Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 LAccepted-AOC | ₹3.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.0 LRejected-AOC | ₹4.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SAJEESH P L2 | AJITHKUMAR S. L1 |
|---|---|---|---|---|---|
| 1.00Chekuthankundu LIS | |||||
| 1.00 | OD53399/2025-2026:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling,including scrapping, cleaning and painting with enamel paint. | 3 | each | 6,258.09 ₹18,774.27 | 5,958.96 ₹17,876.88 |
| 1.00 | OD53396/2025-2026:Dismantling the 61-110 HP pump of motor pump set taking out the impeller shaft
assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding
,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump | 1 | each | 7,461.17 ₹7,461.17 | 7,104.53 ₹7,104.53 |
| 1.00 | OD53395/2025-2026:Refitting 61-110 HP motor, starter and other electrical accessories,( Accessories when
necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter
regulator TP switch etc in position giving connections checking correct alignment and trial run
on full load | 3 | each | 6,003.32 ₹18,009.96 | 5,716.36 ₹17,149.08 |
| 1.00 | OD53404/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed | 2 | job | 7,163.84 ₹14,327.68 | 6,821.41 ₹13,642.82 |
| 1.00 | OD53401/2025-2026: Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 29,117.72 ₹29,117.72 | 27,725.89 ₹27,725.89 |
| 1.01 | OD53403/2025-2026: Fully Comprehensive Annual Maintenance contract of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . | 1 | job | 25,405.64 ₹25,405.64 | 24,191.24 ₹24,191.24 |
| 1.01 | OD81958/2025-2026:Fully Comprehensive Annual Maintenance contract of above 61-110 HP squirrel cage
induction motor with split case / End suction pump set controlling electrical accessories , panel
board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush,
carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing
spares with original make as per sample , removing foreign bodies , renewal of gland packing ,
gasket packing , rubber packing , greasing the bearing etc as and when required including
overhauling and maintenance of pump and motor through out the year as required ( excluding
motor rewinding , works arrived due to natural and man made disaster like flood, landslide
etcand starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in
good working condition all time during the period of contract and the faults should be rectified
with in the time allowed | 2 | job | 21,749.89 ₹43,499.78 | 20,710.24 ₹41,420.48 |
| 1.01 | OD259948/2025-2026:Supply, conveyance and filling of good quality LT grade transformer oil.. | 49 | Litre | 134.18 ₹6,574.82 | 127.77 ₹6,260.73 |
| 2.00Thekkepadam LIS | |||||
Tender Value
₹3.8 L
EMD Value
₹9,537
Closing Date
21 Jan 2026, 6:00 pmClosed
Assistant Executive Engineer
Electrical Wing Irrigation Subdivision Chalakkudy
GENERAL AMC 2025 26 Chekuthankundu and Thekkepadam LIS Malappuram Dt Fully Comprehensive Annual Maintenance contract General Electrical Work
2026_Irrig_826030_6
C-ETN-JAN/EL/2025-26
Open Tender
Electrical Works
365 days
Chalakkudy
Please refer Tender documents.
10 documents required · 10 mandatory
₹845
₹9,537
6 Mar 2026
12 Jan 2026
23 Jan 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
Chekuthankundu LIS
OD53399/2025-2026:Dismantling the 61-110 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling,including scrapping, cleaning and painting with enamel paint.
OD53396/2025-2026:Dismantling the 61-110 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD53395/2025-2026:Refitting 61-110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53404/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD53401/2025-2026: Fully Comprehensive Annual Maintenance contract of 61-110 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD53403/2025-2026: Fully Comprehensive Annual Maintenance contract of 61-110 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc, including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD81958/2025-2026:Fully Comprehensive Annual Maintenance contract of above 61-110 HP squirrel cage induction motor with split case / End suction pump set controlling electrical accessories , panel board ,etc, including attending all repairs ,overhauling & , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump and motor through out the year as required ( excluding motor rewinding , works arrived due to natural and man made disaster like flood, landslide etcand starter AMC ) and maintain the motor pump sets , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed
OD259948/2025-2026:Supply, conveyance and filling of good quality LT grade transformer oil..
Thekkepadam LIS
OD53386/2025-2026: Lifting the 5-10 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD53385/2025-2026:Lifting the 31-60 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform.
OD53384/2025-2026:Dismantling the 31-60 HP pump of motor pump set taking out the impeller shaft assembly,detaching impeller shaft assembly,Reconditioning the worn out shaft by welding ,mettaling ,cutting,grinding ,and dynamically balancing etc. refitting the same in pump
OD69469/2025-2026:Dismantling the 31-60 HP motor into stator and rotor, cleaning the windings attending minor repairs, re taping the coils if necessary, varnishing the coils with best quality insulation varnish, cleaning and greasing the bearings with good quality grease, heating the windings, reassembling, test running including scrapping, cleaning and painting with enamel paint.
OD53388/2025-2026: Lowering down and erecting 5-10 HP motor/vacuum motor pump set, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53387/2025-2026:Lowering down and erecting 31-60 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load
OD53393/2025-2026:Fully Comprehensive Annual Maintenance contract of 5-15 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc including attending all repairs , reconditioning the damaged parts , replacing spares with original make as per sample , dismantling and refitting , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling of pump, maintenance of the motor pump sets , pipes , starter and valves electrical accessories etc complete in good working condition(excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc)all time during the period of contract and the faults should be rectified with in the time allowed
OD53392/2025-2026: Fully Comprehensive Annual Maintenance contract of 31-60 HP squirrel cage induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding, works arrived due to natural and man made disaster like flood, landslide etc ) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD53391/2025-2026: Fully Comprehensive Annual Maintenance contract of 31-60 HP slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board, etc ,including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged coupling bush, carbon brush and coupling bolts, refilling of oil, reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required including overhauling and maintenance of pump, motor and starter through out the year as required ( excluding motor rewinding ,works arrived due to natural and man made disaster like flood, landslide etc) and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .
OD260004/2025-2026: Replacing the high carbon sleeve of the existing motor pumpset shaft by dismantling the pump , cleaning and providing fresh gland packing,greasing the bearings, changing oil seals etc,painting with two coats of best enamel paint,including necessary industrial works and correcting alignment of the motor pumpset, transportation ,etc
Rewinding
OD64721/2025-2026:Conveyance charge of 20 - 120 HP motor / pump / panel board / starter board etc by Tata acefrom pump house to workshop and bring back to pump house
OD264605/2025-2026:Charges for rewinding the burnt rotor/stator - separate motor in to stator and rotor, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enamelled copper winding wires, closing the rotor/stator slots with fibre wedges, putting proper inter layer insulation, connecting the coil end connection, providing new stator/rotor lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running.
Bearing
OD64767/2025-2026:Replacing old bearing and supply new bearing bearing no NU316 SKF/FAG OR equivalent
OD64803/2025-2026:Replacing old bearing and supply new bearing no 6316 SKF/FAG or equivalent
OD64804/2025-2026:Replacing old bearing and supply new bearing no 6313 SKF/FAG or equivalent
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1385666.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Tendernotice_2.pdf
PDF • 0.32 MB
BOQ_1385666.xls
BOQ • 0.32 MB
Chekuthankundu10247NITSBDmerged.pdf
Tender Documents • 1.66 MB
Download all tender documents and submit your bid