Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹89.5 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.2 Cr+₹26.2 L (29.3%)Rejected-Finance 825 GANDHI CHOWK RANIKHET 263645 DISTRICT ALMORA | RANIKHET | ALMORA | UTTARAKHAND | 263645 | 2 | Rejected-Finance L2 |
Tender Value
₹90 L
EMD Value
₹1.8 L
Closing Date
11 Dec 2020, 5:00 pmClosed
EE UKPJN Pithoragarh
Office of EE UKPJN Pithoragarh
MES Devkatiya Water Supply Scheme
2020_MDPEY_27618_1
Letter No. 3209 / Nivida / 238 Dated 10.11.2020
Open Tender
Civil Works - Water Works
Item Rate
365 days
Pithoragarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Office of EE UKPJN Pithoragarh
₹1.8 L
Yes
Office of EE UKPJN Pithoragarh
10 May 2023
21 Nov 2020
15 Dec 2020
21 Nov 2020
11 Dec 2020
23 Nov 2020
23 Nov 2020
Amount
Intake Works
Provide all materials, labour, T&P and construct 5 m span RCC weir across the the gadhera as per type design.
Providing and fixing of french well as per type design & Drawing.
Protection works around Intake works.(Random Rubble masonary with hard stones including levelling up with cement concrete 1:6:12 in 20mm stone aggregate)
Treatment Works
Contruction of 0.25 MLD water Treatement plant based on Hydrocyclone filtration technology along with carbon media, sand filter dosing pump etc including all other electrical and mechanical appurtenance works, T&P etc.
Construction of Raw water tank of capacity 50KL(2hr retention period) as per type,design and drawing.
Construction of Tube settler of capacity 50KL(2hr retention period) as per type,design and drawing.
Protection works around Intake works.(Random Rubble masonary with hard stones including levelling up with cement concrete 1:6:12 in 20mm stone aggregate)
Pump House
Excavation of earth work in ordinary rock by mechanical/manual means in foundation trenches (including lift upto 1 m & lead upto 30m) filling watering, ramming of excavated earth into the trenches or into the space between the building & the side of foundation trenches.
Providing and laying in position cement concrete of specified grade in 1:4:8 in 40mm stone aggregate excluding cost of centering and shuttering
centering and shuttering including strutting, propping etc and removal of form works
Providing and laying damp-proof course 50 mm thick with cement concrete 1:2:4(Zone III sand) in stone aggregate 20 mm
Providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer's specification per 50kg cement
Brick work with common burnt F.P.S(non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in: cement mortar 1:6
Supply and filling in plinth with sand under floor, including watering, ramming, consolidating and dressing complete
Providing and laying in position cement concrete of specified grade in 1:4:8 in 40mm stone aggregate excluding the cost of centering and shuttering. ( Thickness 8 cm)
Providing and laying in position cement concrete of specified grade in 1:2:4 in 40mm stone aggregate excluding cost of centering and shuttering( Thickness 2.5 cm)
Reinforced cement concrete work in beams, suspended floors, lintels,windows sills, chajjas etc excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 in 20 mm stone aggregate excluding cost of centering and shuttering
Centering and shuttering including strutting, propping etc and removal of form works in RCC retaining wall.
Reinforced cement concrete work in beams, suspended floors, lintels,windows sills, chajjas etc excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 in 20 mm stone aggregate excluding cost of centering and shuttering
RCC works in retaining wall
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars.
Plastering with in proportion of 1:4 cemnt, sand with minimum thickness 2cm including supply of all steel, labour, T&P, etc complete for the proper completion of the work.
Plastering with in proportion of 1:4 cemnt, sand with minimum thickness 2cm including supply of all steel, labour, T&P, etc complete for the proper completion of the work.
Providing and fixing 1mm thick M.S sheet door, windows with frame of 40X40X6 mm angle iron and 3 mm M.S gusset platesat the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer, Using M.S. angles 40x40x6 mm for diagonal braces
Steel Beading (10X10X1.6 mm) box type
Flats upto 10 mm thick
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade(two or more coats) and including water thinnable priming coat with cement primer
Finishing walls with water proofing cement paint(snowsem) of required shade(two or more coats applied @ 3.84kg/10sqm)
Rising Mains
Excavation of pipe line trench in following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m from trenches including supply of labour, T&P etc complete. Assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajri & boulders and 15% will be in ordinary rock. Soil mixed with Boulder
Excavation of pipe line trench in following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m from trenches including supply of labour, T&P etc complete. Assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajri & boulders and 15% will be in ordinary rock. Ordinary Rock
Providing, laying, welding of following sizes pain ended MS.ERW Pipes including jointing all fittings, specials required for proper completion of work as per departmental type design & drawing.Confirming IS:1239/1978 grade210 100mm dia X 4.4 mm Thk
Supply and fixing of the following valves with required fittings including all materials, labours, T&P etc complete. C.I. D/F Sluice Valves Confirming to IS: 14846-2000 ( Kirloskar or equivalent) 100 MM
Construct 60x60x75 cm brick masonry sluice valve chamber manhole cover with locking arrangement complete.
Providing and fixing brass Air valves as per IS: 779/1997 specification. 50 MM
Providing M20 plain concrete for Anchor / thrust block of 1.2x.5x.8 mtr size in high pressured zone of rising main as per type design complete.
Protection works in rising Mains .(Random Rubble masonary with hard stones including levelling up with cement concrete 1:6:12 in 20mm stone aggregate)
Clear Water Reservoir
Supply of all materials, labour T&P etc and construct semisunk circular RCC, CWR with foundation including fixing of inlet, outlet, washout & overflow G.I. pipes / specials of suitable dia as per type design & drawing complete. 250 KL
Protection works around CWR .(Random Rubble masonary with hard stones including levelling up with cement concrete 1:6:12 in 20mm stone aggregate)
Gravity Mains
Providing, laying & jointing of following sizes of Pipes including all fittings, specials required for proper completion of work as per departmental type design & drawing G.I. pipes as per IS: 1239/ 1985 Part-I.
Excavation of pipe line trench in following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m from trenches including supply of labour, T&P etc complete. Assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajri & boulders and 15% will be in ordinary rock. Soil mixed with Boulder
Excavation of pipe line trench in following strata lift upto 1.5m lead upto 30m. Including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m from trenches including supply of labour, T&P etc complete. Assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajri & boulders and 15% will be in ordinary rock. Ordinary Rock
Supply and fixing of the following valves with required fittings including all materials, labours, T&P etc complete. C.I. D/F Sluice Valves Confirming to IS: 14846-2000 ( Kirloskar or equivalent) 100 MM
Construct 60x60x75 cm brick masonry sluice valve chamber manhole cover with locking arrangement complete.
M/s Kashmirilal Constructions Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .