Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | ₹5.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹5.8 LRejected-AOC AT PATRAPADA SUNDARGARH | SUNDARGARH | SUNDARGARH | ₹5.8 L | L2 | Rejected-AOC Not Accepted |
| 3 | L3₹5.8 LRejected-Finance AT KHAMARIMUNDA BIRKALDIHI BALISANKARA SUNDARGARH | SUNDARGARH | SUNDARGARH | ODISHA | ₹5.8 L | L3 | Rejected-Finance As per Lottery |
| 4 | L4₹5.8 LRejected-Finance | ₹5.8 L | L4 | Rejected-Finance As per Lottery |
| 5 | L5₹5.8 LRejected-Finance | ₹5.8 L | L5 | Rejected-Finance As per Lottery |
Tender Value
₹5.8 L
EMD Value
₹5,803
Closing Date
20 May 2026, 5:00 pmClosed
Executive Officer, Sundargarh Municipality
Executive Officer, Sundargarh Municipality
Construction of Paver block road with drain from SDPO office to DSP quarters in ward no. 15
2026_ORULB_128744_4
SNGM-04/2026-27
Open Tender
Civil Works - Others
Percentage
Sundargarh Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹5,803
Yes
25 Aug 2026
6 May 2026
21 May 2026
6 May 2026
20 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and depositing the soil away as directed by E.I.C . | 41.1 | cum | 276.88 | ₹11,379.77 |
| 2 | Sand filling with filling sand inside F and P including watering and ramming, cost of material, labour, conveyance all taxes T and P etc. complete. | 20.4 | cum | 832.09 | ₹16,974.64 |
| 3 | Metal concrete (1:4:8) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. | 8.4 | cum | 5,341.47 | ₹44,868.35 |
| 4 | C. C (1:2:4) using 12mm size CBG chips chips including compacting, curing, all cost of material, labour, conveyance, royalty, taxes T and P etc. complete excluding centering and shuttering. | 8.1 | cum | 7,216.2 | ₹58,451.22 |
| 5 | RCC M20 grade conc. using 20mm & down grade size CBG chips chips including compacting, curing, all cost of material, labour, conveyance, royalty, taxes T and P etc. complete excluding centering and shuttering. | 19.65 | cum | 5,681.7 | ₹1,11,645.4 |
| 6 | Labour for M.S reinforcement for cutting, bending, binding, tying the grills and placing in position etc. including cost of binding wire 18 to 20 guage and cost of steel. | 13 | Qtl | 8,332.84 | ₹1,08,326.92 |
| 7 | Rigid smooth centering and shuttering to C.C. work including false work and dismantling them after casting complete in Ground Floor. | 177 | sqm | 248.66 | ₹44,012.82 |
| 8 | Labour for laying sub base in layers not exceeding 100 mm thick including watering,compacting to the required density in OMC with PRR including all cost of material ,labour T& P etc. complete. | 4.95 | cum | 1,196.93 | ₹5,924.8 |
| 9 | Supplying & fixing of 80mm thick cement concrete interlocking paver blocks of M40 grade of approved make ,design,colour & size made by block making machine with proper compaction laid in required pattern etc.complete in all respect confirming to IRC SP-63:2018. | 270 | sqm | 608.4 | ₹1,64,268 |
| 10 | Lifting of excavated earth ,debries etc from worksite by mechanical means with in 5km radius etc complete. | 41.1 | cum | 278.77 | ₹11,457.45 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589500.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_589500.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].