Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 337 YASH ARIAN NR SWAMI VIVEKANAND CIRCLE MEMNAGAR AHMEDABAD GUJARAT 380052 | AHMADABAD | GUJARAT | 380052 | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
Tender Value
₹85,814
EMD Value
₹2.5 L
Closing Date
15 May 2026, 2:00 pmClosed
Exe Eng NH Div. Rajkot
Exe Eng NH Div. Dr. Rajendra Prasad Road, Rajkot
Annual rate for JMS, Demarcation process and Valuation of Affected Structures, including Joint Measurement with revenue Staff and Land owners, Submission to Competent Authority as per direction of EE, NHD, Rajkot in the State of Gujarat.
2026_MoRTH_907065_1
Store 01/2026-27
Open Tender
Civil Works - Highways
Works
365 days
Rajkot
As per Tender Documents
2 documents required · 2 mandatory
₹1,200
Bharatkosh Portal
₹2.5 L
26 May 2026
30 Apr 2026
16 May 2026
30 Apr 2026
15 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demarcation of PROW stone points Demarcation of Proposed ROW point with the use a Total Station / DGPS, with respect to superimpose of survey data on approved JMS data and approved alignment, which is given by DPR consultant. Taking GPS control station/ Reference Points, which was established on ground by DPR consultant. Getting coordinate @ 50 meter interval both side and demarcate on field with wooden peg/steel Rod ( 20 point left side and 20 point right side total 40 point per 1 Km). & establishment of reference point at each 3 km intervals. | - | Km. | 14,000 | - |
| 1.02 | Fixing the PROW stone with labour and materials. Excavation for foundation up to 0.50 x 0.50 x 0.50 Mtdepth for fixing the PROW stone. Providing and laying cement concrete 1:3:6(1-Cement: 3-Coarse sand: 6 crushed stone aggregates) and curing complete. Labour for fixing, finishing, Painting & text marking on the stone. Transportation of stone at every 50 Mt. intervals After fixing the PROW stone our team check each and every stone with respect to proposed alignment and
approved JMS data. | - | Km. | 20,000 | - |
| 1.03 | Supplying & Providing the PROW stone as per MoRTH specification (20 stone left side and 20 stone right side total 40 stone in 1Km.) | - | Km. | 24,000 | - |
| 1.04 | Carryout Joint Measurement Survey with DGPS/Total Station and Appropriate Survey and Measurements Instruments with Revenue staff & Land Owners/Sub-Holders, DILR Surveyer including all field sruveys & Activities, Finalization of Drawings, Providing Colour Printouts in 07 (Seven) Copies as directed by Engineer In-charge and field staff and providing full sercice upto final awards of Land Acquisition including all exersise of Re-survey and other activities directed by DILR, Revenue Staff and Engineer In-charge. Including preparation of Para-104, Hissa Forms, Kami-Jasti Patrak (KJP) etc., complete. (Including all taxes, SGST+CGST) | - | Each Survey No. | 3,805 | - |
| 1.05 | Valuation of Affected Structures & Trees. Carrying out Valuation of Affected Structrues, Trees, Well, Kuchha-Pucca-Semi Pucca, Pipelines, Bore-well, Fancing, Poll, Trees and Non-fruite trees etc., on PROW,EROW, for Project Highway as per Prevailing guidelines & directed by engineer in-charge and in consultance with Land Owners, Sub Plot oweners, State R&B (PWD) Division and Sub division staff etc complete including submissio of Structure Evaluation report with all drawings and other documents in soft and hard copies of 05(Five colour copies of sets of files).(Including All taxes, CGST&SGST).
1 Kuchha Structure
A: Built-Up area upto 15 Sqmt. | - | Each Survey No. | 1,062 | - |
| 1.06 | 1 Kuchha Structure
B: Built-Up area between 15 to 30 Sqmt. | - | Each Survey No. | 1,180 | - |
| 1.07 | 1 Kuchha Structure
C: Built-Up area more than30 Sqmt. | - | Each Survey No. | 1,239 | - |
| 1.08 | 2 Semi Pucca Structure
A: Built-Up area upto 15 Sqmt. | - | Each Survey No. | 1,829 | - |
| 1.09 | 2 Semi Pucca Structure
B: Built-Up area between 15 to 30 Sqmt. | - | Each Survey No. | 1,947 | - |
| 1.1 | 2 Semi Pucca Structure
C: Built - Up Area morethan 30 Sqm to 70 Sqm | - | Each Survey No. | 2,250 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
JMSSBD.pdf
Tender Documents • 1.00 MB
BOQ_953399.xls
BOQ • 0.33 MB
General_Condition.pdf
Additional Documents • 0.11 MB
Detailed_Specification.pdf
Additional Documents • 0.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .