| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.0 LAccepted-Finance | ₹40.0 L | L1 | Accepted-Finance Lowest Quoted Amount |
| 2 | L2₹40.2 LRejected-Finance | ₹40.2 L | L2 | Rejected-Finance High Quoted amount |
| 3 | L3₹40.4 LRejected-Finance | ₹40.4 L | L3 | Rejected-Finance Highest quoted amount |
| Sl No | Description | Qty | Unit | BINUDHAR BASUMATARY L1 | Fwilao Basumatary L2 | Pradeep Basumatary L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (Not exceeding 1.5 m in with or 10 sqm)…….. | 89.1 | cum | 286.85 ₹25,558.34 | 286.85 ₹25,558.34 | 286.85 ₹25,558.34 |
| 2.00 | Excavating, supplying and filling of local earth (Including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 122.54 | cum | 368.65 ₹45,172.90 | 368.65 ₹45,172.90 | 368.65 ₹45,172.90 |
| 3.00 | Steel work Steel reinforcement for R.C.C. work including straightening cutting, bending, placing in position and binding all complete above plinth level. | 1,855.25 | Kg | 115.65 ₹2.1 L | 120.65 ₹2.2 L | 125.65 ₹2.3 L |
| 4.00 | Steel work Steel reinforcement for R.C.C. work including straightening cutting, bending, placing in position and binding all complete above plinth level. | 2,547.72 | Kg | 115.65 ₹2.9 L | 120.65 ₹3.1 L | 125.65 ₹3.2 L |
| 5.00 | Structure steel work riveted, bolted or welded in built up sections, trusses and gramed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 844.27 | Kg | 78.2 ₹66,021.91 | 78.2 ₹66,021.91 | 78.2 ₹66,021.91 |
| 6.00 | Cement concrete work : Providing and laying in position cement concrete of specifeid grade excluding the cost of centering and shuttering- All work upto plinth level. | 7.16 | cum | 7,365.15 ₹52,763.93 | 7,365.15 ₹52,763.93 | 7,365.15 ₹52,763.93 |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level. | 25.21 | cum | 8,364.2 ₹2.1 L | 8,364.2 ₹2.1 L | 8,364.2 ₹2.1 L |
| 8.00 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc…. | 6.36 | cum | 10,185.05 ₹64,766.73 | 10,185.05 ₹64,766.73 | 10,185.05 ₹64,766.73 |
| 9.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15* landing, balconies, shelves chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement..... | 9.37 | cum | 10,719.3 ₹1.0 L | 10,719.3 ₹1.0 L | 10,719.3 ₹1.0 L |
| 10.00 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 ……….. | 26.07 | Sqm | 370.85 ₹9,669.54 | 370.85 ₹9,669.54 | 370.85 ₹9,669.54 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
16 Mar 2026, 2:00 pmClosed
BDO Kokrajhar
O/o the Block Development Officer Kokrajhar Development Block Titaguri
Construction of Ultapani VCDC office Building at Brahmapara
2026_BoTC_51441_1
6th ASFC -03 of 2025-26
Open Tender
Civil Works
Brahmapara Ultapani
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,200
₹80,000
Yes
11 May 2026
23 Feb 2026
16 Mar 2026
23 Feb 2026
16 Mar 2026
23 Feb 2026
23 Feb 2026 - 16 Mar 2026
Earth Work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (Not exceeding 1.5 m in with or 10 sqm)……..
Excavating, supplying and filling of local earth (Including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Steel work Steel reinforcement for R.C.C. work including straightening cutting, bending, placing in position and binding all complete above plinth level.
Steel work Steel reinforcement for R.C.C. work including straightening cutting, bending, placing in position and binding all complete above plinth level.
Structure steel work riveted, bolted or welded in built up sections, trusses and gramed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Cement concrete work : Providing and laying in position cement concrete of specifeid grade excluding the cost of centering and shuttering- All work upto plinth level.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level.
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc….
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15* landing, balconies, shelves chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement.....
Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 ………..
Shuttering & Form work: Centering and shuttering including strutting, proping etc. and removal of form for. (Foundations, footings, bases of columns etc for mass concrete.
Lintels, beams, plinth beams, girders bressumers and cantilevers.
Column, pillars piers, abutments posts and struts
Suspended floors, roofs, landings balconies and access platform
Pre const anti termite treatment : Diluting and injecting chemical emulsion for post const. anti-termite treatment …..
Brick work: Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in cement mortar 1:4
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level upto floor V level.
Providing wood work in frames of doors, windows clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasterners of required dia & length…
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory window, fixing with butt hings of required size with necessary screws excluding panelling which will be paid for separetly, all complete as per direction of Engineer-in-charge...
Flooring :- 62 mm thick cement concrete flooring with concrete hardener topping, under layer 50 mm thick cement concrete 1:2:4 ……………
False ceiling : - Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/sqm…….
Plastering works :- 15mm cement plaster on the rough side of single or half brick wall of mix. (1:4)
20 mm cement plaster of mix : 1:4
Roofing :- Providing and fixing precoated galvanised iron profile sheets ………….
Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05%) total coated thickness, Zinc coating…
Plinth Protection :- Making plinth protection 50 mm thick cement concrete 1:3:6 over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation leveling and dressing and finishing the top smooth.
Painting :- With ready mixed pink or Grey primer of approved brand and manufacture on wook work (hard and soft wood)
Painting wood work with deluxe Multi surface paint of required shade. Two or more coat applied @0.90 ltr/10 sqmr over and under coat of primer applied @0.75 Ltr/10 sqm of approved brand and manufacture.
Providing and applying plaster of paris putty of 2 mm thickness overplastered surface to prepare the surface even and smooth complete.
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface water thinkable cement primer.
Finishing wall with 100 % premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004.
Door window fittings : - Providing and fixing aluminium sliding door bolts, ISI marked anodised….
Providing and fixing aluminium tower bolts, ISI marked anodised….
Providing and fixing aluminium handles, ISI marked anodised….
Providing and fixing ISI marked aluminium butt hinges anodised….
Cost of Electrification (12.5 % cost of civil work)….
Cost of Sanitary Installation & Water supply (4% cost of civil work)………….
Const of Septic Tank :- Earth Work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (Not exceeding 1.5 m in with or 10 sqm)……..
Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level.
Steel work Steel reinforcement for R.C.C. work including straightening cutting, bending, placing in position and binding all complete above plinth level.
Centering and shuttering including strutting, propping etc. and removal of form for (Foundation, footings, bases of columns etc for mass concrete.
Suspended floors, roofs, landings balconies and access platform
Vertical and horizontal fins individually or forming box louvers band, facias and eaves boards
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level. (1:1.5:3) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources.
15 mm cement plaster on the rough side of single or half brick wall of mix.
cement plaster skirting upto 30 cm height, with cement mortar 1:3 ( 18 mm thick)
Furniture & furnishing accessories
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
Tendercodument.pdf
Tender Documents • 5.65 MB
BOQ_81690.xls
BOQ • 0.25 MB
FormofBid.pdf
Additional Documents • 0.25 MB
Shortnoticeinviting.pdf
Additional Documents • 1.91 MB
Download all tender documents and submit your bid