Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -3.50% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.0 L+₹6,899.95 (3.58%)Admitted-Fee/PreQual/Technical/Finance | -0.05% | ₹2.0 L+₹6,899.95 (3.58%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.0 L+₹6,959.95 (3.61%)Admitted-Fee/PreQual/Technical/Finance | -0.02% | ₹2.0 L+₹6,959.95 (3.61%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
24 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Fencing of Teli Mohalla Graveyard at Batpora Guzhama Block Wakura PRI(416)
2026_RDPR_316478_10
E NIT No. 34/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
30 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW GANDERBAL
₹4,000
30 Jul 2026
17 Jul 2026
25 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labour for site clearance | 5 | no | 553 | ₹2,765 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth lead of 50 m as directed. All kinds of soil. | 7.65 | cum | 479.3 | ₹3,666.65 |
| 3 | Providing and laying of dry stone solling hand packed including spreading , levelling and all carriages. | 0.96 | cum | 1,000 | ₹960 |
| 4 | Providing and laying in position cement concrete of specified grade with 20 % plum including curing but excluding the cost of centring and shuttering . All work upto plinth level with:1:3:6(1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size)
80 % Concrete | 9.27 | cum | 5,733.6 | ₹53,150.47 |
| 4.1 | 20 % Plum including all carriage | 2.29 | cum | 1,000 | ₹2,290 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 50.19 | Sqm | 268.35 | ₹13,468.49 |
| 6 | Brickwork with FPS bricks of class designation of 75cm in super structure up to all floors in cement mortar 1:6 mix | 2.44 | cum | 7,571.55 | ₹18,474.58 |
| 7 | 12mm thick cement plaster of mix 1:6 (1 cement: 6 coarse sand) | 46 | Sqm | 266 | ₹12,236 |
| 8 | Structural steel work in single section, fixed with or without connecting
plate, including cutting, hoisting, fixing in position and applying a primingcoat of approved steel primer all complete. | 708.75 | kg | 120 | ₹85,050 |
| 9 | Carriage of materials for an average lead of 15 kms for sand and bajri | 13.95 | cum | 340.61 | ₹4,751.51 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_1031831.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .