Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC H 10 KARNI NAGAR NEW NAGAUR ROAD NEAR MANDORE POLICE STATION 8TH MILL MANDORE JODHPUR 342304 | JODHPUR | JODHPUR | RAJASTHAN | 342304 | L1 | Accepted-AOC LOWEST REASONABLE BID | |
| 2 | L2₹23.1 L+₹1.7 L (7.79%)Rejected-Finance 10 SUBASH COLONY DEF LAB ROAD RATANADA JODHPUR 342006 RAJ | JODHPUR | JODHPUR | RAJASTHAN | 342006 | L2 | Rejected-Finance NOT LOWEST | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Eligible bidder as not enlisted in eligible cat. i.e. c iii therefore not satisfies the eligibility criteria as per NIT. |
| Sl No | Description | Qty | Unit | Shri Electrical Enterprises L1 | PANWAR ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | M&L for allinging of lifting arrangment, Beam type, 5 Ton capacity,collecting the lifting arrengement from storage shed, transport to civil workshop, dismantling the lifting arrengement, allinging the beam by hydroulic press, rewelding the web with necessary reinforcment, refixing the chain with replacing weak link, replacing 4 nos hook locking arrengments, testing with full load for deflection, balancing test, painting with fire retartant paint complete all as specified and directed by Engr-in-charges. | 4 | Each Job | 6,300 ₹25,200 Lowest | 7,550 ₹30,200 |
| 2.00 | M&L for periodic inspection/ servicing of travel trolley of capacity 10 Ton. complete all as specified and directed by Engr-in-charges. | 4 | Each Job | 4,000 ₹16,000 Lowest | 4,900 ₹19,600 |
| 2.01 | (a) motor,gearbox with break assembly | - | - | - | - |
| 2.02 | (i) Inspecting the alignment of motor ,gear box assembly | - | - | - | - |
| 2.03 | (ii) Topping up gear oil in gear box, inspecting leakage, replacing oil seal if required, oil shall be measured and paid separately | - | - | - | - |
| 2.04 | (iii) Adjecting break, inspecting electric connection etc. | - | - | - | - |
| 2.05 | (iv) Inspecting of alignment of bull gear and pinion | - | - | - | - |
| 2.06 | (v) greasing all moving parts. | - | - | - | - |
| 2.07 | (b) limit Switch & control wiring | - | - | - | - |
| 2.08 | (i) Adjesting limit switch contacts. | - | - | - | - |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
27 May 2026, 6:00 pmClosed
CWE ARMY JODHPUR
CWE ARMY MULTAN LINE ARMY AREA JODHPUR-342010
REPAIR / MAINTENANCE EOT CRANES, TRAVERSE IN ESH SHEDS AND OTHER STORAGE SHEDS CONNECTED ITEMS AT ARMY AREA BANAR UNDER GE BANAR
2026_MES_763512_1
CWE (A) JODH/BNR- OF 2026-27(82627/12/E8)
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
BANAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE BANAR
₹40,000
Yes
4 Aug 2026
5 May 2026
29 May 2026
5 May 2026
27 May 2026
20 May 2026
5 May 2026 - 19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for allinging of lifting arrangment, Beam type, 5 Ton capacity,collecting the lifting arrengement from storage shed, transport to civil workshop, dismantling the lifting arrengement, allinging the beam by hydroulic press, rewelding the web with necessary reinforcment, refixing the chain with replacing weak link, replacing 4 nos hook locking arrengments, testing with full load for deflection, balancing test, painting with fire retartant paint complete all as specified and directed by Engr-in-charges. | 4 | Each Job | 31,00,000 | ₹1,24,00,000 |
| - | M&L for periodic inspection/ servicing of travel trolley of capacity 10 Ton. complete all as specified and directed by Engr-in-charges. | 4 | Each Job | 31,00,000 | ₹1,24,00,000 |
| 2.01 | (a) motor,gearbox with break assembly | - | - | 31,00,000 | - |
| 2.02 | (i) Inspecting the alignment of motor ,gear box assembly | - | - | 31,00,000 | - |
| 2.03 | (ii) Topping up gear oil in gear box, inspecting leakage, replacing oil seal if required, oil shall be measured and paid separately | - | - | 31,00,000 | - |
| 2.04 | (iii) Adjecting break, inspecting electric connection etc. | - | - | 31,00,000 | - |
| 2.05 | (iv) Inspecting of alignment of bull gear and pinion | - | - | 31,00,000 | - |
| 2.06 | (v) greasing all moving parts. | - | - | 31,00,000 | - |
| 2.07 | (b) limit Switch & control wiring | - | - | 31,00,000 | - |
| 2.08 | (i) Adjesting limit switch contacts. | - | - | 31,00,000 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_855214.xls
BOQ • 0.35 MB
TENDER12.pdf
Tender Documents • 1.41 MB
corrigendumno02-82627-12-E8.pdf
PDF • 0.10 MB
corrigendumno01-82627-12-E8.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .