seigniorage charges, all operational, incidental and labour charges such as mixing mortar, scaffoliding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, finishing, curing etc for finished item of work including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Ground Floor Plastering 12 mm thick in single coat in CM(1:5) with dubara sponge finish materials like cement, sand, water tc, to site seigniorage charges, all operational, incidental and labour charges such as mixing mortar, scaffoliding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, finishing, curing etc for finished item of work including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Ground Floor - Impervious coat -20 MM - Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green all materials, including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work for finished item of work
Ground Floor -Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6) 16mm thick and top coat in CM (1:4), 4mm thick with sponze finishing. with dubara sponge finish including cost and conveyance of all materials like cement, sand, water tc, to site seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, scaffoliding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, finishing, curing etc for finished item of work
Ground Floor - Wall Putty - Internal Walls - Providing and applying Synthetic Plaster putty or Plaster of Paris Putty or Lime Puninning of Average 1 to 2 mm Thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe oGF loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work for finished item of work in all floors
Ground Floor - Emulsion Paint 2 Coats Over Cement Primer -1 Coats - Interior Walls Painting to New walls with two coats of Plastic Emulsion paint over a Base Coat of Cement Primer of superior quality of approved brand and shade to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost of all materials, cost of brushes, water to site, etc., all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work in all floors for Wall
Ground Floor - Exterior Walls Emulsion Paint 2 Coats Over Cement Primer -1 Coats - Exterior Walls Painting to New walls with two coats of Plastic Emulsion paint over a Base Coat of Cement Primer of superior quality of approved brand and shade to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost of all materials, cost of brushes, water to site, etc., all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work in all floors for Wall
Ground Floor - Wood Work Painting Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Wood Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats)
Ground Floor Ellis Flooring 1st Sort -Flooring with 100 mm thick CC (1:6:10) mix using 40mm HG metal,100mm thick and 20mm cement concrete surface(Ellies pattern , first sort) per 10Sqm of area including Cost and Conveyance of all Materials and all Labour Charges Machinery etc complete but Excluding Seignorage, GST Charges etc Complete
Ground Floor - Flooring - Porcelein Vitrified Tiles- BMT-C.09 - Flooring with DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY VITRIFIED TILES OF SIZE 600 x 600 THICKNESS 8-10MM of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and Conevyance of of all materials like cement, sand water and tiles etc. and all Labour Chargte setc , complete, for finished item of work, but excluding the GST, Seignorage and Contingent and Over Herad Charges etc Complete
Ground Floor - Skirting - Porcelein Vitrified Tiles - BMT-C.09- DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY VITRIFIED TILES OF SIZE 600 x 600 THICKNESS 8-10MM of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including Cost and Conveyance of all Materials and all Labour Charghes etc Complete but Excluding seignorage, GST and Over Head and Contingent Charge etc Complete
Ground Floor - Flooring - Non Porcelein Ceramic Floor Tiles- BMT-C.03 - Flooring with Non-skid red or white full body Ceramic floor tiles of Size 600 mm x 600 mm and thickness between 8-10 mm and 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and Conveyance of all materials like cement, sand water and tiles etc., and all Labour Charges complete, but Excluding Seignorage , GST and Over Head and Contingenet Charges etc Complete
Ground Floor BMT-C.23-Dadooing with Glazed red or white full body ceramic tiles for external cladding purposes of any size and thickness between 5-7 mm 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, for finished item of work, but excluding the cost of conveyance of all materials.
UPVC Windows - MAT-05447 BMT-P.80.A Two track two panels sliding window made of (small series) frame 52 x 44 mm &sash 32 x 60 mm both having wall thickness of 1.9 ± 0.2 mm and single glazing bead of appropriate dimension. (Area of window upto 1.75 sqm) Providing and fixing factory made uPVC white colour sliding glazed windowupto 1.50 m in height dimension comprising of uPVC multichamberedframe with in-built roller track and sash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from rollforming process of required length (shape & size according to uPVCprofile), appropriate dimension of uPVC extruded glazing beads anduPVC extruded interlocks, EPDM gasket, wool pile, zinc alloy (white powder coated) touch locks with hook, zinc alloy body with single nylonrollers (weight bearing capacity to be 40 kg), G.I fasteners 100 x 8 mmsize for fixing frame to finished wall and necessary stainless steel screwsetc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, including drilling of holes for fixing hardware's and drainage ofwater etc. After fixing frame the gap between frame and adjacent finishedwall shall be filled with weather proof silicon sealent over backer rod ofrequired size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes, wire mesh and silicon sealent Note: For uPVC frame and sash extruded profiles minus 5% tolerancein dimension i.e. in depth & width of profile shall be acceptable.Variation in profile dimension in higher side shall be acceptedbut no extra payment on this account shall be made
Cost and Supply of Cement Jali 50 mm Thickness including cost and conveyance of all Materials to work site and all operational, incidental, labour charges, etc Complete but excluding Seignorage Charges and GST for finished item of work
Flush Door - 0.75 X 2.10 Mts Commercial Ply -30mm Thickness + Sal Wood Frame -Supply and fixing of Flush Door with frame made of well seasoned Sal Wood scantlings of size 100 x 75mm including cost and conveyance of all materials and labour charges etc Complete but excluding Seignorage, GST and Other Charges etc Complete as per specifications (APSS NO.1001 & 1002)
Flush Door - 0.80 X 2.10 Mts Commercial Ply -30mm Thickness + Sal Wood Frame -Supply and fixing of Flush Door with frame made of well seasoned Sal Wood scantlings of size 100 x 75mm including cost and conveyance of all materials and labour charges etc Complete but excluding Seignorage, GST and Other Charges etc Complete as per specifications (APSS NO.1001 & 1002)
Flush Door - 1.050 X 2.10 Mts Teak Wood Ply -30mm Thickness + Medium Teak Wood Frame -Supply and fixing of Flush Door with frame made of well seasoned Medium Teak Wood scantlings of size 100 x 75mm including cost and conveyance of all materials and labour charges etc Complete but excluding Seignorage, GST and Other Charges etc Complete as per specifications (APSS NO.1001 & 1002)
Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame 63.50x100 MM section .The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member.
Supply and fixing of door frame made of hollow extruded PVC section having dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm duly reinforced with seasoned wood plank at the hinges side. The door frame top 2 corners shall be metri-cut/ welded. PVC DOOR FRAME The door frame shall be fixed to the wall using 65/100mm long MS. Screws through the frame by using Pac fasteners. a minimum of 4nos. of screws to be provided for each vertical member and minimum 2nos. for horizontal member etc. complete as per manufacture specification and direction of Engineer-in-charge.
MAT-01337 Providing and fixing 30mm thick BRAND FACTORY MADE WIRE MESH SOLID PVC DOOR SHUTTER consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mmX19mm for stiles and 15mm for top, lock & bottom rails. MS. Frame shall have a coat of steel primers of approved make and manufacture. 19mmX19mm M.S. square tubes shall be covered with 5mm thick heat moulded PVC ‘C’ channel of size 30mm thickness, 90mm width out of which 75mm shall be flat and 15mm shall be flat and 15mm shall be bent in 900 on the inner side to from top and bottom rail land 130mm wide PVC sheet out of which 100mm shall be flat and 154mm shall be bent in 900 on both side to from lock rail, 10mm(5mmX2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panel will be of G.I.wire mesh of 24gauge to be fitted in by ’C’ channel of size 35mm X10mm on the either side in the stiles. The inner side ‘C’ channel is fixed by 19mmX19mm MS. Tube on both sides with screws. The wire mesh in top bottom & lock rail is sealed with15mm X 15mm tube with G.I.wire 10mm(5mmX2) thick PVC strip of 25mm width is to be stuck& nails on both side of G.I. wire mesh interior at the top, bottom & lock rail. An additional 5mm thick PVC srip of 20mm width is to be stuck on the interior side of the ‘C’ channel using PVC solvent cement adhesive etc. complete as per direction of Engineer-in-charge, manufacturer’s specification & drawings
Cost and Suppy of Name Board Including Cost and Conveyance of all Materials and all Labour Charges etc Complete
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT 65 SBD.docx
TENDER_DOCUMENT • 0.31 MB
NIT 65 SCH.xlsx
TENDER_DOCUMENT • 0.05 MB
NIT 65 Y SHEET.xlsx
TENDER_DOCUMENT • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .