Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹8.4 L
EMD Value
₹16,758
Closing Date
18 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Construction work for drains and CC roads in Ward-34, Partapur Chaudhary specifically at Talab Chowk, extending from Aamirs house to Nisars house, and from Sajids house to Rahiss house.
2026_DOLBU_1155296_1
63/CE/CD/NNB/26-27 (1 To 11) Sr No 10 Tender List 11 Date-26.05.2026
Open Tender
Civil Works
Percentage
90 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
Bareillye-tender.com
₹16,758
6 Aug 2026
29 May 2026
18 Jun 2026
29 May 2026
18 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of old damaged B.O.E. soling and Interlocking tiles stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(Non Schedule Item No.1) | - | SQM | 12 | - |
| 1.02 | Dismantling of cement concrete or brick or granolithic floors including base concrete and stacking of dismantled materials as directed by E/I within a distance of 60.M(S.no. 697) | 0.12 | CUM | 75 | ₹9 |
| 1.03 | Dismantling of old damage brick work and stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.692) | 2.14 | CUM | 660 | ₹1,412.4 |
| 1.04 | Cartage upto 5.00km for disposing of malba | 23.04 | CUM | 183.5 | ₹4,227.84 |
| 1.05 | Supply of Earth for filling or embankment in ordinary soil earth work in filling or embankment to be in 20 cm layers, including ,watering ,Dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance as directed by the Engineer-in-charge. (Excluding Royalty) Analysis rate | - | CUM | 359.27 | - |
| 1.06 | Providing and layingConcrete with 4cm gauge brick ballast, fine sand of 1.25 fineness modulous and cement in prportion of 1:6:12 in foundation in under floor , including supply of all material labour and T&P etc rfequired of proper completetion of the work . | - | CUM | 3,705 | - |
| 1.07 | First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work. | 1 | CUM | 5,500 | ₹5,494.5 |
| 1.08 | 12 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimum thickness not less then 10 mm including all supply of meterial , Labour T&P etc required for proper completetion of the work. | 1 | SQM | 217 | ₹216.78 |
| 1.09 | Providing laying C.C with 2cm gauge approved stone ballast, approved coarse sand and cement in praportion of 1:2:4 including supply of all materials, labour and T&P etc required for proper completetion of the work. | 3.02 | CUM | 7,833 | ₹23,655.66 |
| 1.1 | RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in Slabs excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. | 1.54 | CUM | 8,451 | ₹13,014.54 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.00 MB
BOQ_2164186.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .