Loading…
Loading…
Tender ID
Tender Value
₹1.7 L
EMD Value
₹3,500
Closing Date
15 Apr 2026, 10:30 amClosed
Executive Engineer MID Anantnag hq Awantipora
MID Awantipora
Servicing/impregnation of flood affected prime movers and pumps at various LIS of MISD Padgampora..
2026_IFC_307533_2
ENit 01 of 2026-27
Open Tender
Repair and Maintenance Works
Percentage
10 days
Pulwama, anantnang, shopian, kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
executive eingineer MID Anantnag
₹3,500
8 Apr 2026
8 Apr 2026
15 Apr 2026
8 Apr 2026
15 Apr 2026
8 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting / Dismantling of submerged 200 HP Horizontal motor coupled with 20 cusec pumping equipment from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers , removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applying of highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish ( 2 coats ) .After impregnation applying of heat up to suitable temperature for drying of coils /stator. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assembly completely before re installations of motor assembly. (At LIS Kakapora Draught and At LIS Tokina Draught ) | - | job | - | - |
| 2 | Dismantling of pump assembly from base frame and Checking of pump by way of removal of moisturized transmission oil, cleaning of bearings / housing and impeller. Providing / filling of fresh transmission oil of suitable grade approx. 4 ltrs up to required levels . The job further includes complete assembling of pump and motor. No load test at site of work is also involved in the job .The executing agency has to provide all types of tools and plants required for execution of the above jobs. . (At LIS Kakapora Draught and At LIS Tokina Draught ) | - | job | - | - |
| 3 | Disconnecting / Dismantling of submerged 75 HP and 60 HP Horizontal motors coupled with 15 cusec and 10 cusec pumping equipments from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assemblies by using skilled workers , removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applyingof highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish (2 coats) .After impregnation applying of heat up to suitable temperature for drying of coils /stators. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assemblies completely before re installations of motor assemblies. (At LIS Dogripora Draught New) | - | job | - | - |
| 4 | Dismantling of pump assemblies from base frames and Checking of pumps by way of removal of moisturized transmission oil,cleaning of bearings / housing and impeller. Providing / filling of fresh machine oil of suitable grade approx. 4 ltrs up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job .The executing agency has to provide all types of tools and plants required for execution of the above jobs. .(At LIS Dogripora Draught New) | - | job | - | - |
| 5 | Disconnecting / Dismantling of submerged 60 HP and 40 HP Horizontal motors coupled with 10 cusec and 5 cusec pumping equipments from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assemblies by using skilled workers , removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applying of highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish (2 coats) .After impregnation applying of heat up to suitable temperature for drying of coils /stators. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assemblies completely before re installations of motor assemblies. (At LIS Dogripora Draught Old) | - | job | - | - |
| 6 | Dismantling of pump assemblies from base frames and Checking of pumps by way of removal of moisturized transmission oil, cleaning of bearings / housing and impeller. Providing / filling of fresh machine oil of suitable grade approx. 4 ltrs up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job. The executing agency has to provide all types of tools and plants required for execution of the above jobs. (At LIS Dogripora Draught Old) | - | job | - | - |
| 7 | Disconnecting / Dismantling of submerged 75 HP and 5 HP Horizontal motors coupled with 10 cusec and priming pumping equipments from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assemblies by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applying of highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish (2 coats) .After impregnation applying of heat up to suitable temperature for drying of coils /stators. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assemblies completely before re installations of motor assemblies. (At LIS Watchi Draught & LIS Kraltang Watchi)) | - | job | - | - |
| 8 | Dismantling of pump assemblies from base frames and Checking of pumps by way of removal of moisturized transmission oil, cleaning of bearings / housing and impeller. Providing / filling of fresh machine oil of suitable grade approx. 4 ltrs up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job .The executing agency has to provide all types of tools and plants required for execution of the above jobs. (At LIS Watchi Draught & LIS Kraltang Watchi) | - | job | - | - |
| 9 | Disconnecting / Dismantling of submerged 60 HP Horizontal motor coupled with 10 cusec pumpingequipment from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applying of highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish (2 coats) .After impregnation applying of heat up to suitable temperature for drying of coils /stators. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assemblies completely before re installations of motor assemblies. ( At LIS Patikawni) | - | job | - | - |
| 10 | Dismantling of pump assembly from base frames and Checking of pump by way of removal of moisturized transmission oil, cleaning of bearings / housing and impeller. Providing / filling of fresh machine oil of suitable grade approx. 4 ltrs up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job .The executing agency has to provide all types of tools and plants required for execution of the above jobs. ( At LIS Patikawni) | - | job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_997619.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .