| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹4.0 L+₹3,080 (0.78%)Rejected-Finance ASANSOL | ASANSOL | WEST BENGAL | ₹4.0 L+₹3,080 (0.78%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.0 L+₹3,960 (1.00%)Rejected-Finance | ₹4.0 L+₹3,960 (1.00%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.0 L
EMD Value
₹7,999
Closing Date
21 Jul 2026, 3:00 pmClosed
Assistant Engineer
Golaghata KNI Avenue Kolkata 700048
Improvement of drainage system in both side flank from 1.00 Kmp to 2.50 Kmp. of Dum Dum - Lauhati Road under Baguihati Highway Sub-Division under Barasat Highway Division - I, in the District of North 24 Parganas.
2026_WBPWD_5016491_2
WBPWRD/AE/BHS-D/eNIT03/2026-27
Open Tender
CIVIL WORKS
Percentage
Dum Dum Lauhati Road
Please refer Tender documents.
5 documents required · 5 mandatory
₹7,999
19 Aug 2026
9 Jul 2026
23 Jul 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the road side in conformity with municipal /corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin- Charge.
(Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside) | 0.6 | Cu.M. | 289 | ₹173.4 |
| 2 | Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame. As per I.S-12592(M.D)
(viii) 5 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size
Cover : 470 mm X 420 mm X 80 mm
Frame : 590 mm X 550 mm X 170 mm
Opening : 380mm x 305mm
Weight : 100 kg (approx) | 6 | Each | 2,001 | ₹12,006 |
| 3 | Supplying & laying Double Wall Corrugated (with external annular corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part-II):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for non pressure underground Drainage, Sewerage & Cr (Ii)250 mm internal dia. | 48 | Mtr. | 1,011 | ₹48,528 |
| 4 | Constructing Inspection pit of inside measurement 600mm X 600mm X upto 600mm (depth) with 250 mm thick 1st. class brick work in cement mortar (1:4) on all sides, bottom of the pit consisting of 100 mm thick cement concrete (1:3:6) with stone chips over a layer of jhama brick flat soling, 15 mm thick (1:4) cement plaster to inside walls and out-side walls upto G.L. and 20 mm.thick (1:4) plaster to bottom of the pit, providing necessary invert with cement concrete (1:3:6) with stone chips as per direction, neat cement finishing to entire internal surfaces, top of the pit covered with 100 mm thick R.C.C. slab (1:1.5:3) with stone chips and necessary reinforcements upto 1% and shuttering including 6 mm thick cement plaster (1:4) in all external surfaces of the slab and one 560 mm dia. R.C.C. manhole cover of approved make supplied, fitted and fixed in the slab with necessary fittings, necessary earthwork in excavation in all sorts of soil, filling sides of the pit with earth and removing spoils after work complete in all respect with all costs of labour and materials. i) With Pakur variety. (SAIL/TATA/RINL) | 6 | Each | 7,303 | ₹43,818 |
| 5 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 345.51 | Cu.M. | 166 | ₹57,354.66 |
| 6.1 | GST @ 18% over Sl. No. 1 to 5 | - | % | 18 | - |
| 6.2 | Labour Welfare Cess @ 1% over Sl. No. 1 to 6.10 | - | % | 1 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_5086056.xls
BOQ • 0.27 MB
WBF.pdf
Tender Documents • 1.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .