| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.1 CrAccepted-AOC | ₹8.1 Cr | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹8.8 CrRejected-AOC 9 206 UDAY SINGH JAIN ROAD ALIGARH 202001 | ALIGARH | UTTAR PRADESH | 202001 | ₹8.8 Cr | 2 | Rejected-AOC L2 Bidder |
| Sl No | Description | Qty | Unit | Technical Construction Co. L2 | CIVILIS INFRA L1 |
|---|---|---|---|---|---|
| 1.00PART A- CIVIL - SITE DEVELOPMENT - Dismantling carefully existing structure of following items in at all levels, including stacking serviceable materials and disposing of unserviceable materials within a lead of 1.5 km or spreading the debris as mentioned by engineer. Item includes cost of labour, erection and de-erection of scaffolding, tools & tackles, loading, transportation, unloading etc. all complete as directed by engineer in charge. Note: - 1. Required steel scaffolding materials are in the scope of contractor. 2. Contractor shall be provide only steel scaffolding i.e H-frame or Cup-lock system and follow safety officer instruction during course of work. 3. All re-usable material from dismantling shall be deposited in CMM store or as directed by engineer in charge | |||||
| 1.01 | Dismantling of False ceiling (aluminium / PVC / fibre / Gypsum) with all accessories, Item includes cost of labour, erection and de-erection of scaffolding, tools & tackles, loading, transportation, unloading etc. all complete as directed by engineer in charge. | 650 | SqM | 150 ₹97,500 | 40 ₹26,000 |
| 1.02 | Dismantling of Doors, windows and ventillators made of steel / wooden / aluminium with shutter including cost of labour, erection and de-erection of scaffolding, tools & tackles, loading, transportation, unloading etc. all complete as directed by engineer in charge. | 120 | SqM | 500 ₹60,000 | 350 ₹42,000 |
| 1.03 | Dismantling of AC corrugated roofing sheets including ridge and J- bolts, Item includes cost of labour, erection and de-erection of scaffolding, tools & tackles, loading, transportation, unloading etc. all complete as directed by engineer in charge. | 950 | SqM | 120 ₹1.1 L | 70 ₹66,500 |
| 1.04 | Dismantling the existing steel structures of various sections such as trusses rafters, purlins, members, angles, plates, channels, I or T section, pipes etc, Item includes cost of labour, erection and de-erection of scaffolding, tools & tackles, loading, transportation, unloading etc. all complete as directed by engineer in charge. | 10 | MT | 25,000 ₹2.5 L | 5,500 ₹55,000 |
| 1.05 | Dismantling of Plastered brick masonry, Item includes cost of labour, erection and de-erection of scaffolding, tools & tackles, loading, transportation, unloading etc. all complete as directed by engineer in charge. | 950 | CuM | 1,500 ₹14.3 L | 2,500 ₹23.8 L |
| 1.06 | Dismantling of Plain cement concrete, Item includes cost of labour, erection and de-erection of scaffolding, tools & tackles, loading, transportation, unloading etc. all complete as directed by engineer in charge. | 80 | CuM | 1,500 ₹1.2 L | 2,500 ₹2 L |
| 1.07 | Dismantling of Reinforced cement concrete, Item includes cost of labour, erection and de-erection of scaffolding, tools & tackles, loading, transportation, unloading etc. all complete as directed by engineer in charge. | 50 | CuM | 2,500 ₹1.3 L | 3,200 ₹1.6 L |
| 2.00 | Surface dressing of the ground including removing of rank vegetation, bushes, shrubs, saplings, trees, stem of cut trees etc. including stacking of serviceable material and disposing unserviceable material within a lead of 1 km including removing and disposing top organic soil not exceeding 150 mm by manual / mechanical means. | 1,250 | SqM | 30 ₹37,500 | 100 ₹1.3 L |
| 3.00 | Earth work in excavation in all types of soils, mixture of gravel and soft soil/disintegrated rock other than hard up to a depth of 3.5 meter from existing ground level and all as per specification for foundations, trenches, inspection chambers, sewer lines buried pipe lines, area grading, for walkways, foundations of wall & post, pits etc. including removal of roots, stones, stone chips, concrete debris, etc. with help of machinery or manually. The cost of work includes labour, tools and tackles, machinery and equipment’s, disposal of surplus soil / good soil in garden premises / debris up to a lead of 1.5 Km as directed by the engineer. | 4,000 | CuM | 500 ₹20 L | 180 ₹7.2 L |
Tender Value
₹9.3 Cr
EMD Value
₹18.5 L
Closing Date
20 Jun 2025, 5:00 pmClosed
CS, KAPS 1 and 2
CS Office, KAPS 1 and 2
Construction of Simulator Building-1 and 2 at Kakrapar Gujarat Site.
2025_NPCIL_236958_1
ET-1622
Open Tender
Civil Works - Buildings
548 days
KAPS 1 and 2 Plant Site
As per tender document
8 documents required · 8 mandatory
₹0
₹18.5 L
Anudisha Bhavan, KAPS 3 and 4 Plant Site
22 Jan 2026
31 May 2025
21 Jun 2025
31 May 2025
20 Jun 2025
10 Jun 2025
31 May 2025 - 9 Jun 2025
10 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.40 MB
BOQ_2.xls
BOQ • 0.23 MB
Tenderdocument.pdf
Tender Documents • 1.26 MB
Tenderdocument.rar
Tender Documents • 2.93 MB
Tenderdocument_2.pdf
Tender Documents • 5.43 MB
Tenderdocument_2.rar
Tender Documents • 1.38 MB
Tenderdocument_3.rar
Tender Documents • 1.77 MB
Tenderdocument_4.rar
Tender Documents • 9.99 MB
Download all tender documents and submit your bid