Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹8.0 L+₹28,326.03 (3.66%)Rejected-AOC KERALA | PATHANAMTHITTA | KERALA | 685533 | L2 | Rejected-AOC First Lowest accepted Work Order hence rejected | |
| 3 | L3₹8.1 L+₹33,260.03 (4.30%)Rejected-Finance | L3 | Rejected-Finance Third Lowest | |
| 4 | L4₹8.9 L+₹1.2 L (14.9%)Rejected-Finance | L4 | Rejected-Finance Forth Lowest | |
| 5 | L5₹9.2 L+₹1.4 L (18.3%)Rejected-Finance MAMBURAM COLONY ROAD CONCRETE PROJ NO 54 | L5 | Rejected-Finance Fifth Lowest |
Tender Value
Refer Docs
EMD Value
₹21,600
Closing Date
8 Jan 2021, 5:00 pmClosed
Assistant Executive Engineer TCSD Pathanamthitta
Assistant Executive Engineer Transmission Construction Sub Division KSEB Limited 110KV Substation Compound Azhoor PIN 689645
Upgradation of 66kV Substation Adoor to 110kV Site levelling and Construction of retaining wall for 2 nos of 110 kV feeder bays for Adoor Enathu DC feeders
2020_KSEB_401150_1
AEE/TCSDP/20-21/13/18-12-2020
Open Tender
Civil Works - Others
Percentage
45 days
66kV Substation Kottamugal Adoor
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,142
₹21,600
22 Jan 2021
22 Dec 2020
13 Jan 2021
22 Dec 2020
8 Jan 2021
23 Dec 2020
23 Dec 2020 - 8 Jan 2021
Amount
Quoted Amount of BOQ1 in figures
GST Rate in percentage
VAEGHESE P M
SURESH AP
SUNNY JOHN
Abdul Jaleel
VIJAYAN PILLAI P
VAEGHESE P M
SURESH AP
SUNNY JOHN
Abdul Jaleel
VIJAYAN PILLAI P
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .