| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.4 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically qualified it is rejected being L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically qualified it is rejected being L3 | |
| 4 | Rejected-Technical KERALA KL | IDUKKI | KERALA | 685533 | - | Rejected-Technical Technically qualified it is cancelled being L4 |
| Sl No | Description | Qty | Unit | M PRADEEPKUMAR L1 | ANUKUMAR L2 | SHANAVAS ALIKUNJU L3 | Sudhakaran.B L4 |
|---|---|---|---|---|---|---|---|
| 1.00GF | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 247.5 | cum | 300 ₹74,250 Lowest | 330 ₹81,675 | 300 ₹74,250 Lowest | 352 ₹87,120 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 180 | cum | 266 ₹47,880 Lowest | 320 ₹57,600 | 300 ₹54,000 | 312 ₹56,160 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 31.42 | cum | 6,614 ₹2,07,811.88 | 750 ₹23,565 Lowest | 7,300 ₹2,29,366 | 7,865 ₹2,47,118.3 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 190.9 | sqm | 322 ₹61,469.8 Lowest | 340 ₹64,906 | 340 ₹64,906 | 382 ₹72,923.8 |
| 1.00 | OD95015/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. All work upto plinth level | 68.89 | cum | 9,079 ₹6,25,415.99 Lowest | 10,000 ₹6,88,860 | 10,500 ₹7,23,303 | 10,741 ₹7,39,904.53 |
| 1.01 | OD98376/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. .All work above plinth level upto floor V level | 68.44 | cum | 10,775 ₹7,37,484.1 Lowest | 11,000 ₹7,52,884 | 12,500 ₹8,55,550 | 12,748 ₹8,72,524.11 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 267 | sqm | 801 ₹2,13,867 Lowest | 860 ₹2,29,620 | 930 ₹2,48,310 | 947 ₹2,52,849 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 60.96 | sqm | 852 ₹51,937.92 Lowest | 860 ₹52,425.6 | 950 ₹57,912 | 1,012 ₹61,691.52 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 153.6 | metre | 190 ₹29,184 Lowest | 190 ₹29,184 Lowest | 200 ₹30,720 | 224 ₹34,406.4 |
Tender Value
₹81.4 L
EMD Value
₹50,000
Closing Date
7 Feb 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD Buildings Division Thiruvananthapuram
General-Construction of new School Building at Govt LPS Pangode-Construction of new School Building at Govt LPS Pangode Civil work
2026_PWD_832150_1
TR/13299/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
365 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
8 Apr 2026
30 Jan 2026
11 Feb 2026
30 Jan 2026
7 Feb 2026
30 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1GF | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 247.5 | cum | - | - |
| 1.002 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 180 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 31.42 | cum | - | - |
| 1.004 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 190.9 | sqm | - | - |
| 1.005 | OD95015/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. All work upto plinth level | 68.89 | cum | - | - |
| 1.006 | OD98376/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. .All work above plinth level upto floor V level | 68.44 | cum | - | - |
| 1.007 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 267 | sqm | - | - |
| 1.008 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 60.96 | sqm | - | - |
| 1.009 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 153.6 | metre | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1398665.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1398665.xls
BOQ • 0.35 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
viewsbd.pdf
Tender Documents • 2.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .