Assistant Manager (South West Zone)
Repairing & Raising of MH/CH/CP & Replace seat covers With Daimond Cutting Method at TP-85 area,sarkhej gamtal area & Other Diff. Lacation of Sarkhej ward in South West Zone.
280656
18/2025-26-41
Open
Civil - All
Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
26 Feb 2026
26 Feb 2026
26 Feb 2026
2 Mar 2026
26 Feb 2026
Name of work: - Construction of RCC Road at diff places of gamtal area and diff
T.P. Road in Sarkhej ward in South West Zone.
AMDAVAD MUNICIPAL CORPORATION
MAHANAGAR SEVA SADAN
“Late Shri Tushar Deshumukh bhavan,Near Shalby Hospitasl Jodhpur-
E-Tender NOTICE INVITING
Name Of Work:- Construction of RCC Road at diff places of gamtal area and diff
T.P. Road in Sarkhej ward in South West Zone.
(Estimated cost Rs. 14999441.07)
AMC intends to execute the work as mentioned above in AMC limit. Interested contractors
registered with Government of Gujarat in class “D” category or contractors registered in similar
class with other state government, semi government bodies or with Central PWD and fulfilling
the qualifying criteria are requested to download the tender documents of above works from
website -www.nprocure.com from Upto Date 02/03/2026. The last date of online submission of
e-tender is 02/03/2026 upto 18:00 hrs.
Dy.MUNICIPAL COMMISSIONER
Ahmedabad Municipal Corporation Contents
AMDAVAD MUNICIPAL CORPORATION
Name of Work: - Construction of RCC Road at diff places of gamtal area and diff T.P. Road in
Sarkhej ward in South West Zone.
SCHEDULE OF BIDDING PROCESS
Event Description Date
1 Sale of Bid Documents -
2 Last date of online submission 02/03/2026 Up to 18:00 Hrs
3 Last date of physical submission 03/03/2026 Up to 16:00 Hrs
4 Pre bid meeting Deleted
5 Opening of Technical Bid 03/03/2026Up to 17:00 Hrs
6 Opening Of Price Bid 03/03/2026Up to 17:00 Hrs
Ahmedabad Municipal Corporation Contents
AMDAVAD MUNICIPAL CORPORATION
Name of Work: - Construction of RCC Road at diff places of gamtal area and diff T.P. Road in
Sarkhej ward in South West Zone.
Sr. No Particulars Page No.
Invitation for e-tender and Bid Information
Section – I INSTRUCTIONS TO BIDDERS
B Bidding Documents
C Preparation of Bids
D Submission of Bids
F Award of Contract
Annexure-I Undertaking
Annexure-II Letter of Acceptance
Annexure-III Agreement Form
Annexure-IV Issue of Notice to Proceed with the work
Annexure-V Form of Bid Security
Annexure-VI Form of Security Deposite
Annexure-VII List Of Approved Banks
Section-II GENERAL CONDITIONS OF CONTRACT AND SPECIAL
CONDITIONS OF CONTRACT
C Quality Control
E Finishing the contract
F General Description & Scope of Work
G Special condition of contract
Section – III CONTRACT DATA
Section –IV TECHNICAL SPECIFICATIONS
Ahmedabad Municipal Corporation Bid Information
INVITATION FOR Short E-TENDER
Amdavad Municipal Corporation
Tushar Deshmukh Bhavan Second Floor,Near Shalby Hospital,Jodhpur,South West Zone
Web site :www.nprocure.com
1. The Municipal Commissioner, Amdavad Municipal Corporation invites bids for the construction of
works detailed in the Table below from the eligible bidders meeting Eligibility Criteria.
Sr. Name of Work Estimated Amount put to Bid Security (Rs.) Cost of Period of
No. tender (Rs.) Bid Completion
1 Construction of RCC Rs.99,99,912.27 . Rs.10,000.00=00 2400=00 12 Months
Road at diff places of GST will be paid extra by in form as (Excluding
gamtal area and diff AMC/Authority at stipulated in Monsoon)
T.P. Road in Sarkhej prevailing rate to the tender. T
ward in South West contractor.
Minimum Eligibility Criteria:-
1. For eligibility the bidder shall fulfil following criteria.
a) Only single bidder permitted for bidding.
b) No Joint venture/Consortium permitted for bidding.
c) Contractor registered with Amdavad municipal Corporation or Government of Gujarat in class “D”
category or contractors registered in similar class with other state government, semi government
bodies or with Central PWD.
2. The e-tender can be downloaded from the website www.nprocure.com
3. Bids must be accompanied by security of the amount specified for the work in the table, payable
at Amdavad and drawn in favour of Municipal Commissioner, Amdavad. Bid security will have to
be in any one of the forms as specified in the bidding document and shall have to be valid for
days beyond the validity of the bid.
4. E-tender must be submitted online on or before 02/03/2026 up to 18:00 hours. Submission of
hard copy of bid security, Tender fee and other documents in sealed cover in person to office of
AMC as mentioned in bid information on or before 16.00 hours on 03/03/2026. Technical bid will
be opened on 03/03/2026at 17.00 hours in the office of Assistant Manager (SWZ), Tushar
Deshmukh Bhavan Second Floor,Near Shalby Hospital,Jodhpur,South West Zone, in the presence
of the bidders who wish to remain present. If the office happens to be closed on the date of
receipt of the bids as specified, the hard copy of bids will be received and opened on the next
working day at the same time and venue.
5. If any clarifications are required, regarding the bidding document the same can be obtained from
the Addl. Addl. City Engineer (SWZ), Amdavad Municipal Corporation on any working day.
6. Other details can be seen in the bidding documents.
7. Conditional tender will not be accepted. Municipal Commissioner reserves the right to reject any
or all of the tenders without assigning any reason thereof.
Add. City Engineer
Amdavad Municipal Corporation
Signature of Bidder Page 1 AMC
Ahmedabad Municipal Corporation Bid Information
AMDAVAD MUNICIPAL CORPORATION
INFORMATION FOR BIDDERS
1 Name of work Construction of RCC Road at diff places of gamtal
area and diff T.P. Road in Sarkhej ward in South
2 Amount put to Tender Rs.99,99,912.27
3 Time Limit 12 (Twelve) Months (Excluding Monsoon)
4 Download of Tender Documents Short E-Tender shall be downloaded from the
website www.nprocure.com or Up to
date:02/03/2026upto 18:00 hour.
5 Required registration Contractor registered with Amdavad municipal
Corporation or Government of Gujarat in “class D”
category or contractors registered in similar class
with other state government, semi government
bodies or with Central PWD.
6. Tender Fee (Non refundable) Rs.2400.00 (Demand Draft in favour of Municipal
Commissioner, Amdavad payable at Amdavad).
7. Bid Security (EMD) Rs.10,000.00 (in the form of Demand draft or Bank
Guarantee of bank as mentioned in Annexure-VIII in
favor of Municipal Commissioner, Amdavad valid for
120 days (from last date of submission of Hard copy
of tender. Bid submitted without bid security shall be
treated as nonresponsive and shall be summarily
8. Pre-bid Meeting Deleted
9. Last Date of online submission Date 02/03/2026 up to 18:00 Hours
10. Last Date of submission of hard copy Date: date 03/03/2026up to 16.00 hours at office of,
The Assistant Manager (SWZ)
Tushar Deshmukh Bhavan Second Floor,Near Shalby
Hospital,Jodhpur,South West Zone
Financial bid – volume-2 to be submitted online
11. Opening of Technical Bids Date: date:03/03/2026Time: 17.00 Hours
Place: Office of the Addl. City Engineer(SWZ)
Amdavad Municipal Corporation
Tushar Deshmukh Bhavan Second
Floor,Near Shalby Hospital,Jodhpur,South West
ZoneAmdavad-380
12. Opening of Financial Bids 03/03/2026Up to 17:00 Hrs
13. Tender (Bid) Validity Period 120 days from the date of submission of the tender.
14. Security Deposit In the form of Bank Guarantee of bank as mentioned
in Annexure-VII in favour of Municipal Commissioner,
Amdavad amount equal to 5% amount of Contract
Value, valid till 90 days beyond Date of completion of
work. The Security Deposit shall be paid within in
days from date of receipt of LOA failing which
interest @4% per annum will be charged by AMC.
(Contract Value=Approved Tender Amount).
Signature of Bidder Page 2 AMC
Ahmedabad Municipal Corporation Bid Information
15 Defect Liability Period 5 years defect liability period is considered after
completion of work.
16 Performance guarantee Bond for DLP 5% of Amount of Completed Work in form of Bank
Guarantee of Bank as per Annexure-1 (Ref. Circular
No. No.10 Dt.05/08/2024) to be submitted on
completion of work and to be retained till defect
liability period is over.
17. Liquidated Damages As per clause no:49
18 Deductions from Running bill
a. Retention Money Retention Money- @ 2 % of the value of work done
including any Price variation paid to Contractor will
be deducted from each RA bill. It will be released as
per latest AMC circular.
b. Labour Welfare cess Labour Welfare Cess as per the Act, 1996 (non
refundable) shall be deducted from each running bill
on prevailing rate. Present rate is 1 % of value of bill
c Income tax & GST & other taxes The rates are exclusive of GST, all the prevailing taxes
and duties of the Central, State and Local Governing
bodies prevailing on the date of award of the
contract. The Contractor will have to pay all such
taxes and duties for the performance of this
Contract. The Employer will deduct from the
Contractor’s monthly and other payments all taxes
and duties, which he is bound to recover in
accordance with the applicable law.
Addl. City Engineer
Amdavad Municipal Corporation
Signature of Bidder Page 3 AMC
Ahmedabad Municipal Corporation Bid Information
AMDAVAD MUNICIPAL CORPORATION
INFORMATION TO TENDERERS
1. Water, Electricity: Contractor shall have to make his own arrangements for water and
electricity for the purpose of construction work at site at his own expense.
2. Tender which do not fulfil all or any of condition or are submitted incomplete in any
respect or are conditional tenders, will be rejected. Municipal Commissioner reserves the
rights to reduce / increase the Scope of Work up to any extent without assigning any
reason thereof.
3. No price escalation shall be paid/ recovered for the works mentioned in the tender.
4. No advance such as mobilisation, machinery advance or materials advance will be given.
5. Conditional tenders will not be accepted.
6. The sequence of operation shall be decided in consultation with the Engineer-in-charge.
The contractor shall prepare the detail program of work in Bar Chart form and get the
approval from the Addl. City Engineer, AMC, and Amdavad before start of work.
7. For all other information refer tender document.
8. The successful bidder has to apply for registration of relevant class to Amdavad
Municipal Corporation within 15 days from acceptance of LOA and prior to first interim
9. Agency has to arrange all necessary arrangement for colour work at any height of bridge
and make necessary safety during working in traffic and for that no extra payment shall
10. After opening of Technical Bid, Bidder can raise /submit their objection / complaint, but
it shall be before Opening of price bid. After opening of price bid any objection /
complaint will not be allowed. If any bidder, raise or submit their Complaint / quarry
/objection, then it shall be considered as, it is for creating undue pressure on the tender
inviting authority, and that bidder shall debar for 5 years from any type of tendering
procedure with client/AMC, and their EMD shall be forfeited. If the
query/objection/complaint is not raised by any of the Bidder, but other than bidder, then
it will be straight away filed, without checking.
11. The Municipal commissioner reserved unrestricted rights for.
a. Accepting or Rejecting any tender/ lowest tender
b. to divide tender in more than one part and issue work to more than one bidder.
12. After opening of tender or during negotiation discussion, the rates quoted by bidder in
writing shall not be changed. In such case EMD shall be forfeited and the Bidder shall be
disqualifying for future work.
13. Contractor must be quoted the tender rate is excluding GST and hence GST will be paid
extra by AMC or Government authority at prevailing GST rate.
Signature of Contractor: Addl. City Engineer (SWZ)
Date: Amdavad Municipal Corporation
Signature of Bidder Page 4 AMC
Ahmedabad Municipal Corporation Bid Information
Amdavad Municipal Corporation
“Tushar Deshmukh Bhavan,
Second Floor,Near Shalby Hospital,
Jodhpur,South West Zone
1. The information contained in this bid document or subsequently provided to the bidders whether
verbally or in documentary form by or on behalf of the Amdavad Municipal Corporation
(hereinafter called as AMC) or any of their employees/ advisers/ consulting engineers is provided
to the bidder (s) on the terms and conditions set out in this bid document and any other terms
and conditions subject to which such information is provided.
2. This bid document and subsequent submissions of the bidders are not an agreement. These will
subsequently form a part of agreement between the Successful Bidder and the Amdavad
Municipal Corporation after modifications/ additions/ alterations as mutually agreed to.
3. This document does not purport to contain all the information the bidder may find necessary for
the completion of works in a professional manner in accordance with good engineering practice.
The bidder is required to check the accuracy, reliability and completeness of the information in
this bidding document regarding the site, the movement of traffic, the accessibility, the working
conditions, the climatic conditions, the availability of working and storage spaces etc. AMC, its
employees/ advisers/ consulting engineers do not incur any liability under any law, rules or
regulation as to the accuracy, reliability and completeness of the information in this bidding
Signature of Contractor: Addl. City Engineer (SWZ)
Date: Amdavad Municipal Corporation
Signature of Bidder Page 5 AMC
Ahmedabad Municipal Corporation Bid Information
TENDER DECLARATION FORM
Addl. City Engineer
(South West Zone)
Amdavad Municipal Corporation
Name of work: Construction of RCC Road at diff places of gamtal area and diff T.P. Road in Sarkhej
ward in South West Zone.
I/We the undersigned have carefully gone through and clearly understood the Tender documents of
above mentioned project comprising of Notice Inviting tenders, Articles of Agreement, Scope of work,
Definition of terms, notes Instructions/Information to Bidder, Condition of Contract, special condition of
contract, Appendices, Specifications, schedule-B furnished by AMDAVAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the said
document and with such materials as mentioned for, at the respective rates which I/we have quoted in
the financial bid or at such other rates as maybe fixed under the provisions of these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when required,
execute the contract, according to your form 1 of agreement as or in default where of I/we bound
myself/ourselves to forfeit the "Bid Security."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided by AMC from
the date of receipt of letter of acceptance, you will forfeit the Bid Security paid by me/us and take
necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Bid Security", for the sum as mentioned in
NIT, the full value of which is to be absolutely forfeited to the Employer If I/We fail to commence the
work specified. Otherwise the Employer shall retain the said sum, as on account of such Security Deposit
as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in accordance with
conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any tender, which are
received. I / We also understand & agree that Municipal Commissioner Reserves the right to allot number
of tenders to successful bidders at his sole discretion in case if I / We am/are lowest in more than one
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of
opening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State), Octroi duties, Royalty on
material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to time on such items
on which the same are liveable and the rates quoted by me/us are inclusive of the same.
Yours faithfully
Seal and Sign of Contractor
Signature of Bidder Page 6 AMC
Amdavad Municipal Corporation
Section I : Instructions to Bidders
1.0 Scope of Bid
1.1 The Municipal Commissioner, Amdavad Municipal Corporation (referred to as Employer in
these documents) invites sealed bids for the construction of works (as defined in these
documents and referred to as “the work”) detailed in the table given in the Invitation for Bid
(hereinafter called as IFB.) from competent bidders The bidders may submit bids for the
works detailed in the table given in IFB.
1.2 The Successful Bidder will be expected to complete the works by the intended completion
period specified in the Contract data.
1.3 Throughout these bidding documents, the terms; bid’ and ‘tender’ and their derivatives
(bidder/ tenderer, bidding/tendering etc.) are synonymous.
1.4 Blank bidding documents consisting of all the data mentioned in para B. BIDDING
DOCUMENTS are to be downloaded from websites www.nprocure.com
1.5 Bidders shall not have any dispute or claim for any kind of compensation,
i) If the quantity stipulated in the tender items varies or the scope of work changes and
thereby total amount of work increases / decreases up to any extent.
thereby total amount of work increases / decreases up to any extent.
ii) If the works gets delayed / postponed for some administrative / technical decision
iii) If the items stipulated in the tender shall not be executed as per site condition/
requirements. No claim shall be entertained for the same.
iv) No idle charges shall be paid to contractor for machinery and man power if remains idle
and no claim shall be entertained for the same.
2.0 Source of Funds
For this project, the Employer has arranged funds from own resources.
3.0 Eligible Bidders
3.1 This Invitation for Bids is open to all bidders having/meeting eligibility Criteria mentioned in
the bid information.
3.2 All bidders shall provide in Qualification Information and Forms of Bid, a statement that the
Bidder is not associated, directly or indirectly, with the Consultant or any other entity that
has prepared the design, specifications and other documents for the Employer for the
Contract package. An agency that has been engaged by the Employer to provide consulting
services for the preparation or supervision of the works, and any of its affiliates, shall not be
eligible to bid.
Signature of Bidder Page 7 AMC
Amdavad Municipal Corporation
3.2 An enterprise / company may only participate in the bidding process if they are legally and
financially autonomous, operate under commercial law and are not a dependent agency of
(i) Bidders shall not be under a declaration of ineligibility for corrupt or fraudulent or
collusive or coercive practices in accordance with ITB clause No.
(ii) Bidder(s) found to have conflict of interest shall be disqualified. For clarification
purposes a conflict of interest is when bidders:
a) are associated with an agency or any of its affiliates which have been engaged by the
Employer to provide consulting services for the preparation of the design,
specifications, and other documents to be used for the procurement of the
goods/works under these Bidding Documents ;
b) or submit more than one bid in this bidding process. However, this does not limit the
participation of subcontractors in more than one bid.
3.3 Any entity which has been barred by the Central Government, or any entity controlled by it,
from participating in any project (including but not limited to (BOT or otherwise), and the bar
subsists as on the date of application, or has been declared by the Authority as non-
performer/blacklisted would not be eligible to submit the Bid.
4.0 Qualification of the Bidder
4.1 The Bidder is required to show his capability to execute the job within the specified time
frame and up to the required quality standards. To do so, the bidder is encouraged to go
through Qualification criteria and forms and furnish necessary data in respect of plant and
machinery, manpower experience and financial resources to demonstrate his eligibility for
successful implementation of the project.
The bidders should, however, undertake their own studies and furnish with their Bid, a
detailed construction planning and methodology supported with necessary drawings and
calculations to allow the Employer to review their proposals. The numbers, types and
capacities of each plant/equipment shall be shown in the proposals along with the cycle time
for each operation for the given production capacity to match the requirements.
The bidder shall ensure the availability of minimum key personnel for this project. Detailed
bio-data of Project Manager and Materials & Quality Control engineer shall be submitted as
part of Technical Bid. The bidder, however, can make its own assessment and is free to
propose his/her own site organisation.
4.2 Dis-qualification
Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have,
a. Made misleading or false representations in the forms, statements, affidavits and
attachments submitted in proof of the qualification requirements; and/or
b. Record of poor performance such as abandoning the works, not properly completing the
contract, inordinate delays in completion, litigation history, or financial failures etc. or
debarring from AMC work etc.
c. Tampered the bid document in any manner.
d. Colluded with other prospective bidders for this work to arrive at quoted prices for the
Signature of Bidder Page 8 AMC
Amdavad Municipal Corporation
purpose of restricting competition.
e. Indulged in inducement of any official of AMC and/or their consulting engineer and
other advisors in any manner whatsoever.
f. Not submitted Notarized (300 stamp) anti black listing affidavit stating that bidder is not
black listed during last five years before submission date of tender by any municipal
corporation, State Government, Central Government and Local Government Authority
and not submitting any other litigation history with all details.
g. Proposal not submitted in accordance with this tender.
h. During validity of the proposal, or its extended period, if any, the bidder changes his
commercial terms.
i. The bidder qualifies the proposal with his own conditions.
j. Proposal is received in incomplete form or without signature.
k. Proposal is received after due date and time.
l. Proposal is not accompanied by all requisite documents
m. Commercial proposal is enclosed with the same envelope as technical proposal
n. The envelope does not show on the outside the reference of bid and thus gets opened
before the due date of opening.
o. The Bid Security is not deposited in full and in the manner as specified in the bid
p. The tender is in a language other than English or dose not contains its English
Translation in case of other language adopted for tender preparation.
q. The tender documents received are not duly signed by authorized person.
r. The validity of tender is less than what is stated in the tender.
s. Any of the page or pages of tender is/are removed or replaced.
t. Any condition which affect the cost.
u. If it is joint venture.
5.0 One Bid per Bidder
Each bidder shall submit only one bid. The bidder who submits or participates in more than
one Bid will cause all the proposals with the Bidder’s participation to be disqualified.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his Bid, and
the Employer will in no case be responsible and liable for those costs.
The Bidder, at the Bidder’s own responsibility and risk is deemed to have inspected and
examined the site and its surroundings after visit to site of Works and its surroundings and
obtain all information that may be necessary for repairing the Bid and entering into a
contract for construction of the Works. The costs of visiting the Site shall be at the Bidder’s
own expense. Particular attention of bidders, besides other aspects, is invited to:
The form and nature of work and subsurface conditions
The climatic conditions
The extent and nature of work and materials necessary for the execution and
completion of the Works
The means of access to the site and the accommodation he may require and
All other information as to risks, contingencies and circumstances which may influence
or affect his bid.
Signature of Bidder Page 9 AMC
Amdavad Municipal Corporation
B. Bidding Documents
8.0 Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda issued.
Volume 1 Condition of Contract and Technical Information Drawing.
Volume 2 Financial bid.
8.2 The bidder is expected to examine carefully all instructions, conditions of contract, contract
data, forms, terms, technical specifications, Schedule B, forms, Annexes and drawings in the
Bid Document. Failure to comply with the requirements of Bid Documents shall be at the
bidder’s own risk. Bids which are not substantially responsive to the requirements of the Bid
Documents shall be rejected.
9.0 Corrigendum of Bidding Documents
9.1 Before the deadline for online submission of bids, the Employer may modify the bidding
documents by issuing addenda.
9.2 Any Corrigendum thus issued shall be part of the bidding documents and shall be placed on
website www.nprocure.com. The prospective bidders shall refer to the website to check any
addendum before 48 hours of online submission of bids. AMC will not give any
advertisement for the same.
9.3 To give prospective bidders reasonable time in which to take an addendum into account in
preparing their bids, the Employer may, at his desecration, extend as necessary the deadline
for submission of bids, in accordance with Sub-Clause 20.2 below.
9.4 All bidders are requested to see the website www.nprocure.com for corrigendum for the Bid.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for online submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed on
website www.nprocure.com. The prospective bidders shall refer to the website to check any
addendum before 48 hours of online submission of bids. AMC will not give any
advertisement for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into account in
preparing their bids, the Employer may, at his desecration, extend as necessary the deadline
for submission of bids, in accordance with Sub-Clause 20.2 below.
10.4 All bidders are requested to see the website www.nprocure.com for amendment or
corrigendum for the Bid.
Signature of Bidder Page 10 AMC
Amdavad Municipal Corporation
C. Preparation of Bids
11.0 Language of the Bid
All documents relating to the bid shall be in the English language.
12.0 Documents comprising the Bid
12.1 To qualify for award of the contract, each bidder must upload the scanned copies of
following documents along with the submission of online bidding:
i. Bid Security & tender fee.
ii. Tender Declaration Form on bidder’s letter head as per Annexure-I.
iii. A Certificate of Declaration of PF as per Annexure-II
iv. Affidavit as per format provided in Annexure-III
v. Undertaking in form given in Annexure-IV
vi. Qualification Information forms and documents as per Volume-II
vii. Undertaking that the bid shall remain valid for the period specified in bid information.
ix. Volume II (Unpriced BOQ duly stamped and signed.)
x. Detailed safety manual.
Each copy (Original & Duplicate) will be separately sealed and marked in accordance
with the Sealing and Marking Instructions as per clause no. 19.0.
Volume – II Financial Bid to be submitted online only
12.2 Though, the scanned copies of above mentioned documents is required to be uploaded
during submission of e-bid on the e-tendering portal of (n) procure, however, following
original documents in physical form in two copies, one marked as “original” and other
marked as “Duplicate”, shall be submitted in a sealed envelope by 16.00 Hrs on the date of
submission of bid and addressed to the addressee given in the NIT duly super scribed “Name
of Work, Bid due date and time, Name and address of the bidder”
1. Bid security (EMD)
2. Tender Processing Fee
3. Certificate as registered contractor with Government of Gujarat or appropriate
4. Undertakings mentioned in Section III (Qualification Information) of this document.
5. Any other material / information required to be submitted in accordance with these
Instructions to Bidders (ITB)
6. Volume- I of Tender Document
Volume – II Financial Bid to be submitted online only
12.3 The bidder shall prepare and submit two copies of the bid, marking them ‘Original’ and
‘Duplicate’ respectively. The copies of bid security and tender fee shall also be enclosed in
the ‘duplicate’ of bid.
12.4 The Bidder will be required to sign each page of these documents.
Signature of Bidder Page 11 AMC
Amdavad Municipal Corporation
12.5 These signed documents along with the documents of accepted bid, shall form a part of the
contract agreement between the Employer and the successful bidder.
13.0 Bid Prices
13.1 The contract shall be for the whole works as described in various documents as listed in Sub-
Clause 11.1 including the schedule B.
13.2 The bidder shall quote his percentage rate in figures and words online only.
13.3 All duties, taxes, and other levies payable by the contractor under the contract, or for any
other cause shall be included in the rates, prices and total Bid Price submitted by the Bidder.
Employer will not compensate the bidder (contractor) for any change in duties, taxes and
other levies payable by the contractor under the contract and any other reasons.
13.4 The percentage rate and bid price quoted by the bidder shall be fixed for the duration of the
Contract and shall not be subject to adjustment on any account, except where expressly
specified, otherwise, in the contract.
14.0 Currencies of Bid and Payment
14.1 The unit rates and the price of schedule B are in Indian Rupees. All payments shall be made
in Indian Rupees.
15.0 Bid Validity
15.1 Bids shall remain valid for a period not less than 120 days after the deadline date for bid
submission (hard copy) specified in Clause 19.0. A bid valid for a shorter period shall be
rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer may
request that the bidders may extend the period of validity for a specified additional period.
The request and the bidders' responses shall be made in writing or by cable. A bidder may
refuse the request without forfeiting his bid security. A bidder agreeing to the request will
not be required or permitted to modify his bid, but will be required to extend the validity of
his bid security for a period of the extension, and in compliance with Clause 15.0 in all
16.0 Bid Security
16.1 The Bidder shall furnish, as part of his Bid, a Bid Security of the amount as shown in para 6 of
Bid information for this particular work. The bid security shall be in form of Bank guarantee /
Demand Draft in favour of the Municipal Commissioner, Amdavad from Approved bank of
AMC as per Annexure-VII.
16.2 Any bid not accompanied by an acceptable Bid Security and not secured as indicated in Sub-
Clauses 14.1 above shall be rejected by the Employer as non-responsive.
16.3 The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be
returned as promptly as possible.
Signature of Bidder Page 12 AMC
Amdavad Municipal Corporation
16.4 The Bid Security of the L1, L2 and L3 will be discharged when Successful Bidder has signed
the Agreement and furnished the required Performance Security.
16.5 The Bid Security may be forfeited, if
a) the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) the Bidder does not accept the correction of the Bid Price, pursuant to Clause 26; or
c) the successful Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required Performance Security.
17.0 Alternative Proposals by Bidder
Bidders shall submit offers that comply with the requirements of the bidding documents,
including the basic technical design as indicated in the drawing and specifications.
Alternatives will not be considered.
18.0 Format and Signing of Bid
18.1 The Bidder shall prepare one original and one duplicate of the documents comprising the bid
as described in Clause 11 of these Instructions to Bidders, bound with the volume containing
the ‘Technical Bid’ in separate copies and clearly marked "ORIGINAL" and "DUPLICATE" as
appropriate. In the event of discrepancy between them, the original shall prevail.
18.2 The original and duplicate of the Bid shall be typed or written in indelible ink and shall be
signed by a person or persons duly authorized to sign on behalf of the Bidder. All pages of
the Bid where entries or amendments have been made shall be initialled by the person or
persons signing the bid.
18.3 The Bid shall contain no alterations or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case
such corrections shall be initialled by the person or persons signing the bid.
18.4 Sufficiency of bid: The bidder shall be deemed to have satisfied himself as to the correctness
and sufficiency of the bid and of the rates and prices stated in the schedule B, all of which
shall, cover all his obligations under the contract and all matters and things necessary for the
proper execution and completion of Works and the remedying of the defects therein.
Signature of Bidder Page 13 AMC
Amdavad Municipal Corporation
D. Submission of Bids
19.0 Sealing and Marking of Bids
19.1 The bid shall be submitted online as describe in bid information. Hard copies of documents
(except financial bid which shall be submitted online only) like (1) Bid security & tender fee
and (2) Volume-I, qualification documents, etc. shall be submitted in separate sealed
envelopes duly marked as "ORIGINAL" and "DUPLICATE". These three envelopes (called as
inner envelopes) shall then be put inside one outer sealed envelope and will be submitted
under formal forwarding letter address to the Employer inter alia containing an undertaking
that the bid documents does not contain any amendment, modification or change of any
type whatsoever in the bid documents and to any amendment issued.
19.2 The each envelopes shall be addressed to Employer as mentioned in Bid Information bearing
the following Identification.
Bid for ______________ (name of work)
Bid reference No._____________________
DO NOT OPEN BEFORE __________________(time & date for bid opening)
ORIGINAL And Duplicate
Name and address of the Bidder.
19.3 If the outer envelopes are not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the Bid.
20.0 Deadline for Submission of the Bids
20.1 Complete Bids (including Technical and Financial) must be received by the Employer at the
address specified in bid information not later than the date indicated on the face sheet of the
document. In the event of the specified date for the submission of bids declared a holiday for
the Employer, the Bids will be received up to the appointed time on the next working day.
20.2 The Employer may extend the deadline for submission of bids by issuing an amendment in
accordance with Clause 8, in which case all rights and obligations of the Employer and the
bidders previously subject to the original deadline will then be subject to the new deadline.
20.3 All bidders are requested to see the website of www.nprocure.com for corrigendum as per
clause no. 8.0.
21.1 Any Bid received by the Employer after the deadline prescribed in Clause 19 will be rejected
and returned unopened to the bidder.
22.0 Modification and Withdrawal of Bids
22.1 After submitting online, no modification shall be done by the bidder. However bidder may
withdraw their bids by giving notice in writing before the deadline date of submission of hard
22.2 Each Bidder's withdrawal notice shall be prepared, sealed, marked, and delivered in
accordance with Clause 18 & 19, with the outer and inner envelopes additionally marked
"WITHDRAWAL" as appropriate.
22.3 No bid may be modified after the online submission of Bids.
Signature of Bidder Page 14 AMC
Amdavad Municipal Corporation
22.4 Withdrawal or modification of a Bid between the deadline for submission of bids and the
expiration of the original period of bid validity specified in Clause 15.1 above or as extended
pursuant to Clause 14.2 shall result in the forfeiture of the Bid security pursuant to Clause
Signature of Bidder Page 15 AMC
Amdavad Municipal Corporation
23.0 Bid Opening
23.1 The Employer will open all the Bids received (except those received late), including
modifications made pursuant to Clause 19, in the presence of the Bidders or their
representative who choose to attend. In the event of the specified date of Bid opening being
declared a holiday for the Employer, the Bids will be opened at the appointed time and
location on the next working day.
23.2 Envelopes marked “WITHDRAWAL” shall be opened and read out first. Bids for which an
acceptable notice of withdrawal has been submitted pursuant to Clause 21 shall not be
opened. Subsequently all envelops marked “MODIFICATION” shall be opened and
submissions there in read out in appropriate detail.
23.3 The envelope containing “Technical Bid” shall be opened. The amount, form and validity of
the bid security furnished with each bid will be announced. If the bid security furnished does
not conform to the amount and validity period as specified in the Invitation for Bid (ref.
Column 4 and paragraph 2), and has not been furnished in the form specified in Clause
the remaining technical bid and the sealed financial bid will be returned to the bidder
terming it as non-responsive.
23.4 (i) Subject to confirmation of the bid security by the issuing Bank, the bids accompanied with
valid bid security will be taken up for evaluation with respect to information furnished in
Technical Bid of the bid pursuant to Clause
(ii) After receipt of confirmation of the bid security, the bidder will be asked in writing
(usually within 10 days of opening of the Technical Bid) to clarify or modify his technical
bid, if necessary, with respect to any rectifiable defects.
(iii) The bidders will respond in not more than 7 days of issue of the clarification letter, which
will also indicate the date, time and venue of opening of the Financial Bid (usually on the
21st day of opening of the Technical Bid)
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarifications the Evaluation
committee will finalise the list of responsive bidders whose financial bids are eligible for
23.5 If, as a consequence of the modifications carried out by the bidder in response to sub-clause
17.4, the bidders desire to modify their financial bid, they will submit the modification in
separate sealed envelope so as to reach the Employer’s address (refer sub-clause 16.2)
before the opening of the financial bid as intimated in the clarification letter (refer sub-clause
17.4). The envelope shall have clear marking “MODIFICATION TO FINANCIAL BID- Not to be
opened except with the approval of the Evaluation Committee”
23.6 At the time of opening of “Financial Bid”, the names of the bidders who were found
responsive in accordance with Clause 25.2 will be announced. The bids of only these bidders
will be opened. The remaining bids will be returned to the bidders unopened. The responsive
Bidders’ names, the Bid prices, the total amount of each bid, any discounts, Bid Modifications
Bidders’ names, the Bid prices, the total amount of each bid, any discounts, Bid Modifications
and Withdrawals, and such other details as the Employer may consider appropriate, will be
Signature of Bidder Page 16 AMC
Amdavad Municipal Corporation
announced by the Employer at the opening. Any bid price or discount, which is not read out
and recorded, will not be taken into account in Bid Evaluation.
23.7 The Employer shall prepare minutes of the Bid opening, including the information disclosed
to those present in accordance with Sub-Clause 22.6.
25.0 Clarification of Bids
25.1 To assist in the examination, evaluation, and comparison of Bids, the Employer may, at his
discretion, ask any Bidder for clarification of his Bid, including breakdowns of% above or
below amount put to tender. The request for clarification and the response shall be in writing
or fax or e-mail, but no change in the price or substance of the Bid shall be sought, offered,
or permitted except as required to confirm the correction of arithmetic errors discovered by
the Employer in the evaluation of the Bids in accordance with Clause
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter relating to his
bid from the time of the bid opening to the time the contract is awarded. If the Bidder wishes
to bring additional information to the notice of the Employer, he should do so in writing.
25.3 Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid
comparison or contract award decisions may result in the rejection of the Bidders’ bid.
26.0 Examination of Bids and Determination of Responsiveness
26.1 During the detailed evaluation of ‘Technical Bids’, the Employer will determine whether each
bid (a) meets the eligibility criteria defined in Clauses 3 and 4; (b) has been properly signed;
(c) is accompanied by required securities and; (d) is substantially responsive to the
requirements of the ‘Bidding Documents’. During the detailed evaluation of the “Financial
Bid”, the responsiveness of the bids will be further determined with respect to the remaining
bid conditions, i.e., priced schedule B, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one of which conforms to all the terms,
conditions, and specifications of the Bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any substantial
way the scope, quality, or performance of the Works; (b) which limits in any substantial way,
inconsistent with the Bidding documents, the Employer’s rights or the Bidder’s obligations
under the Contract; or (c) whose rectification would affect unfairly the competitive position
of other Bidders presenting substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer, and
may not subsequently be made responsive by correction or withdrawal of the non-
conforming deviation or reservation.
Signature of Bidder Page 17 AMC
Amdavad Municipal Corporation
27.0 Correction of Errors
27.1 “Financial Bids” determined to be substantially responsive will be checked by the Employer
for any arithmetic errors. Errors will be corrected by the Employer as follows:
a) Where there is a discrepancy between the % quote in figures and in words, the % quote
in words will govern; and
b) Where there is a discrepancy between the unit rate and the line item total resulting from
multiplying the unit rate by the quantity, the unit rate as mentioned in the BOQ will
27.2 The amount stated in the “Financial Bid” will be corrected by the Employer in accordance
with the above procedure and the bid amount adjusted with the concurrence of the Bidder
in the following manner:
a) If the Bid price increases as a result of these corrections, the amount as stated in the bid
will be the ‘bid price’ and the increase will be treated as rebate;
b) If the bid price decreases as a result of the corrections, the decreased amount will be
treated as the ‘bid price’
28.0 Employer’s Rights
The Employer (Municipal Commissioner) Reserves right,
1. To waive any qualifying criteria or information in any tender as a special case and to
reject any or all tenders without assigning any reason thereof.
2. To increase / decrease the scope of work & also split the tender in two or more
contracts without assigning any reason even after the work is awarded.
3. To allot number of tenders to successful bidders, in case if any contractor is lowest in
more than one tender.
To collect any required documents after bid opening and also reserves the right for
rejection/acceptance of any tender.
29.0 Evaluation and Comparison of Bids
29.1 The Employer will evaluate and compare only the Bids determined to be substantially
responsive in accordance with Sub-Clause 25.2.
29.2 In evaluating the Bids, the Employer will determine for each Bid the evaluated Bid Price by
adjusting the Bid Price as follows:
a) Making any correction for errors pursuant to Clause 26; or
b) Making an appropriate adjustment for any other acceptable variations, deviations; and
c) Making appropriate adjustments to reflect discounts or other price modifications offered
in accordance with Sub Clause 26.2.
29.3 The Employer reserves the right to accept or reject any variation or deviation and other
factors, which are in excess of the requirements of the Bidding documents or otherwise
result in unsolicited benefits for the Employer. However, the same shall not be taken into
account in Bid evaluation.
29.4 If the Bid of the Successful Bidder is seriously unbalanced in relation to the Engineer's
estimate of the cost of work to be performed under the contract, the Employer may require
the Bidder to produce detailed % quote price analysis for any or all items of the schedule B,
to demonstrate the internal consistency of those prices with the construction methods and
Signature of Bidder Page 18 AMC
Amdavad Municipal Corporation
schedule proposed. After evaluation of the % quote price analysis, the Employer may require
that the amount of the Performance Security set forth in Clause 31 be increased at the
expense of the Successful Bidder to a level sufficient to protect the Employer against
financial loss in the event of default of the Successful Bidder under the Contract.
29.5 A bid which contains several items in the schedule B which are unrealistically % quoted
priced low and which cannot be substantiated satisfactorily by the bidder may be rejected as
‘non-responsive’.
29.6 Requirement of submission of analyses by the contractor should be complied and submitted
to the Employer within the stipulated time fixed by the Employer failing which the bid would
be treated as non-responsive.
Signature of Bidder Page 19 AMC
Amdavad Municipal Corporation
F. Award of Contract
30.0 Award Criteria
30.1 Subject to Clause 30 the Employer will award the Contract to the Bidder whose Bid has been
determined to be substantially responsive to the Bidding documents and who has offered
the lowest evaluated Bid Price.
31.0 Employer's Right to Accept any Bid and to Reject any or all Bids
31.1 Notwithstanding anything contained in this Bid, the Authority reserves the right to accept or
reject any Application and to annul the Bidding Process and reject all Applications/ Bids, at
any time without any liability or any obligation for such acceptance, rejection or annulment,
and without assigning any reasons therefore. In the event that the Authority rejects or annuls
all the Bids, it may, in its discretion, invite all eligible Bidders to submit fresh Bids hereunder.
31.2 The Authority reserves the right to reject any Application and/ or Bid if:
(a) at any time, a material misrepresentation is made or uncovered, or
(b) the Applicant does not provide, within the time specified by the Authority, the
supplemental information sought by the Authority for evaluation of the Application. If
such disqualification/ rejection occur after the Bids have been opened and the Highest
Bidder gets disqualified/ rejected, then the Authority reserves the right to:
(i) invite the remaining Bidders to match the Highest Bidder/ submit their Bids in
accordance with the TENDER; or
(ii) take any such measure as may be deemed fit in the sole discretion of the Authority,
including annulment of the Bidding Process.
31.3 In case it is found during the evaluation or at any time before signing of the agreement or
after its execution and during the period of work, that one or more of the pre-qualification
conditions have not been met by the Applicant, or the Applicant has made material
misrepresentation or has given any materially incorrect or false information, the Applicant
shall be disqualified forthwith if not yet appointed as the Concessionaire either by issue of
the LOA or entering into of the Concession Agreement, and if the Applicant/SPV has already
been issued the LOA or has entered into the Concession Agreement, as the case may be, the
same shall, notwithstanding anything to the contrary contained therein or in this TENDER, be
liable to be terminated, by a communication in writing by the Authority to the Applicant,
without the Authority being liable in any manner whatsoever to the Applicant and without
prejudice to any other right or remedy which the Authority may have under this TENDER, the
Bidding Documents, the Concession Agreement or under applicable law.
31.4 The Authority reserves the right to verify all statements, information and documents
submitted by the Applicant in response to the TENDER. Any such verification or lack of such
verification by the Authority shall not relieve the Applicant of its obligations or liabilities
hereunder nor will it affect any rights of the Authority hereunder.
32.0 Notification of Award and Signing of Agreement
32.1 The Bidder whose Bid has been accepted will be notified of the award by the Employer prior
to expiration of the Bid validity period by writing, facsimile or e-mail confirmed by registered
letter. This letter (hereinafter and in the Conditions of Contract called the "Letter of
Acceptance" as per format given in Annexure-II) will state the sum that the Employer will pay
the Contractor in consideration of the execution, completion, and maintenance of the Works
Signature of Bidder Page 20 AMC
Amdavad Municipal Corporation
by the Contractor as prescribed by the Contract (hereinafter and in the Contract called the
"Contract Price").
32.2 The notification of award will constitute the formation of the Contract, subject only to the
furnishing of a Performance Security in accordance with the provisions of Clause
32.3 The agreement will incorporate all correspondences between the Employer and the
Successful Bidder. It will be signed by the Employer and the Successful Bidder.
32.4 Upon the furnishing by the Successful Bidder of the Performance Security, the Employer will
promptly notify the other Bidders that their Bids have been unsuccessful.
33.0 Security deposit
33.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall deliver to
the Employer a Security deposit in of the forms given below for an amount equivalent to 5%
of the Contract Price, failing which interest @ 4% per annum will be charges by AMC.
- A Bank Guarantee in the form as per Annexure-VI; or
- Bank Draft in favour of Municipal Commissioner, Amdavad payable at Ahmedabad.
33.2 The Security deposit provided by the Successful Bidder in the form of a Bank Guarantee
should be issued by Ahmedabad branch of Bank as per Annexure-VII in favour of Municipal
Commissioner, Amdavad.
33.3 Failure of the Successful Bidder to comply with the requirements of Sub-Clause 31.1 shall
constitute sufficient grounds for cancellation of the award and forfeiture of the Bid Security.
33.4 The Security deposit shall be valid till 120 days beyond Date of completion.
33.5 Prior to making a claim under the Security deposit the Employer shall, in every case, notify
the Contractor stating the nature of default in respect of which the claim is to be made.
34.0 Advance Payment and Security
34.1 The Employer will not provide any advance payment.
35.0 Dispute Review Expert /Arbitration
35.1 In case of all the disputes, decision of the Municipal Commissioner, Amdavad shall be final
and binding to the bidder. Municipal Commissioner shall be the sole Arbitrator.
36.0 Corrupt or Fraudulent Practices
36.1 The Employer will reject a proposal for award if it determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in competing for the contract in
question and will declare the firm ineligible, either indefinitely or for a stated period of time.
36.2 The bidder and their respective officers, employees, agents and advisers shall observe the
highest standard of ethics during the bidding process. Notwithstanding anything to the
contrary contained herein, the Employer may reject any bid without being liable in any
manner whatsoever to the bidder if it determines that the bidder has, directly or indirectly or
through an agent, engaged in corrupt practice, fraudulent practice, coercive practice,
undesirable practice or restrictive practice in the bidding process.
Signature of Bidder Page 21 AMC
Amdavad Municipal Corporation
36.3 Without prejudice to the rights of the Employer under Clause 34 hereinabove, if an bidder is
found by the Employer to have directly or indirectly or through an agent, engaged or
indulged in any corrupt practice, fraudulent practice, coercive practice, undesirable practice
or restrictive practice during the bidding process, such bidder shall not be eligible to
participate in any tender issued by the Employer during a period of 2 (two) years from the
date such bidder is found by the Employer to have directly or indirectly or through an agent,
engaged or indulged in any corrupt practice, fraudulent practice, coercive practice,
undesirable practice or restrictive practice, as the case may be.
36.4 For the purposes of this Clause 34, the following terms shall have the meaning hereinafter
respectively assigned to them:
(a) “corrupt practice” means the offering, giving, receiving, or soliciting, directly or
indirectly, of anything of value to influence the actions of any person connected with
the bidding process (for avoidance of doubt, offering of employment to, or
employing, or engaging in any manner whatsoever, directly or indirectly, any official
of the Employer who is or has been associated in any manner, directly or indirectly,
with the bidding process or has dealt with matters concerning the Contract or arising
there from, before or after the execution thereof, at any time prior to the expiry of
one year from the date such official resigns or retires from or otherwise ceases to be
in the service of the Employer, shall be deemed to constitute influencing the actions
of a person connected with the bidding process); engaging in any manner
whatsoever, whether during the bidding process or after the award or after the
execution of the Contract, as the case may be, any person in respect of any matter
relating to the Works, who at any time has been or is a legal, financial or technical
adviser of the Employer in relation to any matter concerning the Works;
(b) “Fraudulent practice” means a misrepresentation or omission of facts or suppression
of facts or disclosure of incomplete facts, in order to influence the bidding process;
(c) “Coercive practice” means impairing or harming or threatening to impair or harm,
directly or indirectly, any person or property to influence any person’s participation
or action in the bidding process;
(d) “undesirable practice” means establishing contact with any person connected with
or employed or engaged by the Employer with the objective of canvassing, lobbying
or in any manner influencing or attempting to influence the bidding process; and
(f) “Restrictive practice” means forming a cartel or arriving at any understanding or
arrangement among bidder with the objective of restricting or manipulating a full
and fair competition in the bidding process.
38.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration resulting
from Contractors completed or under execution by him over last five year If the details of
Litigation History are hidden by the Bidder and later on it comes to the knowledge of the
Employer, the Bidder shall be disqualified for the proposed work and other appropriate
actions shall be taken against the bidder.
Signature of Bidder Page 22 AMC
Amdavad Municipal Corporation
(Letterhead paper of the Employer)
1. I / We hereby declared that our firm M/s ________________________________has not
blacklisted in any municipal corporation, states, CPWD / MES / Railways or any Government,
Semi-Government department since last five years before date of submission of the tender.
2. The I / We also hereby certifies that our firm M/s ________________________________has
neither abandon any work in India nor rescinded any contract awarded to us during last five
years prior to the date of this bid.
3. At present I/We am/are registered as approved contractor (s), firms in any state, CPWD /
MES / Railways.
4. We, the partners/owners of this firm, hereby give an undertaking that we are jointly and
severally responsible to meet all the liabilities ever and above the business of this firm and
make good the above financial loss sustained by the Amdavad Municipal Corporation as a
result of our abandoning the works entrusted to us.
5. I /We hereby certify that all the statements made in the required attachments are true and
6. The I / We undersigned hereby authorise(s) and request(s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by the
Department to verify this statement or regarding my (our) competence and general
7. I /We hereby declare that I / We understand and agree that further qualifying information
may be requested, and I / We also agree to furnish any such information at the request of
the AMC within the prescribed time.
8. I / We further declare that my / our near relatives are not working in AMC as an Additional
Addl. City Engineer, Deputy Addl. City Engineer, Assistant Addl. City Engineer, Assistant
Engineer and technical supervisor as on today.
9. I / We hereby declare that I / we have visited the site and fully acquainted myself / ourselves
with the local situations regarding materials, labour and other factors pertaining to the work
before submitting this tender. I/We certify that I/We have inspected the location of the
proposed work before quoting my/our rates.
10. I/We have also inspected the quarries and borrow areas and satisfied myself/ourselves
regarding the quality, quantity, availability, and transport facilities for earth, stone, bricks,
and, cement etc. through the network of available roads and path ways required for the
11. I / We hereby declare that I / we have carefully studied all the terms and conditions of
contract, specifications mentioned in the tender documents and I / we do agree for
compliance with the same strictly.
Signature of Bidder Page 23 AMC
Amdavad Municipal Corporation
12. I/We shall execute the contract agreement with the AMC after award of work and before
13. I / We hereby declared that the bid submitted by us will remain valid for a period of 120 days
after last date submission of hard copy.
14. I / We hereby certifies that in case of all the disputes, decision of the Municipal
Commissioner, Amdavad shall be final and binding to us. Municipal Commissioner shall be
the sole Arbitrator.
15. I, the undersigned do hereby undertake that our firm M/s ___________________________
would invest minimum cash up to 15% of the value of the work or as required for
implementation of this Contract.
16. I/We shall apply for registration of relevant class to Amdavad Municipal Corporation within
15 days from acceptance of LOA and prior to first interim payment, if work will be allotted to
our firm M/s_________________
(Signed by an Authorized Representative of the Firm)
Name of the Representative
Signature of Bidder Page 24 AMC
Amdavad Municipal Corporation
Letter of Acceptance
(Letterhead paper of the Employer)
[name and address of the Contractor]
This is to notify you that your Bid dated _____________________ for execution of the
the contract and identification number, as given in the Instructions to Bidders] for the Contract Price
_________________________(amount in words and figures, as corrected and modified in
accordance with the Instructions to Bidders) is hereby accepted by competent Authority.
We note that as per bid, you do not intend to subcontract any component of work.
You are hereby requested to furnish Security Deposit in the form detailed in Clause 31.1 of ITB for
amount of Rs.______________________ within 15 days of the receipt of this letter of acceptance,
valid up to 90 days from the date of completion i.e. up to _________________and sign the contract,
failing which action as stated in Clause 31.3 of ITB will be taken.
Yours faithfully,
Authorized Signatory
Name and Title of Signatory
Signature of Bidder Page 25 AMC
Amdavad Municipal Corporation
(Letterhead paper of the Employer)
This agreement, made the _____________________day of __________________
Employer] (here inafter called “the Employer”) the one part
(here in after called “the Contractor” of the other part).
Whereas the Employer is desirous that the Contractor executes
[name and identification number of Contract] (Here in after called “the Works”) and the Employer
accepted the Bid by the Contractor for the execution and completion of such Works and the
remedying of any defects therein, at a Contract Price of Rs. _____________________________
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expression shall have the same meanings as are respectively
assigned to them in the Conditions of Contract hereinafter referred to, and they shall be
deemed to form and be read and construed as part of this Agreement.
2. In consideration of the payments to be made by the Employer to the Contractor as
hereinafter mentioned, the Contractor hereby covenants with the Employer to execute and
complete the Works and remedy any defects therein in conformity in all aspects with the
provisions of the Contract.
3. The Employer hereby covenants to pay the Contractor in consideration of the execution and
completion of the Works and the remedying the defects wherein the Contract Price or such
other sum as may become payable under the provisions of the Contract at the times and in
the manner prescribed by the Contract.
4. The following documents shall be deemed to form and be read and construed as part of this
Agreement, viz.:
i) The notice inviting bids
ii) The Contract Agreement
iii) The instructions to Bidders
iv) The Bid Information
v) The Letter of Acceptance and notice to proceed with the works
vi) The accepted Contractor’s Bid after amendments, addenda.
vii) The Contract Data
viii) The General Conditions of Contract and special conditions of contract
ix) The Technical Specifications
x) The Drawings
xi) The Schedule B
xii) Any other document listed in the Contract Data as forming part of the Contract.
xiii) Submission made by contractor as per qualification
Signature of Bidder Page 26 AMC
Amdavad Municipal Corporation
In witness whereof the parties thereto have caused this Agreement to be executed the day and year
first before written.
was hereunto affixed in the presence of:
Signed, Sealed and Delivered by the said ___________________________________________
Binding Signature of Employer ___________________________________________________
Binding Signature of Contractor ____________________________________________________
Signature of Bidder Page 27 AMC
Amdavad Municipal Corporation
Issue of Notice to Proceed with the Work
(Letterhead of the Employer)
____________________________________ [name and address of the Contractor]
Pursuant to your furnishing the Security Deposit as stipulated in Information to bidders (ITB) clause
31.1 and signing of the contract agreement for the construction of (Name of Work) at the accepted
Bid Price of Rs. ______________ ( In words ), you are hereby instructed to proceed with the
execution of the said works in accordance with the contract documents.
Yours faithfully,
(Signature, name and title of signatory
authorized to sign on behalf of Employer)
Signature of Bidder Page 28 AMC
Amdavad Municipal Corporation
BANK GUARANTEE FOR BID SECURITY
(EARNEST MONEY)
WHEREAS,___________________[Name of Bidder] (hereinafter called “the Bidder”) is submitting
his bid for the construction of ______________________________________________[name of
Contract] (hereinafter called “the Bid”).
KNOW ALL PEOPLE by these presents that We__________________________ [name of bank] of
__________________________ (name of country) having our registered office at
_________________________________ (hereinafter called “the Bank”) are bound up to
___________________________________[name of Employer] (hereinafter called “the Employer”) in
the sum of __________________________for which payment well and truly to be made to the said
Employer the Bank binds itself, his successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this ______________ day of ___________
THE CONDITIONS of this obligations are:
(1) If after Bid opening the Bidder withdraws his Bid during the period of bid validity specified in
the Form of Bid; or
(2) If the Bidder having been notified of the acceptance of his Bid by the Employer during the
period of bid validity:
(a) Fails or refuses to execute the Form of Agreement in accordance with the Instructions to
Bidders, if required; or
(b) Fails or refuses to furnish the Security Deposit, in accordance with the Instructions to
(c) Does not accept the correction of the Bid Price pursuant to Clause
We undertake to pay to the Employer up to the above amount upon receipt of his first written
demand, without the Employer having to substantiate his demand, provided that in his demand the
Employer will note that the amount claimed by him is due to him owing to the occurrence of one or
any of the three conditions, specifying the occurred condition or conditions.
This Guarantee will remain in force up to150 days after the deadline for submission of Bids. Deadline
is stated in the Instructions to Bidders which may be extended by the Employer, notice of which
extension(s) to the Bank is hereby waived. Any demand in respect of this Guarantee should reach the
Bank not later than the above date.
[Signature, name and address]
Signature of Bidder Page 29 AMC
Amdavad Municipal Corporation
BANK GUARANTEE FOR SECURITY DEPOSIT
WHEREAS _______________________________ [name and address of Contractor] (here-in after
Called “the Contractor") has undertaken, in pursuance of Contract No.
Dated ______________________to execute ______________________________ [name of Contract and brief
description of Works] (hereinafter called “the Contract");
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall furnish you with a Bank
Guarantee by a recognized bank for the sum specified therein as security for compliance with his obligations in
accordance with the Contract;
AND WHEREAS we have agreed to give the Contractor such a Bank Guarantee;
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you, on behalf of
the Contractor, up to a total of __________________________________________ [amount of
Guarantee]1 _______________________ [in words], such sum being payable in the types and proportions of
currencies in which the Contract Price is payable, and we undertake to pay you, upon your first written demand
and without cavil or argument, any sum or sums within the limits of
__________________________________[amount of Guarantee] as afore-said without your needing to prove or to
show grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the Contractor before presenting us with the
We further agree that no change or addition to or other modification of the terms of the Contract or of the Works
to be performed there under or of any of the Contract documents which may be made between you and the
Contractor shall in any way release us from any liability under this guarantee, and we hereby waive notice of any
such change, addition or modification.
This guarantee shall be valid until the date of issue of the completion Certificate plus 90 days.
SIGNATURE AND SEAL OF THE GUARANTOR ___________________________
Signature of Bidder Page 30 AMC
Amdavad Municipal Corporation
Signature of Bidder Page 31 AMC
Amdavad Municipal Corporation
Signature of Bidder Page 32 AMC
Amdavad Municipal Corporation
Signature of Bidder Page 33 AMC
Amdavad Municipal Corporation
Section – II : General Conditions of Contract & Special Conditions of Contract
1.0 Definitions
1.1 In the contract (as hereinafter defined) the following words and expressions shall have the meaning hereby
assigned to them, except where the context otherwise requires.
1.2 Terms which are defined in the Contract Data are not also defined in the Conditions of Contract but keep
their defined meanings. Capital initials are used to identify defined terms.
“Commencement Date” means the date on which the Contractor receives from the Engineer the notice to
proceed with works.
“Time for completion” means the time for completing the execution of the works and passing the tests on
completion of the works calculated from the commencement date.
“Contract” means the contract agreement between the Employer and the Contractor to execute, complete
and maintain the Works as described in details in various documents listed in clause 4 of “ The Contract
“Specifications” means the specification of the works included in Contract and/or modifications/alterations
made thereto by Contractor and approved by the Engineer.
“Drawings” means all drawings, calculations and technical information of a like nature provided by the
Engineer to the Contractor.
“Contract Data” means the documents and other information which comprise the Contract.
“Contractor” means a person / corporate body / registered company / consortium of companies whose Bid
to carry out the Works has been accepted by the Employer and the legal successors in title to such person
/ corporate body / registered company / consortium of companies.
“Sub contractor” means any person/corporate body/ registered company/ a consortium of companies to
whom a part of the works have been subcontracted with the consent of the Engineer.
“Contractor's Bid’ means the priced offer to the Employer for the execution of the works and remedying
defects therein in accordance with various terms and conditions set out in the Contract as accepted by “
Letter of Acceptance.”.
Contract Price means the price stated in the Letter of Acceptance and thereafter as adjusted in accordance
with the provisions of the Contract.
“Retention money” means the aggregate of all monies retained by Employer pursuant to clause 48 of these
Conditions of Contract.
“Interim Payment Certificate” means any payment certificate issued by the Engineer other than the final
payment certificate.
“Final Payment Certificate” means the certificate of payment issued by the Engineer pursuant to clause
43.1 gof these Conditions of Contract.
Signature of Bidder Page 34 AMC
Amdavad Municipal Corporation
Days means calendar days; months mean calendar months.
“Defect” means any part of the Works not completed in accordance with the Contract.
“Employer” means The Amdavad Municipal Corporation and is the party who will employ the Contractor to
carry out the Works.
“Engineer” means the person / organisation appointed by the Employer as named in the Contract Data or
as informed to the contractor in writing for the purposes of the contract.. The Contractor is obliged to
accept the Engineer appointed by the Employer.
“Engineer’s Representative” means the person appointed by the Engineer for carrying out such duties and
exercising such authority as delegated to him from time to time by the Engineer with written intimation to
the Employer and the Contractor.
“Equipment” means the Contractor's machinery and vehicles brought temporarily to the Site to construct
“Completion Date” means the date arrived at by counting the Contract period (inclusive of any time
extensions granted by the Engineer from time to time) after the commencement date.
“Plant” means any integral part of the Works, which is to have a mechanical, electrical, electronic or
chemical or biological function.
“Site” means the places provided by the Employer where the works are to be executed and any other
places as may be specifically designated in the contract as forming part of the site.
“Specification” means the Specification of the Works included in the Contract and any modification or
addition made or approved by the Engineer.
“Works” means permanent works and/or temporary works.
“Permanent works” means the permanent works to be executed in accordance with the Contract.
“Temporary Works” are works of every kind in or about the permanent works designed, constructed,
installed, and removed by the Contractor, which are needed for construction or installation of the Works.
“Cost” means all expenditure on or off site properly accounted and incurred or to be incurred including all
“Writing” means all handwritten or typewritten or printed communication including cable, facsimile or e
mail communication.
1.1 Wherever in the contract provision is made for the giving of notice, consent, approval, certificate or
determination by any person such notice consent, approval, certificate or determination by any person
shall be given in writing unless otherwise specified in the contract. Any such consent, approval, certificate
or determination shall not be unreasonably delayed or withheld.
2.0 Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male also means female or neuter,
and the other way around. Headings and marginal notes have no significance. Words have their normal
meaning under the language of the Contract unless specifically defined. All the notices, consents,
approvals, certificates, decisions, determinations to be given under this contract by all the concerned
parties (Employer, Engineer and Contractor) shall be given in writing only.
Signature of Bidder Page 35 AMC
Amdavad Municipal Corporation
2.2 If sectional completion is specified in the Contract Data, The completion date for each section of work is
arrived at by counting the period of completion assigned for that section of work from the date of
commencement assigned to that section of the work.
2.3 The several documents forming the Contract are to be taken as mutually explanatory to one another, but
in case of ambiguities and/or discrepancies the same shall be explained and adjusted by the Engineer who
shall thereupon issue to the contractor instructions thereon and in such event unless otherwise provided in
the contract, the priority of the documents forming the Contract shall be as follows:
(1) The notice inviting bids
(2) The Contract Agreement
(3) The instructions to Bidders
(4) The Letter of Acceptance and notice to proceed with the works
(5) The accepted Contractor’s Bid
(6) The Contract Data
(7) The General Conditions of Contract and special conditions of contract
(8) The Technical Specifications
(9) The Drawings
(10) Any other document listed in the Contract Data as forming part of the Contract.
(11) The Schedule B
(12) Any other document listed in the Contract Data as forming part of the Contract.
(13) Submission made by contractor as per qualification document (Volume-2)
3.0 Language and Law
3.1 The language of the Contract shall be English and the law governing the Contract shall be the Law as
prevailing in India.
3.2 If the Contractor’s authorised representative is not in the opinion of the Engineer, fluent in English, the
Contractor shall have available on site at all times a competent interpreter to ensure the proper
transmission of instructions and information.
4.0 Engineer's Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual matters between the
Employer and the Contractor as specified in the contract.
4.2 Except as expressly stated in the contract, the Engineer shall have no authority to relieve the contractor of
any of his obligations under the contract.
4.3 Engineer shall act impartially while dealing with the contractual matters arising between the Contractor
and the Employer while
Giving decisions, opinion or consent,
expressing his satisfaction or approval,
determining value, or
otherwise taking decisions which may affect the rights and obligations of the Employer or the
4.4 The Contractor shall obtain specific approval from the Employer before carrying out his duties in
accordance with following clauses :
5. Delegation, 7. Subcontracting, 17.5, 17.6 and 17.7Suspension of work,20. Possession of site 30. Extension
of completion date, 41. Valuation of variations, 47. price variation 49. Liquidated damages,54. Taking
Signature of Bidder Page 36 AMC
Amdavad Municipal Corporation
over,57. Termination, 59. Default of Contractor and any other sub clauses that will have cost or time
implications on the Contract.
5.1 Engineer’s Representative (Team Leader in this case) shall be appointed by the Engineer and shall carry
out such duties and exercise such authority as may be delegated to him by the Engineer under sub clause
5.2 from time to time.
5.2 The Engineer may delegate in writing any of his duties and responsibilities to other persons appointed by
the Engineer or the Engineer’s Representative to carry out the duties assigned to him under the contract
(except to the Dispute Review Expert) after notifying the Contractor in writing) and may cancel any
delegation in writing after notifying the Contractor.
6.0 Communications
6.1 A notice shall be effective only when it is delivered (in terms of the Indian Contract Act).
6.2 All communications from Engineer’s Representative shall have the same effect as though given by the
Engineer. The Engineer shall however retain the authority to disapprove any work, materials or Plant in the
event of the Engineer’s Representative failing to do so or revoke the decisions/instructions issued by the
Engineer’s Representative.
6.3 All certificates, notices or instructions to be given to the Contractor by the Employer or the Engineer under
the terms of Contract shall be sent by post, cable, fax, e-mail to or placed at the Contractor’s principal place
of business or such other address as the Contractor shall nominate for that purpose.
6.4 Any notice to be given to Employer or to the Engineer under the terms of the Contract shall be sent by
post, cable, fax or e mail to or left at the respective addresses nominated for that purpose given in contract
6.5 Change of address shall be informed to respective parties well in advance.
7.0 Subcontracting
7.1 The Contractor shall not, without the prior consent of the Employer assign the contract or any part
thereof. The contractor shall not subcontract the whole of the works. Part of the works may be
subcontracted after obtaining Engineers prior consent. Any such consent shall not relieve the Contractor
from any liability or obligation under the contract. The Contractor shall remain responsible for all the acts,
defaults and/or neglect of the contractual requirements and obligations by any Subcontractor
8.0 Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors, public authorities, utilities, and
the Employer as and when required without prejudice to any of his contractual obligations. The Contractor
shall as referred to in the Contract Data, also provide facilities and services for them as described in the
Schedule. The Employer may modify the schedule of other contractors and shall notify the contractor of
any such modification.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel as referred to in
the Bid document to carry out the functions stated in the Schedule or other personnel approved by the
Engineer. The Engineer will approve any proposed replacement of key personnel only if their qualifications,
Signature of Bidder Page 37 AMC
Amdavad Municipal Corporation
abilities, and relevant experience are substantially equal to or better than those of the personnel listed in
9.2 If the Engineer asks the Contractor to remove a person, without assigning reasons thereof, for his
misconduct or inadequacy of technical skills and experience, who is a member of the Contractor’s staff or
his work force, the Contractor shall ensure that the person leaves the Site within seven days and has no
further connection with the work in the Contract.
9.3 No residential accommodation is allowed at the site of work. The labour huts shall not be erected on the
site of work and contractor shall make his own arrangements to provide such accommodations as per the
rules of the local bodies. He shall make his own arrangements for housing, stores, field office etc. He shall
submit a site layout plan indicating the location of various site facilities to be created by him at his cost for
the execution of work. The Owner shall in no way be responsible for any delay on this account and no claim
on this account whatsoever shall be entertained.
9.4 Project Manager shall be of a graduate civil engineer having a minimum five years of experience in similar
nature work. The Project Manager shall always be available at the site during the actual execution of the
work. This is in addition to the number of graduate engineers (of civil and other disciplines as required) who
shall be appointed by contractor to execute all items of work.
10.0 Employer’s and Contractor's Risks
10.1 The Employer carries the risks which this Contract states are Employer’s risks, and the Contractor carries
the risks which this Contract states are Contractor’s risks.
11.0 Employer's Risks
11.1 The Employer is responsible for the excepted risks which are in so far as they directly affect the execution
of the Works, the risks of war, hostilities, invasion, act of foreign enemies, rebellion, revolution,
insurrection or military or usurped power, civil war, or riot, commotion, disorder (unless restricted to the
Contractor’s employees), natural disaster and contamination from any nuclear fuel or nuclear waste or
radioactive toxic explosive. Contractor will execute rectification of damaged portions of work due to such
risks and Employer shall suitably compensate for works in accordance with the terms and conditions of the
12.0 Contractor’s Risks
12.1 All risks of loss or damage to physical property and of personal injury, death which arise during and in
consequence of the performance of the Contract, are the responsibility of the Contractor. Contractor shall
rectify damages to works, loss of materials, property, plant and machinery, life etc. at his own costs
12.2 The contractor shall assume all liability, financial or otherwise in connection with his contract and shall
protect and indemnify the Employer from any and all damages and claims that may arise on any account.
The Contractor shall indemnify the owner against all claims in respect of patent rights, royalties, damages
to adjacent buildings, roads or members of public in course of execution of work or any other reason
whatsoever and shall himself defend all actions arising from such claims and shall keep the Owner saved
harmless and indemnified in all respect from such actions, costs and expenses. The contractor shall be
liable for any loss or damage to the Works occasioned by him in the course of operations carried out by
him. All such damage (except that arising out of excepted risks defined in clause 11.1 above) to works will
be rectified by contractor at his own cost.
Signature of Bidder Page 38 AMC
Amdavad Municipal Corporation
13.1 The Contractor shall provide, in the joint names of the Employer and the Contractor through insurance
cover from the Commencement Date to the end of the Defects Liability Period, in the amounts and
deductibles as stated below and the Contract Data, for the following events which are due to Contactor’s
(a) Personal injury, sickness, disease or death
i) Of Contactor’s personnel. ( i.e. Workmen’s Compensation Policy/ in accordance with the
statutory requirements applicable in India );
ii) Of Employer’s Personnel & other people, except that this insurance may exclude losses and
claims to the extent that they may arise from any act or neglect of the Employer’s Personnel
or other people Rs. 10 lakh per occurrence
13.2 Policies and certificates for insurance shall be delivered by the Contractor to the Engineer for the
Engineer’s approval before the Commencement Date. All such insurance policies shall provide for
compensation to be payable in the types and proportions of currencies required to rectify the loss or
damage incurred.
13.3 No work (Temporary or Permanent) shall be permitted at site in absence of proper insurance policies and
up to date payment of premiums.
13.4 The responsibility of any amounts not insured or not recovered from the Insurer shall be borne by the
Employer or the Contractor in accordance with their responsibilities as defined in these clauses.
13.5 The Employer shall indemnify the Contractor against all proceedings, claims, damages, costs, charges,
expenses in respect of the matters for which the Employer is responsible.
13.6 The insurance policy shall include a cross liability clause such that the insurance shall apply to the
Contractor and the Employer as separate insured.
13.7 The minimum amount of insurance shall be as specified in these clauses and the Contract Data. In the
event of mismatch insurance shall be for higher amount.
13.8 The Contractor shall keep notified the Insurer of changes in the nature, extent or programme for the
execution of the Works and ensure the adequacy of the insurances at all the times in accordance with the
Terms of the Contract.
14.0 Site Visit
14.1 The bidder is advised to inspect and examine the site and its surroundings and satisfy himself with the
nature and extent of site and work, the hydrological and climatic conditions the means of access to the site,
the constraints of space for stacking material/machinery, labour etc. he requires, if any, weather conditions
at site, general conditions, utilities, etc. or any other circumstances which may affect or influence their bid.
No claim, whatsoever, shall be entertained from the bidder, on the plea that the information supplied by
the Owner Is insufficient or is at variance to the actual site conditions.
14.1.1 Deleted.
15.0 Queries about the Contract Data and Contract agreement
15.1 The Employer / Engineer will clarify queries on the Contract Data. These clarifications shall form a part of
the Contract and shall be binding on both the Employer and the Contractor.
15.2 The Contractor shall enter into and execute the contract agreement to be prepared at the cost of the
Employer in the form given in the instructions to bidders.
Signature of Bidder Page 39 AMC
Amdavad Municipal Corporation
16.0 Contractor to Construct the Works
16.1 The Contractor shall with due care and diligence design (to the extent as provided for in the contract),
execute and complete the works and remedy the defects if any in accordance with the provisions of the
contract, detailed design and drawing for permanent works shall be made available by AMC.
16.2 Contractor shall provide all superintendence, labour, materials, plant, contractor’s equipment and all other
things as may be required to design, execute, complete and maintain during defects liability period the
works. (refer clause 16.1 above).
16.3 Any defect, error, omission, fault shall be immediately brought to the notice of the Engineer before or
during the execution of the works.
16.4 The Contractor shall take full responsibility for the adequacy, stability, safety of all site operations and
methods of construction. Contractor shall not be responsible for the design and specifications of the
Permanent Works not designed by him.
16.5 The Contractor shall be responsible for:
The accurate setting out of the Works in relation to original lines, levels and points of reference given
by the Engineer in writing.
The correctness of all positions, levels, dimensions and alignment of all parts of the Works, and
The provision of all necessary instruments, appliances and labour in connection with the foregoing
responsibilities.
Contractor shall rectify all errors during execution of works at his cost except for the errors that occur
due to supply of incorrect drawings or instructions by the Engineer.
16.6 The checking and approval by the Engineer of any alignments, levels and setting out shall not relieve the
Contractor of his responsibility for accuracy thereof.
16.7 The Contractor shall provide and maintain a site office with toilet facility for the Engineer and his staffs for
the complete duration of the contract at no cost to the Employer.
17.0 The Works to Be Completed by the Completion Date
17.1 The Contractor may commence execution of the Works on the Commencement Date and shall carry out
the Works in accordance with the programme submitted by the Contractor, as updated with the approval
of the Engineer, and complete them by the Completion Date.
17.2 The Employer shall in no way be responsible for either any delay in getting electric and/or water
connections for carrying out the work and no claim whatsoever on this account shall be entertained from
the contractor. Also contingency arrangement of standby water & electric supply shall be made by the
contractor for smooth progress of the work on account of power failure or disconnection for any reason
whatsoever it may be. No claim of any kind whatsoever shall be entertained on this account from the
contractor. Nothing extra shall be payable on this account.
17.3 The Contractor shall provide necessary superintendence matching with working hours. However, there
shall be no hindrance to the traffic. Contractor cannot claim for any extra payment in case there is no work
front available due to traffic.
17.4 The Contractor shall afford every facility for and every assistance in obtaining the right to access for the
Engineer or any of his representative at all reasonable times to the Site and to all workshops, places where
materials or plant are being manufactured, fabricated or prepared. If materials, plant or parts of works are
manufactured, fabricated or prepared in places not belonging to the Contractor, the Contractor shall
Signature of Bidder Page 40 AMC
Amdavad Municipal Corporation
organise necessary permissions from the owners of such facilities for the Engineer to inspect such where
materials or plant.
17.5 Suspension of work
The Contractor shall, on the instructions of the Engineer, suspend the progress of the works or part thereof
for such time and in such manner as the Engineer may consider necessary and shall, during such
suspension, properly protect and secure the works or any part thereof so far as is necessary in the opinion
of the Engineer. Unless such a suspension is :
i. otherwise provided in the contract,
ii. necessary by reason of some default or breach of contract by the Contractor or for which he is
iii. necessary by reason of climatic conditions on site or
iv. necessary for the proper execution of the work or for safety of the works or any part thereof,
following sub clause shall apply.
17.6 Effect of suspension.
With reference to clause 17.5 the Engineer shall after due consultations with the Employer and the
Contractor determine
a. The time effect of such suspension on the contract period and
b. The cost effect of such suspension on the Contract Price.
and shall notify the Contractor with a copy to the Employer.
Approval by the Engineer
17.7 The Contractor shall submit Specifications and Drawings showing the proposed Temporary Works to the
Engineer, who shall approve them if they comply with the Specifications and Drawings.
17.8 The Contractor shall be responsible for design of Temporary Works. Design of the temporary works shall
be got proof checked from the agency approved by AMC and the cost of the same shall be borne by the
17.9 The Engineer's approval shall not alter the Contractor's responsibility for design of the Temporary Works.
17.10 All Drawings prepared by the Contractor for the execution of the temporary or Permanent Works, are
subject to prior approval by the Engineer before their use.
18.1 The Contractor shall have full regard throughout execution, completion and defects liability period to
following safety aspects and shall take all necessary steps to ensure that danger to safety is avoided all the
time in respect of
a. Safety of the works
b. Safety of the Contractor’s employees and all the persons directly or indirectly engaged by him for the
c. Safety of all the employees including persons working on other contracts of Employer at the same site
of the Employer and Engineers employees engaged at work site.
d. Any authorised third-party persons on the site.
e. Contractor’s plant and equipment
Signature of Bidder Page 41 AMC
Amdavad Municipal Corporation
18.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing, warning signs, watching
when and where necessary or required by Engineer or by any duly constituted authority for the protection
of the works or for the safety and convenience of the public or others.
18.3 The Contractor shall take all reasonable steps to protect the environment on and off the site and avoid
damage or nuisance to persons or property of the public and others arising as a consequence of his method
18.4 The Contractor shall maintain in good condition all work throughout execution, completion and defects
liability period. The contractor shall be responsible for and to make good all injuries, damages and repairs,
rendered necessary by fire, rain, traffic, floods or other causes.
18.5 All the scaffolding work, wherever required for the execution of work, shall be provided by the contractor.
Nothing extra shall be payable on this account. It shall be provided strictly with double scaffolding system
with all the accessories etc. with adjustable suitable working platforms to access the areas, with ease for
working and inspection. It shall be designed to take all incidental loads. It should cater to the safety
features for workmen. It shall be ensured that no damage is caused to any structure due to scaffolding.
18.6 All temporary warning/ caution boards display such as “Construction Work in progress”, “Keep Away", “No
parking”, “Speed limit”, Diversion”, etc. shall be provided and displayed during day as well as night time by
the contractor, wherever required and as directed by the Engineer. A signboard with project description,
Name of client, Name of design consultant and Name of TPI /PMC consultant, etc. should be displayed at
proper locations as directed by the Engineer.
18.7 Arrangement of temporary water and electricity and telephone connection required, by him, shall be
made by the Contractor at his own cost and also necessary permissions directly from relevant Owners shall
be obtained by him under intimation to the Owner. Also all initial and running charges and security deposit,
if any in this regard shall be borne by him. The Contractor shall abide by all the rules/ bye laws applicable in
this regard and he shall be solely responsible for any penalty on account of violation of any of the rules and
byelaws in this regard.
18.7.1 The Contractor shall be responsible for maintenance and watch and ward of the complete installation and
shall also be responsible for any pilferage, theft, damage, penalty etc. in this regard. The Contractor shall
indemnify the Owner against any claim arising out of pilferage / theft, damage, penalty etc. whatsoever on
this account. Security deposit for the work shall be released only after the clearance is obtained from the
local authorities from whom temporary electric/ water I telephone connection have been obtained by the
contractor and also as per AMC's latest circular.
18.8 The Contractor shall depute Site Engineer & skilled workers as required for the work. Necessary protective
and safety equipments shall be provided to them by the Contractor at his own cost and used at site.
18.9 Security & Traffic Arrangements
In event of any restriction being imposed by the Security Staff of Owner, Amdavad Municipal Corporation
traffic or any other local governing body having control over the project, on the working or movement of
labour, materials, the Contractor shall strictly follow all such restrictions or instructions issued regarding
the same and nothing extra shall be payable to the Contractor on account of such restrictions or
instructions. In case of loss of time on this account if any, shall have to be made up by generating additional
General security restrictions are given as under:
i. The movement of trucks and vehicles shall be regulated in accordance with rules and regulations as
approved by competent authorities.
ii. The Contractor shall inform in advance, if required, the truck registration numbers ownership of the
Signature of Bidder Page 42 AMC
Amdavad Municipal Corporation
trucks, names and addresses of the drivers for necessary action by the security agency.
iii. As and when there will be security requirements, certain additional restrictions can be imposed as per
the requirement of the situation.
iv. No claim whatsoever will be entertained by the Owner on account of any restriction that can be
imposed as per the requirement of the situation.
18.10 No inflammable materials including P.O.L. shall be allowed to be stored in huge quantity at site. However,
reasonable quantity may be permitted for storage, subject to the compliance of all rules & instructions
issued by the relevant authorities and as per the direction of Engineer -in- Charge in this regard.
18.11 The Contractor shall save harmless and indemnify the Employer in respect of all claims, proceedings,
damages, costs, charges and expenses whatsoever arising out of, or in relation to, any such matters in so
far as the Contractor is responsible thereof.
18.12 Movement and diversion of traffic during construction.
18.13 Contractor shall be fully responsible for any person’s injury or death which arise during and in
consequence of the performance of the contract. Employer, Engineer, Engineer’s representative shall not
be responsible for the same.
19.0 Discoveries
19.1 Anything of geological or archaeological or other interest or articles of value or antiquity discovered on the
Site shall be the absolute property of the Employer. The Contractor is to notify the Engineer of such
discoveries and carry out the Engineer's instructions for dealing with them without damages, thefts etc. In
carrying out the Engineers instructions to dealing with such articles if the Contractor incurs extra costs or
suffers delays, the Engineer shall determine after due consultation with the Employer and the Contractor
amounts of such costs and extension of time in accordance with the corresponding clauses of the contract.
20.0 Possession of the Site
20.1 The Contractor shall commence the work as soon as is reasonably possible on receipt of the
“Commencement of Work Notice” from the Engineer.
20.2 The Employer shall give possession of part / parts of the Site to the Contractor from time to time.
20.3 Access to site shall also be provided by the Employer to the Contractor in order and manner as set out in
the contract to enable the Contractor to commence and proceed with the works in accordance with his
construction programme and method of construction.
20.4 The site of work shall be always kept clean. The excavated material shall be disposed off as directed by the
Engineer, from the premises and all necessary permissions in this regard from the local bodies shall be
obtained by the contractor. Nothing extra shall be payable on this account.
21.0 Access to the Site
21.1 The Contractor shall allow the Engineer and any person authorized by the Engineer access to the Site, to
any place where work in connection with the Contract is being carried out or is intended to be carried out
and to any place where materials or plant are being manufactured / fabricated / assembled for the works.
22.0 Instructions
22.1 The Contractor shall, unless it is legally or physically impossible, execute and complete the works and
remedy defects therein in strict accordance with the contract to the satisfaction of the Engineer. The
Signature of Bidder Page 43 AMC
Amdavad Municipal Corporation
Contractor shall comply and adhere to the Engineer’s instructions on any matter, whether mentioned in
the contract or not, concerning the works. The Contractor shall take instructions only from the Engineer (or
his delegates).
23.0 Settlement of Disputes:
23.1 If a dispute of any kind whatsoever arises between the Employer and the Contractor in connection with, or
arising out of the Contract or the execution of the Works, whether during the execution of the Works or
after their completion and whether before or after repudiation or after termination of the Contract,
including any disagreement by either party with any action, inaction, opinion, instruction, determination,
certificate or valuation of the Engineer or any person authorized by the Engineer , the matter in dispute
shall, in the first place be referred to the Disputes Review Board [DRB] established pursuant to Appendix
hereto in case of contracts valuing Rs. 10 crores and above, and for contracts valuing less than Rs.
crores, the disputes will firstly be settled by the Conciliator, failing which any party may invoke arbitration
Unless the Contract has already been repudiated or terminated or frustrated the Contractor shall in every
case, continue to proceed with the Works with all due diligence and the Contractor and the Employer shall
give effect forthwith to every decision of the Engineer or any person authorized by the Engineer unless and
until the same shall be revised, as hereinafter provided, by the Conciliator or in a Dispute Review Board
Recommendation / Arbitral Award.
23.2 Decision by Conciliator
i) The Conciliator shall give a decision in writing within 28 days of receipt of a notification of a dispute.
ii) Conciliator shall be paid daily at the rate specified in the Contract Data together with reimbursable
expenses of the types specified in the Contract Data and the cost shall be divided equally between the
Employer and the Contractor, whatever decision is reached by the conciliator. Either party may refer a
decision of the conciliator within 28 days of the conciliator’s written decision. If neither party refers
the disputes to arbitration within 28 days, the conciliator’s decision will be final and binding.
23.3 Arbitration
Any dispute in respect of in respect of contracts where party is dissatisfied by the Conciliator’s decision,
shall be decided by arbitration as set forth below:
i) A dispute with Contractor shall be finally settled by arbitration in accordance with the Indian Arbitration
and Conciliation Act, 1996, or any statutory amendment thereof. The arbitral tribunal shall consist of
arbitrators, one each to be appointed by the Employer and the Contractor, and the third to be appointed
by the mutual consent of both the arbitrators, failing which by making a reference to CIDC-SIAC
Arbitration Centre from their panel.
ii) Neither party shall be limited in the proceedings before such arbitrators to the evidence or arguments
already put before the Engineer or any person authorized by the Engineer or the Board, as the case may
be, for the purpose of obtaining said recommendations/decision. No such recommendations/decision
shall disqualify the Engineer or any person authorized by the Engineer, as the case may be, from being
called as a witness and giving evidence before the arbitrators or any matter whatsoever relevant to the
iii) The reference to arbitration shall proceed notwithstanding that the works shall not then be or be alleged to
be complete, provided always that the obligations of the Employer, the Engineer or any person authorized
by the Engineer and the Contractor shall not be altered by reason of the arbitration being conducted
during the progress of the works. Neither party shall be entitled to suspend the works to which the
dispute relates, and payment to the Contractor shall be continued to be made as provided by the
Signature of Bidder Page 44 AMC
Amdavad Municipal Corporation
iv) If one of the parties fail to appoint its arbitrators in pursuance of sub clause [i], within 14 days after receipt
of the notice of the appointment of its arbitrator by the other party, then President/Chairman of the
nominated Institution shall appoint arbitrator within 14 days of the receipt of the request by the
nominated institution. A certified copy of the President’s/ Chairman’s order, making such an appointment
shall be furnished to both the parties.
v) Arbitration proceedings shall be held at ……………………………., and the language of the arbitration
proceedings and that of all documents and communications between the parties shall be “English‟.
vi) The Arbitration shall be conducted by the experts from the panel of CIDCSIAC Arbitration Centre.
vii) The decision of the majority of arbitrators shall be final and binding upon both parties. The expenses of the
arbitrators as determined by the arbitrators shall be shared equally by the Employer and the Contractor.
However, the expenses incurred by each party in connection with the preparation, presentation, etc. of its
case prior to, during and after the arbitration proceedings shall be borne by each party itself.
viii) All arbitration awards shall be in writing and shall state the reasons for the award.
ix) Performance under the contract shall continue during the arbitration proceedings and payments due to the
contractor by the Employer shall not be withheld, unless they are subject matter of the arbitration
23.4 The several documents forming the Contract are integral parts of the Contract and the requirements
occurring in one is binding as through occurring in all. In the event of any discrepancy in the several
documents forming the Contract or in any other documents, the following order of precedence shall be
(a) For Item Description
i Schedule-B of the Tender form /BOQ
ii Technical Specifications of items
In case of incomplete description or ambiguity, the Engineer-in-charge is entitled to issue further
instructions directing in what manner the work is to be carried out. The Contractor cannot take any
advantage of any apparent error or omission in drawings or specifications and the Engineer-in-charge shall
be entitled to make corrections and interpretations as necessary to fulfill the plans and specifications.
24.0 Avoidance to damage of roads. :
24.1 The Contractor shall ensure that no damage to roads and bridges on the route to the sites occurs due to
him or his subcontractor’s traffic. He shall ensure minimum possible hindrance to the traffic movements on
public roads and bridges due to his materials, plant, temporary works etc. No materials shall be stacked on
public roads and thoroughfares. To reinstate the road damaged/dug/excavated during construction within
a period of 3 days on completion of activity to its original condition.
25.0 Transport of Contractor’s equipment :
25.1 The Contractor shall specifically notify the Employer and the Engineer in case he plans to transport
materials, equipment, plant etc. which might induce such loads on roads and bridges en route to site for
which the roads and bridges are not designed. In every such case the Contractor shall carry out all such
strengthening works as may be necessary to ensure the safety of the roads/ bridges. All such works should
be approved by the Engineer in writing. The Contractor, despite the strengthening measures and written
Signature of Bidder Page 45 AMC
Amdavad Municipal Corporation
approval by the Engineer, shall be responsible for the safety of the roads and bridges as well as his own
plant, materials and equipments.
26.0 Opportunities and Facilities for other Contractors :
The Contractor shall afford all reasonable opportunities to
a. any other contractor and his workmen engaged by the Employer
b. the Workmen of the Employer
c. Workmen of any other agency permitted by the Employer to work in or around the site of works.
d. Make available any roads or ways for the maintenance of which the Contractor is responsible.
e. Permit the use of any temporary works or Contractors Equipment on site. (to be charged wherever
f. Provide any other services of whatsoever nature (to be chargeable wherever applicable.)
27.0 Contractor to keep site clean:
27.1 During the execution of the work, the Contractor shall keep the site clean. All wreckage rubbish, excess
materials, temporary works no longer required will be removed from site immediately.
28.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus materials, rubbish,
temporary works of every kind, except those Contractors equipment, surplus materials, rubbish, temporary
works that may be required by him during the Defects Liability period and leave the site clean and in a
workmanlike condition to the satisfaction of the Engineer on issue of the Taking Over Certificate.
Signature of Bidder Page 46 AMC
Amdavad Municipal Corporation
B. Time Control
29.1 The Contractor should plan the work to be executed round the clock without violating labour and
environmental control norms specified by the governing bodies (National, State and local) without
disturbing and stopping normal traffic.
29.2 Within the time stated in the Contract Data the Contractor shall submit to the Engineer for his consent a
Programme showing the general methods of construction, arrangements, order, and timing and sequence
for all the activities including traffic diversion, resource schedules including material, manpower and
machinery and equipment scheduling monthly cash flow forecast and any other details the Engineer may
29.3 If at any time it should appear to the Engineer that the actual progress of works does not confirm to the
programme to which consent has been given as per clause 29.2 above, the Contractor shall produce, at the
request of the Engineer, a revised programme showing modifications to the programme consented to
under clause 29.2 above necessary to ensure completion of works within the Time for Completion.
29.4 If the Contractor fails to submit such a revised programme, the Engineer may withhold the amount stated
in the Contract Data from the next payment certificate and continue to withhold this amount in all future
payments until the date on which the revised Program is submitted.
29.5 The Engineer's consent to the Program shall not relieve the Contractor from his duties and responsibilities
under the contract.
29.6 The Engineer shall monitor the rate of progress of work. In case the Engineer finds that the rate of
progress of work is too slow to comply with the Time for completion, he shall notify the Contractor who
shall thereupon take necessary steps to expedite progress. No extra payments on account of such actions
shall be due to the Contractor.
30.0 Time for completion and Extension/s of Time for completion
30.1 The whole of the works, and if applicable any section of the works required to be completed within a
particular time as stated in the Contract data, shall be completed within the stipulated time for the whole
of the works or the Section (as the case may be) calculated from the Commencement Date, or such
extended time as may be allowed under following sub clauses.
30.2 The Engineer shall, after due consultation with the Employer and Contractor, determine the amount of
extension of time for completion to which the Contractor becomes fairly entitled in the event of
i. Amount and nature of extra work
ii. Any cause of delay referred to in these conditions
iii. Exceptionally adverse climatic conditions
iv. Any delay, impediment or prevention by the Employer
v. Other special circumstances which may occur, other than through a default or breach of contract by
The Engineer shall notify the Contractor about all such extension of time with a copy to the Employer.
30.3 The Engineer shall however not be bound to make any determination unless the Contractor
a. has notified the Engineer within 28 days of occurrence of event
Signature of Bidder Page 47 AMC
Amdavad Municipal Corporation
b. Has furnished detailed particulars of the extension of time arising out of such an event within 28 days
of the issue of notice of occurrence of the event.
31.0 Delays Ordered by the Engineer
31.1 The Engineer may instruct the Contractor to delay the start or progress of any activity within the Works.
These delays shall be suitably compensated for time in accordance with the provisions of the Contract and
no compensation for cost shall be payable to the contractor on this account.
32.0 Management Meetings
32.1 Either the Engineer or the Contractor may require the other to attend a management meeting. The
business of a management meeting shall be to review the plans for remaining work and to deal with
matters raised in accordance with the early warning procedure.
32.2 The Engineer shall record the business of management meetings and is to provide copies of his record to
those attending the meeting and to the Employer. The responsibility of the parties for actions to be taken is
to be decided by the Engineer either at the management meeting or after the management meeting and
stated in writing to all who attended the meeting.
33.0 Early Warning
33.1 The Contractor is to warn the Engineer at the earliest opportunity of specific likely future events or
circumstances that may adversely affect the quality of the work, increase the Contract Price, or delay the
execution of works. The Engineer may require the Contractor to provide an estimate of the expected effect
of the future event or circumstance on the Contract Price and Completion Date. The estimate is to be
provided by the Contractor as soon as reasonably possible.
33.2 The Contractor shall cooperate with the Engineer in making and considering proposals for how the effect
of such an event or circumstance can be avoided or reduced by anyone involved in the work and in carrying
out any resulting instruction of the Engineer.
34.0 Drawings and contract documents :
34.1 The drawings shall remain in the sole custody of the Engineer, but two copies thereof shall be provided to
the Contractor free of cost. The Contractor can avail a soft copy from the Engineer for making further
copies at his cost. Drawings can be provided by the Employer or his representative to the contractor
through e-mail. All the contractual documents and drawings shall not be given to a third party or used for
any other purpose than contractual work. On receipt of the Defects Liability Certificate, the Contractor shall
return all the drawings and the Contract documents including the drawings to the Engineer.
Four hard copies and two soft copies of the drawings, specifications and other documents (submitted by
the Contractor and approved by the Engineer for all temporary and permanent works in accordance with
the contract requirements)shall be submitted by the Contractor to the Engineer, free of cost.
a. Disruption of progress: The Contractor shall give notice to the Engineer with a copy to the Employer,
whenever planning or execution of the Works is likely to be delayed or disrupted unless any further
drawing or instruction is issued by the Engineer within a reasonable time. The notice shall include
details of the drawing or instruction required and of why and by when it is required and of any delay or
disruption likely to be suffered if it is late.
b. Delays and Cost of Delay of Drawings: If by reason of any failure or inability of the Engineer to issue,
within a time reasonable in all circumstances, any drawing or instruction for which the Contractor has
Signature of Bidder Page 48 AMC
Amdavad Municipal Corporation
given a notice in accordance with clause 33, the Contractor suffers delay and/or incurs cost then the
Engineer shall, after due consultation with the Employer and the Contractor, determine:
c. Any extension of time to which the Contractor is entitled.
d. Negative time and cost effects shall be calculated by the Engineer and deducted from the Contract
Sum in the event of delays in issue of drawings arise out of Contractors failures or delays in submission
of drawings of temporary works.
34.2 Supplementary drawings and instructions: The Engineer shall have authority to issue supplementary
drawings and instructions to the Contractor. The Contractor shall carry out and be bound by the same.
Signature of Bidder Page 49 AMC
Amdavad Municipal Corporation
C. Quality Control
35.0 Quality of Materials, Plant and Workmanship
35.1 All materials, plant and workmanship shall be:
a. Of the respective kinds and quality as described in the contract and in accordance with the Engineers
instructions and subject to tests as the Engineer may require at any or all places, such as manufacturers
facility, site, during fabrication, preparation etc, as specified in the contract.
b. The Contractor shall provide all assistance required by Engineer for carrying out the tests. Costs of tests
are covered by the contractor’s quoted rates for the works.
c. All samples shall be provided by the Contractor free of costs.
35.2 The Engineer and his personnel shall have access to all locations of work all the time for inspection of
work. Contractor shall provide all necessary assistance to the Engineer and his personnel for this at no extra
35.3 On inspection, if the Engineer finds that certain works, materials and/or plant are defective and/or not in
accordance with the Contract, he shall notify the Contractor thereof immediately with his objections and
reasons. The Contractor shall then promptly make good the defect or remove defective materials, plant
35.4 All work or any part of shall be covered up only after approval of the Engineer in respect of the quality of
materials used and workmanship.
35.5 The Contractor shall uncover any part of the work or make openings in or through as required by Engineer
from time to time for inspection and shall make good such part only after approval of the Engineer to such
covered up work.
35.6 In case of default on the part of the Contractor in removal and making good of any defective materials,
workmanship and/or plant, the Employer shall engage another agency to carry out the same at the
Contractors risks and costs.
a. If the Engineer instructs the Contractor to carry out a test not specified in the Specification to check
whether any work has any Defect or not, Contractor shall perform the same and submit the results to
the Engineer at contractor’s cost.(MTC certificate require for colour material)
37.0 Correction of Defects during Defects liability period
a. The Engineer shall give notice to the Contractor of any Defects before the end of the Defects Liability
Period, which begins at Completion and is defined in the Contract Data. The Defects Liability Period
shall be extended for as long as Defects remain to be corrected.
b. Every time notice of a Defect is given, the Contractor shall correct the notified Defect within the length
of time specified by the Engineer’s notice.
Signature of Bidder Page 50 AMC
Amdavad Municipal Corporation
38.0 Uncorrected Defects during Defects liability period
38.1.1 a) If the Contractor does not rectify or correct a defect within the time specified in the Engineer’s notice,
the Engineer will assess the cost of having the Defect corrected, and the Contractor will bear the costs
of such defective work as well as all works carried out over such defective work until the defect is
removed to the satisfaction of the Engineer.
b) Only the Defects Liability Certificate referred to in following clause shall be deemed to constitute the
approval of the works.
c) Defects Liability Certificate: The Defects liability certificate shall be given by the Engineer to the
Employer, with a copy to the Contractor, within 28 days of the expiry of the Defects Liability Period.
The Contract shall remain incomplete until issue of the Defects Liability Certificate.
38.2 The defects Liability Certificate shall mention clearly that the Contractor has completed his obligations to
execute and complete the works and remedy defects therein to the satisfaction of the Engineer.
38.3 Unfulfilled obligations: Despite issuance of the Defects Liability Certificate, the contract between the
Employer and the Contractor shall remain in force in respect of unperformed obligations incurred under
the provisions of the Contract prior to the issue of the Defects Liability Certificate.
Signature of Bidder Page 51 AMC
Amdavad Municipal Corporation
D. Cost Control
39.0 Schedule - B
a. The schedule-B shall contain Memorandum showing items for the construction, installation, testing,
and commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor shall be paid only
quantities calculated after taking measurements of executed work. The rate stated in the schedule B
for each item of work shall apply. The works shall be measured by the Contractor jointly with the
authorised representative of the Engineer and all particulars required by the representative of the
Engineer shall be supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working space etc. is to be
40.0 Variations
40.1 The Engineer shall make any variation of form, quality or quantity of the Works or any part thereof that
may, in his opinion, be necessary and for that purpose, or if for any other reason it shall, in his opinion, be
appropriate, he shall have the authority to instruct the Contractor to do and the Contractor shall do any of
Increase or decrease the quantity of any work up to any extent included in the contract,
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
No such variation shall in any way vitiate or invalidate the contract, but the effects, if any, of all such
variations shall be valued in accordance with the following sub clauses. Provided that where the issue of an
instruction to vary the Works is necessitated by some default or breach of contract by contractor or for
which he is responsible, any additional cost attributable to such default shall be borne by the Contractor.
40.2 The Contractor shall not make any such variation without an instruction of the Engineer. No instruction is
required for quantities varying from those provided for the items in the contract schedule B.
41.0 Valuation of Variations
a. The basis for the valuation of variations for addition to the Contract Price shall be as follows in the
same order of priority.
b. Contract unit rates for individual items shall apply to varied quantities where there is a quantity
c. In case of other non tender items following procedure shall apply.
If any extra item crops up during the progress of work the same shall be carried out by the Contractor
and he shall be paid at the rate fixed by Employer which shall be fixed as lowest of the rates derived by
rate analysis based on the following three methods.
(i) Rate analysis based on approved BOQ item rates or Govt. SOR 2021-22 (Without GST) plus or
minus contractor’s tender premium or rebate as the case may be.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and equipment,
the cost of all temporary and incidental works, the overheads and the Contractors profit.
Signature of Bidder Page 52 AMC
Amdavad Municipal Corporation
The overheads shall be taken at 5 % of the sum of material costs, the labour costs, the cost
of use of all plant, machinery and equipment, the cost of all temporary and incidental
The Contractors profit shall be taken at 10 % of the sum of material costs, the labour costs,
the cost of use of all plant, machinery and equipment, the cost of all temporary and
incidental works, the overheads.
d. In the event of disagreement, the Engineer shall fix such rates and prices as are, in his opinion
appropriate and shall notify the Contractor accordingly with a copy to the Employer.
e. The Engineer shall determine provisional rates and prices to enable on account payments to be
included in the Interim Payment Certificates, until rates and prices are agreed as final by the Employer,
the Contractor and the Engineer.
f. The Contractor shall not be entitled to additional payment for costs, which could have been avoided by
giving early warning.
42.0 Cash flow forecasts
a. The Contractor shall, within 90 days of the date of the work order / notice to proceed provide to the
Engineer for his information a detailed cash flow estimate, in quarterly periods, of all payments to
which the Contractor will be entitled under the Contract.
b. The estimates shall be revised and submitted by the Contractor every quarter of each year if need
arises due to various reasons.
43.0 Payment Certificates
43.1 The Contractor shall submit to the Engineer a monthly statement after the end of each calendar month in
three hard copies and three soft copies on CDs each signed by the Contractors authorised Representative in
such form as the Engineer may prescribe from time to time. The Monthly Statement shall state
The amount to which the Contractor is entitled.
The value of the permanent works executed.
Other sums such as secured advance payments, day works payments, price escalation payments, and
mobilisation advance.
Any other sums to which the Contractor may consider himself entitled.
a. The Engineer shall check the Contractor's monthly statement within 14 days and certify for payment
vide an Interim Payment Certificate the amount to be paid to the Contractor after taking into account
any credit or debit for the month a) in respect of materials for the works in the relevant amounts and
b) under various conditions set forth in these Conditions of Contract and stated in brief in the Contract
b. No payment shall be recommended by the Engineer through Interim Payment Certificate until he is
fully satisfied that
The Contractor has paid the Security deposit to the Employer.
All premiums towards the various insurance policies taken by the Contractor in accordance with these
General Conditions of Contract are paid.
Contractor has obtained the labour licences and PF code numbers for site staffs and workers.
Signature of Bidder Page 53 AMC
Amdavad Municipal Corporation
c. The Engineer may by any Interim Payment Certificate or in any subsequent Interim Payment Certificate
make any correction or modification in any previous Interim Payment Certificate which shall have been
issued by him and shall have authority, if any work is not carried out to his satisfaction, to omit or
reduce the value of such work in any Interim Payment Certificate.
d. Statement at Completion: No later than 84 days after the issue of the Taking Over Certificate in respect
of the whole of the Works, the Contractor shall submit 2 hard copies and 3 soft copies in the form of
CDs to the Engineer of a Statement at Completion with supporting documents (such as measurements,
approvals, records related to materials, test data etc.) showing in details, in the form approved by the
The final value of all work done in accordance with the Contract up to date stated in the Taking
Over Certificate
Any further sums to which the Contractor considers himself due.
Any other amounts, which the Contractor considers, will become due to him under the contract to
be shown in a separate statement.
The Engineer shall issue a Certificate of Payment after scrutiny in a similar manner as that for the
Monthly Statements as described in clause 43.1a above.
e. Final Statement: The Contractor shall submit to the Engineer within 56 days of the issue of Defects
liability Certificate pursuant to clause. 38.1b, in two hard copies and three soft copies in the form of
CDs, a draft Final Statement with supporting documents (such as measurements, approvals, records
related to materials, test data etc.) showing in details, in the form approved by the Engineer
i. The value of all work done in accordance with contract including variations
ii. Any further sums which contractor considers to be due to him under the contract or otherwise.
If the Engineer disagrees with or cannot verify any part of the draft final statement, the Contractor shall
submit such further information as the Engineer may reasonably require and shall make such changes
in the draft as may be agreed between them. The Contractor shall then prepare and submit to the
Engineer the Final Statement as agreed.
If a dispute exists between the Engineer and the Contractor for any part of the draft final statement,
such part shall be dealt with in accordance with the procedure laid down in clause 23 of these
Conditions of Contract. The Engineer shall deliver to the Employer an Interim Payment Certificate for
the agreed parts of the draft final statement.
f. Discharge: Upon submission of the Final Statement, the Contractor shall give to the Employer with a
copy to the Engineer, a written discharge confirming that the total of the Final Statement represents
full and final settlement of all monies due to the Contractor arising out of or in respect of the Contract.
Such discharge shall become effective after.
Payment is made against Final Payment Certificate.
Performance Security amount / bank guarantee is returned to the Contractor.
g. Final Payment Certificate: The Engineer shall issue the final payment certificate to the Employer with a
copy to the Contractor within 28 days after receipt of the final statement and the written discharge.
The certificate will state:
i) The amount which, in the opinion of the Engineer, is finally due under the Contractor or
Signature of Bidder Page 54 AMC
Amdavad Municipal Corporation
iii) After giving the credit to the Employer for all amounts previously paid by the Employer and for
all sums to which the Employer is entitled in accordance with clause 49 (Liquidated damages)
of these Conditions of the Contract, the balance if any due from the Employer to the Contractor
or vice versa as the case may be.
h. Payment of intermediate certificate to be regarded as advance: No payment shall be made for any
work, estimated to cost less than rupees one thousand till after the whole of the said work shall have
been completed and a certificate of completion given. But in the case of works estimated to cost more
than rupees one thousand, the Contractor shall, on submitting a monthly bill therefore, be entitled to
receive payment proportionate to the part of the work then approved and passed by the Engineer-in-
Charge, whose certificate of such approval and passing of the sum so payable shall be final and
conclusive against the Contractor. All such intermediate payments shall be regarded as payments by
way of advance against the final payments only and not as payments for work actually done and
completed and shall not preclude the Engineer-in-Charge from requiring bad, unsound, imperfect or
unskilled work to be removed and taken away and reconstructed, or re-erected, nor shall any such
payment be considered as an admission of the due performance of the contract or any part thereof in
any respect or the occurring of any claims not shall it conclude, determine or affect in any way the
power of the Engineer-in-charge as to the final settlement and adjustment of the accounts of otherwise
or in other way very or affect the contractor.
43.2 Cessation of Employers liability: The Employer shall not be liable to the Contractor for any matter or thing
arising out of or in connection with the Contract or execution of the Works, unless the Contractor shall
have included a claim in respect thereof in his Final Statement and in the Statement of Completion
44.1 Payments shall be adjusted for deductions for advance payments, retention, other recoveries in terms of
the contract and taxes at source, as applicable under the law. The Employer shall pay the Contractor the
amounts certified by the Engineer
within 28 days of the date of issue of the Certificate of bill
within 56 days of the date of the final payment certificate
No payment of interest shall be made to the Contractor for delayed payment if any.
If an amount certified is increased in a later date certificate due to corrections in previous certificates or as
a result of an award from disputes review experts, Contractor shall be paid such amount only. The
Contractor shall not be paid any interest upon such delayed payment.
Items of the Works for which no rate or price has been entered in will not be paid for by the Employer and
shall be deemed covered by other rates and prices in the Contract.
44.2 All payments shall be made in Indian Rupees only.
45.0 Taxes and duties
The rates are exclusive of GST, all the prevailing taxes and duties of the Central, State and Local Governing
bodies prevailing on the date of award of the contract. The Contractor will have to pay all such taxes and
duties for the performance of this Contract. The Employer will deduct from the Contractor’s monthly and
other payments all taxes and duties, which he is bound to recover in accordance with the applicable law.
Signature of Bidder Page 55 AMC
Amdavad Municipal Corporation
45.1 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/01/05 and G.R. No. CWA/2004-1831-M(3) dt.
9/12/05 issued by G.O.G. 1 % cess tax (non-refundable) shall be deducted from every bills which shall be
deposited to Govt. Labour Department for Labour welfare fund.
46.0 Currencies
All payments shall be made in Indian Rupees.
47.0 Price Variation
No price variation shall be given for work done and materials.
48.0 Retain from Each Interim Payment Certificate (R A Bill).
48.1 Retention Money
The Employer shall retain, from each payment against Interim Payment Certificate (for work done, any
price variation, amount of Non tender Item, etc) issued by the Engineer to the Contractor, 2% amount of
the sum of value of work done + value of variations + value of Non tender Item as agreed for payment as
retention money. This retention money shall be release with release of Final bill amount.
48.2 Retention Money -2
49.0 Liquidated Damages
100% of work by end of time limit.
i.) If the contractor fails to complete the work under contract by the stipulated date, he shall pay liquidated
damages of at the rate of 0.1 percentage of the contract value per day from the date of delay the said work up
to the date of completion and handing over the Government.
ii.) However also if the contractor fails to complete any part of the work as designed in Schedule (c) by the time
indicated against such part, he shall pay Liquidated damages per day from the date of delaying the said part of
the work up to the date of completion of the said designed part at the rates shown in the said schedule of the
contract value of such part for such failure till the said designed part is completed.
iii.) The aggregate maximum of liquidated damages payable under tender clause shall not exceed 0.10 Percentages
of contract value per day and shall be subject to the maximum amount of ten(10) percentage of the estimated
amount put to tender.
iv) Delay requiring payment of ten percentage liquidated damages of the amount put to tender for performance
shall be sufficient causes for termination of contract and for forfeit of security deposit including amount of
performance bond in respect of works estimated to cost more than Rs. 15 Lakh, for performance and
registration of the contract shall also be kept in abeyance for three years from the date as fixed in all cases.
50.0 Advance Payment
No Advance Payment shall be made.
51.0 Securities Deposit
51.1 The Securities Deposit 5% of the Contract amount shall be provided by the Contractor to the Employer not
later than 15 days from the letter of acceptance and shall be issued in the said amount and on approved
form and by a bank or surety approved by the Employer and denominated in Indian Rupees. The Securities
Deposit shall be valid till 90 days beyond the defect liability period. The Securities Deposit shall be payable
within 15 days from date of receipt of LOA failing which interest @4% per annum will be charges by AMC.
Signature of Bidder Page 56 AMC
Amdavad Municipal Corporation
52.0 Cost of Repairs
52.1 Loss or damage to the Works or Materials to be incorporated in the Works between the Start Date and the
end of the Defects Correction periods shall be remedied by the Contractor at the Contractor's cost if the
loss or damage arises from the Contractor's acts or omissions.
Signature of Bidder Page 57 AMC
Amdavad Municipal Corporation
E. Finishing the Contract
53.0 Completion
53.1 The Contractor shall request the Engineer to issue a Certificate of Completion of the Works and the
Engineer will do so upon deciding that the Work is completed.
54.0 Taking Over
The Employer shall take over the Site and the Works within seven days of the Engineer issuing a certificate
55.0 Final Account
55.1 The Contractor shall submit to the Engineer a detailed account of the total amount that the Contractor
55.1 The Contractor shall submit to the Engineer a detailed account of the total amount that the Contractor
considers payable under the Contract within 60 days of issue of completion certificate. The Engineer shall
check the bill and certify any final payment that is due to the Contractor within 60 days of receiving the
Contractor’s account if it is correct and complete. If it is not, the Engineer shall issue within 15 days a
schedule that states the scope of the corrections or additions that are necessary for the correction and
certify payment of 50% of the undisputed amount to the contractor. If the Final Account is still
unsatisfactory after it has been resubmitted the Engineer shall decide on the amount payable to the
Contractor and issue a payment certificate, within 60 days of receiving the Contractor’s revised account.
55.2 The Contract shall remain active until issue of the Defects Liability Certificate.
55.3 Despite issuance of the Defects Liability Certificate, the contract between the Employer and the
Contractor shall remain in force in respect of unperformed obligations incurred under the provisions of the
Contract prior to the issue of the Defects Liability Certificate
57.0 Termination
57.1 The Employer or the Contractor may terminate the Contract if the other party causes a fundamental breach
of the Contract.
57.2 Fundamental breaches of Contract include, but shall not be limited to the following:
i. the Contractor stops work for 28 days when no stoppage of work is shown on the current Program and
the stoppage has not been authorised by the Engineer:
ii. the Engineer instructs the Contractor to delay the progress of the Works and the instruction is not
withdrawn within 28 days.
iii. the Employer or the Contractor becomes bankrupt or goes into liquidation other than for a
reconstruction restructure or amalgamation.
iv. a payment certified by the Engineer is not paid by the Employer to the Contractor within 50 days of the
date of the Engineer’s certificate:
v. The Engineer gives Notice that failure to correct a particular Defect is a fundamental breach of
Contract and the Contractor fails to correct it within a reasonable period of time determined by the
Signature of Bidder Page 58 AMC
Amdavad Municipal Corporation
vi. The Contractor does not maintain a security which is required.
vii. The Contractor has delayed the completion of works by the number days for which the maximum
amount of liquidated damages can be paid as defined in the Contract data and
viii. If the Contractor, in the judgement of the Employer has engaged in corrupt or fraudulent practices in
competing for or in the executing the Contract.
ix. If the contractor has contravened clause 7.1 and clause
For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or soliciting
of anything of value to influence the action of a public official in the procurement process or in
contract execution. “Fraudulent practice” means a misrepresentation of facts in order to influence a
procurement process or the execution of a contract to the detriment of the Employer, and includes
collusive practice. Bidders (prior to or after bid submission) designed to establish bid prices at artificial
non-competitive levels and to deprive the Employer of the benefits of free and open competition.”
57.3 When either party to the Contract gives notice of a breach of contract to the Engineer for a cause other
than those listed under Sub Clause 57.2 above, the Engineer shall decide whether the breach is
fundamental or not.
57.4 Notwithstanding the above, the Employer may terminate the Contract for convenience subject to payment
of compensation to the contractor. Loss of profit shall be calculated on the same basis as adopted for
calculation of extra/additional items.
57.5 If the Contract is terminated the Contractor shall stop work immediately, make the Site safe and secure and
leave the Site as soon as reasonably possible.
58.0 Payment upon Termination
58.1 If the Contract is terminated because of a fundamental breach of Contract by the Contractor, the Engineer
shall issue a certificate for the value of the work done less other recoveries due in terms of the contract,
less taxes due to be deducted at source as per applicable law and less the percentage to apply to the work
not completed as indicated in the Contract Data. Additional Liquidated Damages shall not apply. If the total
amount due to the Employer exceeds any payment due to the Contractor, the difference shall be a debt
payable to the Employer.
58.2 If the Contract is terminated at the Employer’s convenience or because of a fundamental breach of
Contract by the Employer, the Engineer shall issue a certificate for the value of the work done, the
reasonable cost of removal of Equipment repatriation of the Contractor’s personnel employed solely on the
Works, and the Contractor’s costs of protecting and securing the Works and loss of profit on uncompleted
works less other recoveries due in terms of the contract and less taxes due to be deducted at source as per
applicable law.
All materials on the Site, Plant, Equipment, Temporary Works and Works for which payment has been
made to the contractor by the Employer, are deemed to be the property of the Employer, if the Contract is
terminated because of a contractor’s default.
Signature of Bidder Page 59 AMC
Amdavad Municipal Corporation
60.0 Release from Performance
If the Contract is frustrated by the outbreak of war or by other event entirely outside the control of either
the Employer or the Contractor, the Engineer shall certify that the Contract has been frustrated. The
Contractor shall leave the Site and stop work as quickly as possible after receiving this certificate and shall
be paid for all work carried out before receiving it and for any work carried out afterwards to which
commitment was made
61.0 Defect liability Period
61.1.1 “Defects Liability Period” as stated in the contract data means the period calculated from:
i. The date of completion of the work certified by the Engineer in accordance with Clause 53.1 and its
sub clauses of these conditions of contract.
ii. The respective dates in case different dates of completion of the part works are certified by the
61.2.1 Completion of outstanding work and remedying defects:
a. The contractor shall complete the outstanding work with due diligence. All such work as listed by the
Engineer at the time of issue of “Taking over Certificate “and also.
b. The contractor shall execute all such work of amendment, reconstruction and remedying defects,
shrinkages or other faults as the Engineer may, during the defects liability period or within 14 days of
its expiration, as a result of an inspection made by or on behalf of the Engineer, prior to its expiration,
instruct the contractor to execute.
61.2.3 Costs of all works referred to in clause 52.1 above shall be borne by the contractor.
61.2.4 During the Defect Liability period, it shall appear to the Engineer-in-charge or his subordinates that any work
has been executed with unsound, imperfect, or unskilful workmanship or with materials of inferior quality;
or that any materials or articles provided by him for the execution of the work are unsound, or of a inferior
quality, or other- wise not in accordance with the contract, it shall be lawful for the Engineer-in-charge to
intimate this fact in writing to the contractor and the contractor shall be bound forthwith to rectify, or
remove and reconstruct the work so specified in whole or in part as the case may be.
61.2.5 Failing which within a period to be specified by the Engineer-in-charge in the written intimation aforesaid,
the contractor shall be liable to pay compensation at the rate of one percent on the amount of the tender
for every day not exceeding ten days, in the event of any such failure as aforesaid the Engineer-in-charge
may rectify or remove and re-execute the work or remove and replace the materials or articles complained
or as the case may be at the risk and expense in all respects of the contractor.
61.2.6 Engineer-in-charge consider that any such inferior work or materials as described above may be accepted or
made use of it; shall be within his discretion to accept the same at such reduced rates along with the
appropriate penalty as the Municipal Commissioner may deem fit.
61.2.7 For All works 5 years defect liability period is considered after completion of work
Signature of Bidder Page 60 AMC
Amdavad Municipal Corporation
F. General Description and Scope of Work
62.0 Scope of work
62.1 The scope of work and explanatory notes given are neither complete nor exhaustive but are added to
assist the Contractor to understand the project. The detail scope is as described in the schedule B and
specifications. However, any item of work required to be carried out for proper and satisfactory completion
of work with the highest standard of workmanship is deemed to be included in the scope of work whether
or not it is specifically included in the schedule B.
62.2 The Contractor shall be solely responsible for the true and proper setting out of the alignments and for the
provision of all necessary instruments, at any time during the execution of the work. In case of any error
regarding location, levels, dimensions, or alignment of any part of the work, the Contractor on being
required to rectify such errors as may be pointed out by the Engineer, shall at his own expense do so, to the
satisfaction of the Engineer. The checking of any setting out of any line or level by the Engineer or his
representative shall not, in any way, relieve the Contractor of his responsibilities for the correctness
thereof. The Contractor shall carefully protect and preserve all benchmarks, site nails, pegs, reference
pillars and other measures used in setting out of the work.
62.3 The works shall, inter alia, include the following, as specified or as directed.
i. Site clearance, removal of tree stumps and dismantling of obstructions, encroachments etc. before
commencement of the works;
ii. True and proper setting out and layout of the works as per the instruction of Engineer In Charge at no
extra cost, provisions of all necessary labours, instruments, and appliances;
iii. Ensuring safe traffic movement at all times during construction/work and proper barricading and
safety provide while working;
iv. Any other item of work as may be required to be carried out for completing the road works in all
respects in accordance with the provisions of the contract;
v. During night work proper lighting arrangement should be provided by the contractor;
vi. During the period of the contract, the right of way and all existing roads shall be kept open for traffic
and maintained in a safe and usable condition. Residents along and adjacent to the works are to be
provided with safe convenient access to their properties at all times. Traffic control and traffic
diversions shall be used as necessary to protect the work and maintain them as directed by the
engineer and provided in the contract;
vii. All aspects of quality assurance of various components of the work;
viii. Clearing of site and handing over of the works;
ix. Rectification of the defects in the completed works during the defect’s liability period;
63.0 Climatic Conditions
It shall be deemed that the Contractor has satisfied himself to the nature and location of the work, general
and local conditions and particularly those pertaining to transport handling and availability and storage of
materials, availability of labour, weather conditions, that he has estimated his cost accordingly and the
client will bear no responsibility for the lack of such knowledge of site conditions and also consequences
thereof, to the bidder. The information and the data shown in the drawings and mentioned herein and
elsewhere under the contract are furnished for general information only and the client in no case will be
Signature of Bidder Page 61 AMC
Amdavad Municipal Corporation
held responsible for the strict accuracy thereof or any deductions, interpretations or conclusion drawn
there from by the contractor.
The climate in this region is moderately hot. The monsoon depends upon the advent of the south -west
wind but the normal rainy season commences from early June and lasts up to early October in this region.
Occasionally, shower may be expected even earlier. There is generally no rain beyond October though
some stray showers may be experienced. The yearly average rainfall in the area is about 30” (750 mm).
64.0 Availability of Labour
Unskilled labour may be available locally and skilled labour may also be available locally or in the
immediate city area for the work of this type and magnitude.
65.0 Marketing Centres
Site is locating the city.
66.0 Housing, Water Supply and Drainage etc.
Housing accommodation on hire is likely to be available in this area around the site. The Contractor has to
make his own arrangements for the housing of labourers. The land required for setting up stacking of
materials, site office, labour quarters, testing laboratory, etc. will be arranged by contractor.
Water Supply for drinking purposes and construction purpose at the site shall also have to be arranged by
the Contractor at his own cost as may be required. The water can be available by drilling bore hole.
67.0 Facilities
Nearest Railway Station is Sabarmati and kalupur from the work site. A post office is also available.
The nearest airport is Amdavad Airport.
68.1 All materials Plant and equipment and workmanship shall be:
a) of the respective kinds described in the contract and in accordance with the Engineers instructions
b) Subjected from time to time such tests as the Engineer may require at place of manufacture,
fabrication or preparation, or on the Site OR at such other place or places as may be specified in the
contract or at all or any of such places.
68.2 All Contractors materials, plant, machinery and equipment shall be deemed to have been exclusively
brought to site for the execution of the works and shall not be removed from site without the consent of
68.3 Employer shall not be liable for damage to Contractor’s equipment at any time unless otherwise expressly
stated in the contract.
68.6 The provisions of the sub clauses 68.2, 68.3 and 68.5 shall be applicable to the sub contractors appointed
by the Contractor in accordance with this contract.
68.7 All the above sub clauses 68.2, 68.3, 68.5 and 68.6 do not in any way imply approval to any kind of
materials used in the works.
Signature of Bidder Page 62 AMC
Amdavad Municipal Corporation
68.8 All samples shall be supplied and tested by the Contractor at his own cost.
68.9 The cost of all tests shall be borne by the Contractor except the tests that are required by the Engineer are
clearly beyond the Contractors obligations of proving the quality and workmanship standards of all
materials, equipment, plants and Works. The Engineer shall determine the costs and time effects of such
tests that are not a part of the Contractors obligations.
68.10 The Contractor will have to make his own arrangement for plants, equipments, and machinery to be used
in the execution of this work well in time after award of the contract and as per work program given by
68.11 Contractor shall give Engineer 24 hours’ notice for inspection of works or witnessing of test. The
Contractor shall proceed with the works or tests in case the Engineer does not attend. Such tests and shall
be deemed to have been carried out in the presence of the Engineer.
68.12 The Engineer may reject such material, plant, part of the works which are defective and/ or otherwise not
in accordance with the contract and notify the Contractor. The notice shall state the Engineers objections
and reasons. The Contractor shall then promptly rectify the defect or ensure that rejected materials or
plant are not used in the Works. In case the Contractor wishes to retest such materials, plant or works
declared defective by the Engineer, he has to bear the time and cost effects of such retests as mutually
agreed with the Employer in consultation with the Engineer.
68.13 The Contractor shall have to make his own arrangement to get the power supply from concerned electric
authority. The cost of electrical charges is to be borne by contractor.
69.0 Labour Employment
69.1 Contractor shall, unless otherwise provided in the Contract, make his own arrangements for the
engagement of all staff and labour, local or other, and their payment, housing, feeding and transport.
69.2 Contractor shall furnish the Engineer every week during the progress of the works, classified weekly
returns of the number of the people employed on the work during the week. The report of skilled and
unskilled labour shall be given in the prescribed form.
The Contractor shall strictly observe all the requirements laid down in the contract labour (Regulation and
Abolition) Act, 1979 and the contract labour (Regulation and Abolition) (Gujarat) Rules, 1972 and other acts
as amended from time to time so far as applicable from time to time.
The contractor, if directed by the Engineer shall increase or decrease the strength of the labour both skilled
and unskilled required for the work. The Contractor shall also furnish the following returns.
a) A report of any accident, which may have occurred, within 24 hours of its occurrence.
b) To maintain hygienic condition in labour camp and construction site as per the rules and regulation of
authority and health department.
c) Accident reports within 24 hours of occurrence of each accident. The Contractor shall
d) Not import, sell give or barter alcoholic liquor or drugs.
e) Not import, sell give or barter arms and ammunition.
70.0 Program Through Net Work Technique
70.1 The Contractor shall furnish a complete Bar Chart considering all activities right from the award of work to
mobilisation at site, procurement of materials, machinery’s / equipments/ labour etc. for completion of the
Signature of Bidder Page 63 AMC
Amdavad Municipal Corporation
work in all respects and get it approved from the Engineer, latest within two weeks after issue of notice to
proceed with work. This shall form part of the contract agreement. This program will be reviewed by the
Engineer, in consultation with the Contractor every month to assess the shortfall and to decide actions to
70.2 The Contractor shall further abide by the following instruction:
a) The Contractor shall cooperate fully for clarifying or evaluating schedule and also for ensuring control
or monitoring the progress of the work, as per approved schedule from time to time.
b) The Contractor shall endeavour to minimise revision of the program as far as possible after the work
gets into the construction.
c) The Contractor shall immediately inform the Engineer whenever there is or there is likely to be, any
change in his schedule.
d) In case of a schedule slippage due to the contractor’s inability to perform as contracted, the Contractor
shall immediately take such action as may be necessary to bring back his work to schedule without
additional cost to the Client, either by employing over time operations, increasing the number of shifts,
capacity of equipments etc. or as directed by the Engineer.
71.0 Foreign Exchange Requirement
It should be clearly understood that no foreign exchange sanction would be made available for either
purchase of equipments, plants, machinery’s, material of any kind or any other thing, required for
execution of the work. It should also be clearly understood that no request for importing equipments,
materials, plants, etc. that may be required in carrying out the work shall be entertained.
72.0 Relation with Public Authorities
The Contractor shall comply with all obligations arising out of legal orders and directions that may be given
to him from time to time, by any local or public authorities and shall pay out of his own money, all charges
becoming payable to such authorities. He shall co-ordinate his activities during execution, with all agencies
including AMC, Design Consultants, construction management consultants, agencies like TPL (Torrent
Power Ltd.), GEB (Gujarat Electricity Board), AMC (Amdavad Municipal Corporation), Irrigation Department,
AUDA (Amdavad Urban Development Authority), Government of India, Railway Department, Government
of Gujarat Amdavad Telephones and their representatives without any dispute.
Signature of Bidder Page 64 AMC
Amdavad Municipal Corporation
73.0 Register to be Maintained
73.4 Any other register considered necessary by the Engineer shall be maintained at site in which the
representative to the Engineer and the Contractor/s will have to sign. All registers, program, charts etc. will
be the property of the AMC.
73.5.1 Contractor shall make all arrangements for collection & transportation from site and testing of samples in
sufficient quantities as required and provided in relevant IS codes at the laboratory approved by the
Engineer. All these will be at no extra cost to the client.
73.5.2 A register in prescribed Performa showing test results of materials and work tests will be maintained at the
site of work by the Contractor and every entry thereof shall invariably be signed by the Contractor or his
representative and also by Engineer or his authorized representative in token of its correctness.
73.6 The Contractor Shall Further Abide by the Following Instructions
73.6.1 Soon after receipt of work order awarding the contract, the Contractor for all purposes connected with the
execution of work, shall immediately make his own arrangements for obtaining Electricity supply and
required supply of water in such quantity and of such quality at such places on the work as may be
necessary, by paying charges to the authorities supplying the same after completing all formal procedures
as may be required as per the rules with them. The rates quoted in the tender are for completed items of
work and shall cover cost of water and electricity as aforesaid. Water for drinking purposes for labourers
etc. shall also have to be arranged by the Contractor at his own cost. No cost shall be borne by Employer on
this account. Employer shall not be responsible in any way for this purpose. However, the contractor shall
be given all possible assistance in the procurement of these requirements but no assurance can be given by
73.6.2 The bidder must clearly understand that the rates quoted are for completed items of work and as such
includes all costs associated with labour, materials, Wastage if any, scaffoldings, plants, equipments,
supervision, survey works, power, water., sales tax / income tax, and other taxes in force and may be
imposed by competent authority after wards including turn over work tax, duties and any other
requirements contingent upon and needed to carry out the construction. The income tax will be deducted
from the running account bill as per rules.
73.6.3 No claim by the Contractor for additional payment will be allowed on the ground of any misunderstanding
or misapprehension in respect of technical interpretations of conditions or any such matter or otherwise on
the ground of any allegation of fact that incorrect information was given to him in the tender or by any
person, whether in the employment of the client or consultant or of the failure on his part, to obtain
correct information. The bidder shall not be relieved of any risks or obligations imposed upon or
undertaken by him, under the contract, or any such ground or on the ground that he did not or could not
foresee any matter, which may in fact, affect or have affected the execution of the work.
74.0 Equipment and Accessories
Signature of Bidder Page 65 AMC
Amdavad Municipal Corporation
The Contractor shall provide all the equipments and accessories for execution of work.
75.0 Patent rights
The Contractor shall save harmless and indemnify the Employer from and against all claims and
proceedings for or on account of infringement of any patent rights, design trademark or name or protected
rights in respect of Contractors equipment, material or Plant used for or in connection with incorporation in
The Contractor shall pay all royalties for getting construction materials required for the Works.
77.0 Urgent Remedial work:
If, by reason of any accident, or failure, or other event occurring to, in, or in connection with the Works, or
any part thereof, either during the execution of the Works, or during defects liability period, any remedial
or other work is, in the opinion of the Engineer, urgently necessary for the safety of the Works and the
Contractor is unable or unwilling at once to do such work, the Employer shall be entitled to employ and
pay other persons to carry out such work as the Engineer may consider necessary. If the work or repair so
done by the Employer is work which, in the opinion of the Engineer, the Contractor was liable to do at his
own cost under the Contract, then all costs consequent thereon or incidental thereto shall, after due
consultation with the Employer and the Contractor, be determined by the Engineer and shall be
recoverable by the Employer from the Contractor, and may be deducted by the Employer from any
monies due or to become due to the Contractor and the Engineer shall notify the Contractor accordingly,
with a copy to the Employer. Provided that the Engineer shall, as soon after the occurrence of emergency
as may be reasonably practicable, notify the Contractor thereof.
78.0 Special Risks:
78.1 The Contractor shall be under no liability whatsoever in consequence of any of the special risks referred to
in sub clause 78.5 whether by way of indemnity or otherwise, for or in respect of:
78.2 Destruction or damage to work, except defective works to be removed and rectified, prior to the
occurrence of the said special risks.
78.3 Destruction of or damage to property, whether of the Employer or third parties or Injury or loss of life, not
caused by negligence of the Contractor and even after following all the safety norms by the Contractor.
78.4 The special risks are as defined in sub clause 78.1 of these conditions. Destruction caused by a
projectile, missile or bomb is also included in special risks.
78.5 The Contractor shall be entitled to payment in accordance with the Contract on account of damages
covered under special risks as stated in clause 78.1 and 78.2 for any permanent work executed and for any
material or plant so destroyed or damaged as required by the Engineer or as necessary for the completion
of the works. The payment shall be for
i. Rectifying any such destruction or damage to works
ii. Replacing or rectifying such materials or Contractor’s Equipment.
And the Engineer shall determine an addition to the Contract Price in accordance to the sub clause 41 of
these conditions, and shall notify the Contractor accordingly with a copy to the Employer.
Signature of Bidder Page 66 AMC
Amdavad Municipal Corporation
78.6 The Contractor shall inform by giving notice to the Engineer with a copy to Employer, as soon as events
covered by special risks occur and the cost implications of these.
78.7 The Contractor shall use his best endeavours to complete the execution of Works in the event of outbreak
of war in any part of the world.
78.8 In case the Employer chooses to terminate the contract on account of the outbreak of war, the Contractor
shall remove his plant and machinery from site diligently. Similar facility shall be extended to the sub
78.9 In the event of termination of contract on account of outbreak of war, the Contractor shall be entitled to
payment towards the following items apart from other payments due as per conditions of contract
78.10 Sum being the amount of any expenditure reasonably incurred by the Contractor, in the expectation of
completing the whole of the works, in so far as such expenditure has not been covered by any other
78.11 Proportionate demobilisation costs towards manpower and machinery and plant.
78.12 The Contractor shall take all reasonable steps to protect the environment on and off the site and avoid
damage or nuisance to persons or property of the public and others arising as a consequence of his method
78.13 The Contractor shall maintain in good condition all work throughout execution, completion and defects
liability period. The contractor shall be responsible for and to make good all injuries, damages and repairs,
rendered necessary by fire, rain, traffic, floods or other causes
78.14 The Contractor shall be responsible for maintenance and watch and ward of the complete installation and
shall also be responsible for any pilferage, theft, damage, penalty etc. in this regard. The Contractor shall
indemnify the Engineer against any claim arising out of pilferage / theft, damage, penalty etc. whatsoever
on this account. Security deposit for the work shall be released only after the clearance is obtained from
the local authorities from whom temporary electric/ water I telephone connection have been obtained by
the contractor and also as per AMC's latest circular.
78.15 The Contractor shall depute Engineers & skilled workers as required for the work. Necessary protective and
safety equipments shall be provided to them by the Contractor at his own cost and used at site.
78.16 Security & Traffic Arrangements
In event of any restriction being imposed by the Security Staff of The Employer, Amdavad Municipal
Corporation traffic or any other local governing body having control over the project, on the working or
movement of labour, materials, the Contractor shall strictly follow all such restrictions or instructions
issued regarding the same and nothing extra shall be payable to the Contractor on account of such
restrictions or instructions. In case of loss of time on this account if any, shall have to be made up by
generating additional resources etc.
General security restrictions are given as under:
i. The movement of trucks and vehicles shall be regulated in accordance with rules and regulations as
approved by competent authorities.
ii. The Contractor shall inform in advance, if required, the truck registration numbers ownership of the
trucks, names and addresses of the drivers for necessary action by the security agency.
iii. As and when there will be security requirements, certain additional restrictions can be imposed as per
the requirement of the situation.
iv. No claim whatsoever will be entertained by the Employer on account of any restriction that can be
Signature of Bidder Page 67 AMC
Amdavad Municipal Corporation
imposed as per the requirement of the situation.
79.0 Force Majeure
Neither party shall be to liable to the other for any loss of damage occasioned by or arising out of acts of
god, and in particulars, unprecedented Floods, volcanic eruption earth quake or other convulsion of nature,
and other acts such as but not restricted to general strike, invasion, the act of foreign countries, hostilities
or war like operations before or after declaration of war, rebellion, military or usurped power which
prevent performance of the contract and which could not have been for seen or avoided by a prudent
80.0 Changes in Cost and Legislation
There shall be no addition or deduction from the Contract Price due to changes to any National or State
Statute, Ordinance, Decree, Law, Regulation or byelaw. The adjustment to Contract Price affected under
various sub clauses detailed in clause 41 shall be deemed to cover such costs.
There shall be no addition or deduction from the Contract Price due to changes to any National or State
Statute, Ordinance, Decree, Law, Regulation or byelaw. The adjustment to Contract Price affected under
various sub clauses detailed in clause 41 shall be deemed to cover such costs.
81.0 Footpath Paver Block, Footpath curb, Central verge curb - Successful bidder of this tenderer shall have to
purchase 50% of total quantity of Paver Blocks/ footpath curbs/Central verge curbs from Amdavad Enviro
Projects Pvt. Ltd. directly. If quantity of 50% of Paverblock/Footpath curbs/Central verge curbs are not
available Amdavad Enviro Projects Pvt. Ltd within stipulated period of time, contractor has to take prior
permission for use of other than from Amdavad Enviro Projects Pvt. Ltd.Paver blocks/Footpath
curbs/Central verge curbs.
Signature of Bidder Page 68 AMC
Amdavad Municipal Corporation
G. Special Conditions of Contract
81.0 Special Conditions of Contract
81.1 As the work is to be constructed in heavy traffic area, Employer will not be in a position to give entire
stretch of work at a time. No claim shall be entertained for the same.
81.2 If any utility fouls during execution, same shall be shifted by the contractor as directed by Engineer-in-
charge. No claim for time extension shall be entertained for the same.
81.3 Contractor is required to use his own national / international practices of tracing out or locate underground
utilities below the ground at no cost to the Employer.
81.4 No claim shall be entertained if the items stipulated in the tender shall not be executed as per site
condition/ requirements.
81.5 No idle charges shall be paid to contractor if any machinery and man power remain idle and no claim shall
be entertained for the same.
81.6 Municipal Commissioner Reserves the rights to reduce / increase the scope of work up to any extent
without assigning reason thereof and the contractor has to execute the BOQ items at his tender rate.
81.7 Total Station Survey of Central line marking, different utilities, trees, encroachment etc:- The contractor
have to carry out total station survey of each roads included in the tender showing central line of the
road, location of Machine holes, Catchpits, Trees, Temples, Power Distribution Boards, Encroachments
etc. before starting the work on site. Contractor shall have to submit such survey report and drawing to
81.8 Footpath Paver Block, Footpath curb, Central verge curb - Successful bidder of this tender shall have to
purchase 50% of total quantity of Paver Blocks/ footpath curbs. /Central verge curbs from Amdavad
Enviro Projects Pvt. Ltd. directly. If quantity of 50% of Paverblock/Footpath curbs/Central verge curbs are
not available Amdavad Enviro Projects Pvt. Ltd within stipulated period of time, contractor has to take
prior permission other than from Projects Pvt. Ltd.Paver blocks/Footpath curbs/Central verge curbs.
81.9 Even If Bidder is Lowest Municipal Commissioner reserves the right to issue/not issue work in case of
insufficient bid capacity or progress & quality of previous years work was not Satisfactory inAMC/Any
Other Departments of ULB, GOG, GOI.
81.10 Conditions mentioned in the AMC Finance Department Circular No.9 Dt. 18-05-2012; Circular No.18 Dt. 04-
07-2012; Circular No.57 Dt.28-12-2014 and Circular No.60 Dt.24.10.2015 shall also be applicable. And all
AMC Circular and Government GR till date will applicable for this tender.
81.11 Contractor shall have to maintain all required registers for quality control, material management (For all
the material on which price variation clause is applicable) and progress of the work as per the AMC’s
prevailing circulars & as directed by Engineer-in-charge on daily basis.
The Contractor shall, unless otherwise provided in the Contract, make his own arrangements for the
engagement of all staff and labour, local or other, and for their payment, housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the Engineer a return in detail, in such form and
at such intervals as the Engineer may prescribe, showing the staff and the numbers of the several classes of
Signature of Bidder Page 69 AMC
Amdavad Municipal Corporation
labour from time to time employed by the Contractor on the Site and such other information as the
Engineer may require.
83.0 COMPLIANCE WITH LABOUR REGULATIONS:
During continuance of the contract, the Contractor and his sub contractors shall abide at all times by all
existing labour enactment and rules made there under, regulations, notifications and bye laws of the State
or Central Government or local authority and any other labour law (including rules) regulations, bye laws
that may be passed or notification that may be issued under any labour law in future either by the State or
Central Government or the local authority. Salient features of some of the major labour laws that are
applicable to construction industry are given below. The Contractor shall keep the Employer indemnified in
case any action is taken against the Employer by the competent authority on account of contravention of
any of the provisions of any Act or rules made there under, regulations or notifications including
amendments. If the Employer is caused to pay or reimburse such amounts as may be necessary to cause or
observe, or for non-observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the Contractor the Nodal Officer
or his nominee/Employer shall have the right to deduct any money due to the Contractor including his
amount of performance security. The Engineer or his nominee shall also have right to recover from the
Contractor any sum required or estimated to be required for making good the loss or damage suffered by
The employees of the Contractor and the Sub-Contractor in no case shall be treated as the employees of
the Employer at any point of time.
84.0 SALIENT FEATURES OF SOME MAJOR LAWS APPLICABLE TO ESTABLISHMENTS ENGAGED IN BUILDING
AND OTHER CONSTRUCTION WORK.
(a) Workmen Compensation Act 1923:- The Act provides for compensation in case of injury by accident
arising out of and during the course of employment.
b) Payment of Gratuity Act 1972: Gratuity is payable to an employee under the
Act on satisfaction of certain conditions on separation if an employee has completed 5 years service
or more on death at the rate of 15 days wages for every completed year of service. The Act is
applicable to all establishments employing 10 or more employees.
c) Employees P.F and Miscellaneous Provision Act 1952: The Act Provides for monthly contributions by
the employer plus workers @ 12%/8.33%. The benefits payable under the Act are:
(i) Pension to family pension on retirement or death, as the case may be.
(ii) Deposit linked insurance on the death in harness of the worker.
(iii) Payment of P.F accumulation on retirement/death etc.
d) Maternity Benefit Act 1951:- The Act provides for leave and some other benefits to workmen/
employees in case of confinement or miscarriage etc.
e) Contract Labour (Regulation & Abolition) Act 1970:- The Act provides for certain welfare measures to
be provided by the Contractor to contract labour and in case the Contractor fails to provide, the same
are required to be provided, by the Principal Employer by Law. The Principal Employer is required to-
take Certificate of Registration and the Contractor is required to take license from the designated
Officer. The Act is applicable to the establishments or Contractor of Principal Employer if they employ
20 or more contract labour.
f) Minimum Wages Act 1948: The Employer is supposed to pay not less than the Minimum Wages fixed
by appropriate Government as per provisions of the Act if the employment is a scheduled
employment Construction of Buildings, Roads, Runways are scheduled employment.
g) Payment of Wages Act 1936:- It lays down as to by what date the wages are to be paid when it will be
paid and what deductions can be made from the wages of the workers.
h) Equal Remuneration Act 1979:- The Act provides for payment of equal wages for work of equal
nature to Male and Female workers and for not making discrimination against Female employees in
the matters of transfers, training and promotions etc.
Signature of Bidder Page 70 AMC
Amdavad Municipal Corporation
i) Payment of Bonus Act 1965: The Act is applicable to all establishments employing 20 or more
employees. The Act provides for payments of annual bonus subject to a minimum of 8.33% of wages
and maximum of 20% of wages to employees drawing Rs. 3500/- per month or less. The bonus to be
paid to employees getting Rs. 2500/- per month or above up to Rs. 3500/- per month shall be worked
out by taking wages as Rs. 2500/- per month only. The Act does not apply to certain establishments.
The newly set-up establishments are exempted for five years in certain circumstances. Some of the
State Governments have reduced the employment size from 20 to 10 for the purpose of applicability
j) Industrial Disputes Act 1947:- The Act lays down the machinery and procedure for resolution of
Industrial disputes, in what situations a strike or lockout becomes illegal and what are the
requirements for laying off or retrenching the employees or closing down the establishment.
k) Industrial Employment’s (Standing Orders) Act 1946:- It is applicable to all establishments employing
100 or more workmen (employment size reduced by some of the States and Central Government to
50). The act provides for laying down rules governing the conditions of employment by the Employer
on matters provided in the Act and get same certified by the designated Authority.
l) Trade Unions Act 1926:- The Act lays down the procedure for registration of trade union of workmen
and employers. The Trade Union registered under the Act has been given certain immunities from
civil and criminal liabilities.
m) Child Labour (Prohibition & Regulation) Act 1986:- The Act prohibits employment of children below
14 years of age in certain occupations and processes and provides for regulation of employment of
Children in all other occupations and processes. Employment of Child Labour is prohibited in Building
and Construction Industry.
n) Inter-State Migrant workmen’s (Regulation of Employment & Conditions of Service) Act 1979:-
The Act is applicable to an establishment which employs 5 or more inter-state migrant workmen
through an intermediary (who has recruited workmen in one state for employment in the
establishment situated in another state). The Inter-State migrant workmen, in establishment to
which this Act becomes applicable, are required to be provided certain facilities such as housing,
medical aid, travelling expenses from home upon the establishment and back, etc.
o) The Building and Other Construction workers (Regulation of Employment and Conditions of Service)
Act 1996 and the Cess Act of 1996:- All the establishments who carry on any building or other
construction work and employ 10 or more workers are covered under this Act. All such
establishments are required to pay cess at the rate not exceeding 2% of the cost of construction as
may be modified by the Government. The Employer of the establishment is required to provide
safety measures at the Building or Construction work and other welfare measures, such as Canteens,
First-Aid facilities, Ambulance, Housing accommodations for workers near the work place etc. The
Employer to whom the Act applies has to obtain a registration certificate from the Registering Officer
appointed by the Government.
p) Factories Act 1948:- The Act lays down the procedure for approval at plans before setting up a
factory, health and safety provisions, welfare provisions, working hours, annual earned leave and
rendering information regarding accidents or dangerous occurrences to designated authorities. It is
applicable to premises employing 10 persons or more with aid of power or 20 more persons without
the aid of power engaged in manufacturing process.
Signature of Bidder Page 71 AMC
Ahmedabad Municipal Corporation
Section - III: Contract Data
1. The Employer is
Amdavad Municipal Corporation
“Tushar Deshmukh Bhavan Second Floor,Near Shalby
Hospital,Jodhpur,South West Zone
2. Name of authorised Representative of Employer: The Municipal Commissioner, AMC,
Amdavad or his representative deputed by him.
3. The defects Liability Period is 5 year from the date of completion. The date of completion
is as per completion certificate, which will be issued by AMC.
4. The Start Date shall be from the date of issue of notice to proceed with the work.
7 Time limit is 12 (Twelve) months
8. The Site is located in Amdavad City.
9. Name of Work: Construction of New RCC road work and Paver work in Jodhpur Gamtal
Area in Jodhpur ward in South West Zone. (ARC)
10. The following document also form part of the Contract:
The Contract Agreement
The instructions to Bidders
The Bid Information
The Letter of Acceptance and notice to proceed with the works
The accepted Contractor’s Bid after amendments, addenda.
The Contract Data
The General Conditions of Contract and special conditions of contract
The Technical Specifications
Any other document listed in the Contract Data as forming part of the Contract.
Submission made by contractor as per qualification document (Volume-2)
11. The law which applies to the Contract is the law of Union of India
12. The language of the contract document is English
13. Subcontracting is allowed only with prior permission from Engineer / Employer.
16. The minimum insurance cover for physical property, injury and death is Rs. 15 lacs per
occurrence with the number of occurrences limited to four. After each occurrence,
contractor will pay additional premium necessary to make insurance valid for four
occurrences always, up to expiry of defect liability period.
17. The Site Possession Date shall be the immediate next day on award of work.
18. Appointing Authority for the Dispute Review Expert - The Municipal Commissioner,
Amdavad Municipal Corporation
Signature of Bidder Page 72 AMC
Ahmedabad Municipal Corporation
19. The period for submission of the programme for approval of Engineer shall be 15 days
from the issue of work order/Notice Proceed.
20. The period between programme updates shall be 1 Month.
22. The following events shall not be compensated on any account:
Contractor should make its own assessment for the following aspects before bidding.
Substantially adverse ground conditions encountered during the course of execution of
work not provided for in the bidding document.
i. Removal of underground utilities.
ii. Removal of unsuitable material like marsh, debris dumps, etc not caused by the
iii. Artesian conditions
iv. Seepage, erosion, landslide
v. Presence of historical, archaeological or religious structures, monuments
interfering with the works
vi. Restriction of access to ground imposed by civil, judicial, or military authority
vii. Suitable arrangement for diversion of traffic.
23. The currency of the Contract is Indian Rupees.
24. Retention Money @ 2 % of the value of work done including any Price variation paid to
Contractor will be deducted from each RA bill.
25. As per clause no:49
Amount of Liquidated damages for delay in
completion of works.
26 Security Deposit In the form of Bank Guarantee of bank as
mentioned in Annexure-VII in the favour
of Municipal Commissioner, Amdavad
amount equal to 5% amount of Contract
Value, valid till 90 days beyond Date of
completion of work. The Security Deposit
shall be paid within in 15 days from date
of receipt of LOA failing which interest
@4% per annum will be charged by AMC.
Signature of bidder: Add. City Engineer (SWZ)
Date Amdavad Municipal Corporation
Signature of Bidder Page 73 AMC
Ahmedabad Municipal Corporation
Section - IV: TECHNICAL SPECIFICATIONS
A – PROJECT FEATURES AND WORK PLANNING
1.0 Location of the Site
Painting work of kerbs, central verges and parapet walls and other portion of bridge on different
bridges /river bridges of Eastern part in Amdavad City.
2.0 Scope of Work
All safety measures & scaffolding or any extra arrangement for painting work should be
carry out by the contractors at its own cost No Extra payment for this work.
Cleaning of site and bridge parapet before painting with the help of water or as instructed
by site incharge.
Painting work on Bridge Parapet & Curbing at any height all the necessary arrangement
and scaffolding work arranged by contractor at its own cost with proper safety measures
as well as with proper traffic diversion.
Contractor must apply second coat only after satisfactory inspected of 1st coat of painting
by site incharge/Engineer.
Contractor must be provided original purchase bill along with batch manufacturing
certificate of colour materials used at site before raising bill.(MTC certificate)
2.1 Special Precautions to be taken regarding traffic.
Special precautions to safely divert the traffic with smooth movement of continuous traffic should
be taken up before commencing the work. Safety precaution shall be taken up as required and as
directed by the Engineer particularly at cross road junctions.
In addition to the normal barricading the diversion sign boards and signs showing directions etc
are required to be provided. The Contractor shall have to cater for following special safety
Blinking electric warning red coloured lights to warn the vehicular traffic of the obstruction on the
road during construction activities.
Strong barricading/fencing of approved design to keep pedestrians segregated from foundation,
superstructure equipment, material, etc.
Translucent reflectors, metallic or glass as directed by Engineer-in-Charge.
All schemes of providing safety measures shall be got approved from the Engineer-in-Charge and
the concerned traffic controlling authorities.
2.2 Setting out Works
The Contractor shall be responsible for the true and proper setting out of the works and for the
correctness of the positions levels, dimensions and alignment of all parts of the works and for the
provisions of all necessary instruments and appliances and labour in connection therewith. If at
Signature of Bidder Page 74 AMC
Ahmedabad Municipal Corporation
any time during the progress of works any error shall appear or arise in the positions, levels,
dimensions or alignment of any part of the works, the Contractor on being required to do so by
the Engineer shall at his own expenses rectify such errors to the satisfaction of the Engineer-in-
Charge. The checking of any setting out or of any lines and levels by the Engineer-in-Charge or his
representative shall not in any way relieve the Contractor of his responsibility for correctness
thereof and the Contractor shall carefully protect, preserve and maintain all bench marks, site
rails, pegs etc. used in setting out the works. The costs of providing, preserving, protecting and
maintaining the site rails, pegs, benchmark etc. shall be deemed to be included in the rate quoted
for various items in the schedule B and no separate payment will be made for the same.
The Contractor shall incorporate into the structure the fixtures for lighting, drainage, road
markers, signals etc. as may be given to him by the Engineer-in Charge, without claiming any extra
2.3 All permanent and temporary works shall conform to the latest specifications of Codes of Indian
Road Congress, Specifications of Road & Bridge works by Ministry of Road Transport and
Highways, IS Standards and code of other relevant codes and prevailing sound Engineering
practices as mentioned in the contract documents or approved by the competent authority as
2.4 Footpath Paver Block, Footpath curb, Central verge curb - Successful bidder of this tenderer shall
have to purchase 50% of total quantity of Paver Blocks/ footpath curbs/Central verge curbs from
Amdavad Enviro Projects Pvt. Ltd. directly. If quantity of 50% of Paverblock/Footpath
curbs/Central verge curbs are not available Amdavad Enviro Projects Pvt. Ltd within stipulated
period of time, contractor has to take prior permission for use of other than from Amdavad Enviro
Projects Pvt. Ltd.Paver blocks/Footpath curbs/Central verge curbs.
Signature of Bidder Page 75 AMC
Ahmedabad Municipal Corporation
B. Specification
The Technical Specifications contained herein shall be read in conjunction with the other Bidding
3.0 TECHNICAL SPECIFICATIONS:
The Technical Specifications in accordance with which the entire work described hereinafter shall
be constructed and completed by the Contractor shall comprise of the following:
3.1 The General Technical Specifications shall be the "R & B department General Specification”, as
corrected in the original issued by the Road and Building Department, Government of Gujarat.
3.2 In the absence of any definite provisions on any particular issue in the afore said Specifications,
reference may be made to the latest codes and specifications of IRC and BIS in that order. Where
even these are silent, the construction and completion of the works shall conform to sound
engineering practice as approved by the Engineer and in case of any dispute arising out of the
interpretation of the above, the decision of the Engineer shall be final and binding on the
3.3 For detailed specification of section-III of Schedule B (underground utilities work) refer Govt. of
Gujarat R & B Department booklet for General technical Specifications.
4.0 GENERAL SPECIFICATIONS
4.1 The Contractor shall have to maintain account of steel and other materials that may be brought
by him on site. The account shall be regularly maintained and kept open for inspection by
4.2 The Contractor shall remain responsible for workmen's compensation if any, when such case
occurs, the Contractor shall arrange for red lamps at night and fencing and pagi and shall be
responsible for any damage of life and lime or property if any happen, during the execution of
work. In case of dispute for unseen or overlooked items, the decision of Authority shall be final.
The Contractor shall have to give site clean of all rubbish on completion of work and hand over
the Culvert with final finishing of the work as directed. All the rejected materials shall be removed
from site within 24 hours by contractor at his risk and cost.
4.3 The Contractor shall have to make his own arrangement for water required for the work and shall
pay the water charges as per rules.
4.4 If in the interest of the Employer or site conditions it is necessary to change either any site or the
design of the proposed work the Contractor shall carry out the same at his quoted rates, without
charging any extra and he will be paid at the rates quoted by him and no claim for extra charges
made will be entertained.
4.5 Requisite staging arrangements and shuttering are to be organized so as to ensure smooth flow of
traffic on the roads underneath during the progress of all cast in situ work. Proper barricading
with requisite lights need to be provided to protect all work sites to avoid any mishaps. The
scaffolding/staging system, shuttering etc. should be conceived in such a way that it is sturdy and
at the same time easy to install and dismantle with minimum interference with running traffic.
4.5.1 The Contractor will be fully responsible for compliance of the various provisions under Contract
Labour Act, 1970 and the Rules framed there under.
Signature of Bidder Page 76 AMC
Ahmedabad Municipal Corporation
4.6 As per circular No. MGR 2176(96), 2418 (ii) Dt. 31.8.77 issued by the Government of Gujarat
contractors has to procure their quarry materials required for construction work through legal
sources i.e. only from the quarry lease holders permit holders or middle man who satisfies the
Contractor as to the legality of the source of purchase by him of these materials.
4.7 All defective works are liable to be demolished, rebuilt and defective materials replaced by the
Contractor at his own cost. In the event of such works being accepted by carrying out repairs etc
as specified by the Engineer in charge, the cost of repairs will be borne by the Contractor and will
be paid for the works actually carried out by him at reduced rates of the tendered rates, as may
be considered reasonable by the Engineer in charge in the preparation of final or on account bills.
4.8 Contractor is required to use his own national/international practices of tracing out or locate
these utilities below the ground at no cost to the Employer.
For Torrent power cables, Gas pipe line, Telecom cables, Street Lighting Board, pole, Cables,
Signal pole, if required to be shifted, AMC shall bear the charges or reimburse the contractor in
case he markets the payment to utility provider against the original receipt submitted by the
contractor. The contractor shall obtain necessary approvals from such authorities and also in case
where payments are not required to be made for such shifting. In all other cases of utility shifting
provisions of bid documents shall prevail.
Contractor shall obtain necessary permits/approvals from the respective Utility Provider/Owner
well in advance of starting the shifting work. The shifting works shall be carried out through the
approved / authorized sub contractor’s of the Utility providers without causing any inconvenience
to the utility users at large.
4.13 PUBLIC UTILITIES:
(a) The contractor shall be responsible to coordinate with service provider / concerned
authorities for shifting of utilities and removal of encroachments etc. and making the site
unencumbered from the project construction area required for completion of work. This shall
include initial and frequent follow-up meetings / actions / discussion with each involved service
provider / concerned authorities. The contractor will not be entitled to any additional
compensation for the delay in shifting of utilities and removal of encroachments by the service
provider / concerned authorities.
(b) The contractor shall make payments to the respective service provider/authorities for
shifting of utilities, wherever required. The Contractor will obtain necessary approvals from such
authorities and also in cases where payments are not required to be made for such shifting.
(c) Any utility likely to be affected by Contractor’s work should be brought to the notice of
the Engineer and such work shall be undertaken only after getting written clearance from the
(d) The Contractor may be required to carry out certain works for and on behalf of the
various bodies and the Contractor shall also provide, with the prior approval of the Engineer, such
assistance to the various bodies as may be authorized by the Engineer
Signature of Bidder Page 77 AMC
Ahmedabad Municipal Corporation
ITEM WISE SPECIFICATION
The specifications in general for this bridge are as per Road and building Department & MORTH
Specification (fifth revision). However for ready reference item wise specifications based on R & B
Department are given. In case of any ambiguity or discrepancy R & B Department specification & MORTH
specification shall govern.
Name of Work :- Construction of RCC Road at diff places of gamtal area and diff T.P.
Road in Sarkhej ward in South West Zone.
Item No.1 : Demolition including stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift. (I)R.C.C work.
Demolition including stacking of serviceable materials and disposal of unserviceable
materials with all lead and lift. (I)R.C.C work.
The rate shall be for a unit of one cmt.
Item No.2 : Extra rate over item of excavation of earth for excavation of asphalt pavement /
RCC of thickness up to 0.20 meter including demolishing the asphalt carpet,
metal,s oiling/cutting Reinforcement etc.comp. with stacking the material as
directed. (Based on Previously approved rate by C E sir ) a) up to 0.20 meter
thickness (By Manual) b) 0.20 to 0.30 meter (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, & transportation etc
complete. C) 0.30 meter & above (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, & transportation etc
Extra rate for excavation of asphalt pavement for thickness Upto 0.20 Meter including
demolishing the asphalt carpet, metal, soiling etc. complete by Manualy And For thickness
from 0.20 Meter to 0.30 Meter By Breaker Machine with stacking the materials as
directed. Cost of operator, Fuel, & Transportation Etc is Included for Asphalt Cutting By
Breaker Machine. The road surface of asphalt shall carefully be opened to full width as
directed by the Engineer in charge Asphalt, popada's spouls, metals etc shall be separately
deposited in such places as may be determined by the Engineer-in-charge. In case above
materials not being so deposited or being mixed up with the excavated materials will not
be allowed for refilling. The cost of materials shall be charged from the contractor. The
decision of the Addl.C.E. Shall be final and binding to the contractor.
The rate per sq.mt. in this item shall be paid extra addition to the rate for excavation
Mode of measurement: The rate shall be for a unit of Smt. Basis..
Signature of Bidder Page 78 AMC
Ahmedabad Municipal Corporation
Item No.3: Box cutting the read surface in all sorts of soil, murrum to proper slope &
camber for making a base for road work including removing the excavated stuff
& depositing on the road side as directed upto 50.00 mt. Lead.
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes or
any such ordinary excavating implement or organic soil, gravel, silt, sand turf loam, clay,
peat etc. falls under this category. For materials and workmanship for earthwork and
excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be followed.The depth
of the excavation shall be as per the item description.
Clearing the Site:
The site where the Development has to be carried out shall be cleared and all obstructions,
loose stones, materials and rubbish of all kind, bush; wood and all type trees shall be
removed, as directed.
The materials so obtained shall be the property of the Client and shall be conveyed and
stacked as directed, within 50-m. lead. The roots of the trees coming in the sides of the
trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest Authority /
Municipal Commissioner, before cutting shall be cut after obtaining such permission from
them. It shall be the Client's responsibility to obtain such permission from the respective
The rate of site clearance is deemed to be included in the rate of earthwork, for which no
extra will be paid.
After cleaning the site, the centerline of the central verge & other constructions will be
Engineer-in-charge. The Contractor shall assume full responsibility for alignment,
elevation and dimension of each and all parts of the work. Contractor shall supply labours,
materials, etc. required for setting out the reference marks and bench marks made of MS
angle iron and embedded in 1:2:4 CC.They shall maintain the same as long as required and
The excavation shall be carried out in true line and level and shall have the width and
depth, as shown in the drawings or as directed. The Contractor shall do the necessary
shoring and strutting or shall provide necessary slopes to a safe angle or steps, as required
or directed, at his own cost. No extra payment shall be made for such precautionary
measures, taken. The bottom of the excavated area shall be leveled both longitudinally and
transversely, as directed, by removing excess soil and watering, as required. No earth
filling will be allowed for bringing it to level, if by mistake or any other reason, excavation
is made deeper or wider than shown on the drawings or as directed. The extra depth or
width shall be made up with sand filling, as specified for the bottom level of the
subsequent finishing at the cost of the Contractor or as directed by Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision of
utility services, lighting the excavated areas, separating and stacking serviceable materials
Signature of Bidder Page 79 AMC
Ahmedabad Municipal Corporation
shoring, timbering, strutting, bailing out water either sub-soil or rainwater, including
stage of the work. Excavated areas shall be kept free of water while masonry or concrete or
relevant base works are in progress and till the Engineer-in-charge considers it necessary.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used in filling the excavated areas
wherever required inlayers, including ramming and watering, ensuring proper compaction
etc. complete.The Contractor shall remove the balance of the excavated quantity from the
site of work, to a place,as directed and for all lift.The lead is the shortest practical route
and not necessarily the route actually taken. The decision of Engineer-In-charge shall be
final in this regard.
Mode of Measurement and Payment:
The measurement of excavation of excavated area shall be made according to the sections
shown on the drawing or as per sections given by the Engineer-in-charge. No payment
shall be made for surplus excavation made in excess of above requirements or due to
stepping and sloping back as found necessary, on account of conditions of soil and
requirements of safety. The rate shall include for clearing the site, surface dressing, making
layout for road, fixing permanent grid points with MS iron posts, embedded in C.C. 1:2:4,
placed sufficiently away from the existing traffic lines and establishing bench marks
etc.The rates shall include for necessary shoring, timbering and strutting for protection of
sides of the excavated area, pumping out rain or surface water at any stage of construction
so as to keep the excavated area dry, to the satisfaction of the /Engineer-in-charge.
The rate shall include leveling and ramming the bottoms of excavations to receive
concrete, etc. including trimming to slope wherever necessary etc. complete.In filling clods
bigger than 50 mm. shall not be allowed. Only consolidated measurements of filling shall
be paid. Consolidation to be done by mechanical compactor as per relevant item.
Item No.4 : Conveyance charge of earth, lime, murrum, building rubbish, manual garbage,
sludge, excavated rock , fly ash, aggregate of any kind etc complete up to 5.0 KM
lead. e) Lead From 4 Km to 5 Km. f) Lead From 5 Km to 10 Km.
The surplus earth, which is left on site after refilling and proper watering of the
trenches, shall be carted away up to a distance within lead upon kmts. All surplus
earth should be carted away immediately after the instruction or orders of the engineer
in charge within 24 hours. The surplus earth shall be spread at the site shown where it
is carried. If the work is not carried out by the contractor as above AMC may carry
out the same at the risk and cost of contractor and the same may be deducted from the
dues to the contractor in any form.The measurement of the surplus earth shall be paid
Signature of Bidder Page 80 AMC
Ahmedabad Municipal Corporation
for as per arithmetical calculations. Nothing extra shall be paid for the bulk age of the
excavated earth.
The rate shall be for a unit of Cmt.
Item No.5 : Providing and laying cement concrete 1:3:6 (1- Cement : 3- Coarse sand : 6-
Hand broken stone aggregates 40mm nominal size) and curing complete.(R & B
SOR Item code 05003A, NBO 5.3.2 Page 73)
1.1 Water shall conform to M-1, Cement shall conform to M-3. Sand shall conform to M-6. Stone
aggregate 40 mm. Nominal size shall conform to M-12.
2.0 Workmanship :
2.1 The relevant specification of item No 5.3.2.(A) shall be followed for the work except that the
work is to be carried out in cement concrete 1:5:10.
3.0 Mode of measurement and payment :
3.1 The concrete shall be measured for its length, breadth and depth. Limiting dimensions to those
specified on plans or as directed.
The rate shall be for a unit of one cubic meter.
Item No.6 : Providing formwork of ordinary timber planking so as to give a rough finish
including centering, shuttering and propping etc. height of propping and
centering below supporting floor to ceiling not exceeding 4.00mt and removal of
the same for insitu reinforced concrete and plain concrete work
in(A)Foundations, footings, bases of columns etc. and mass concrete.
Providing formwork of ordinary timber planking so as to give a rough finish
including centering, shuttering and propping etc. height of propping and centering below
supporting floor to ceiling not exceeding 4.00mt and removal of the same for insitu
reinforced concrete and plain concrete work in(A)Foundations, footings, bases of columns
etc. and mass concrete.
The mode of measurement shall be on Smt basis.
Item No.7 : Providing and Casting in situ ordinary cement concrete M350 for R.C.C.
Raft and cutt off walls including necessary shuttering laying, vibrating,
ramming and curing complete.(B) Walls, fom top of foundation level upto floor
Signature of Bidder Page 81 AMC
Ahmedabad Municipal Corporation
Providing and Casting in situ ordinary cement concrete M350 for R.C.C. Raft
and cutt off walls including necessary shuttering laying, vibrating, ramming and curing
complete.(B) Walls, fom top of foundation level upto floor two level .
The rate shall be for a unit of one cubic meter.
Item No.8 : Providing TMT Bar FE500D reinforcement for R.C.C. Work including
bending,binding and placing in position complete upto floor two level
Providing TMT Bar FE500D reinforcement for R.C.C. Work including
bending,binding and placing in position complete upto floor two level (R & B Building
SOR 2021-22 Item No.05014C as per NBO-5.4.11 page no.49 Dist. AHMEDABAD
The mode of measurement shall be on Kg. basis.
Item No.09 : P/A trimix with dewatering machine and floater machine on constructed RCC
P/A trimix with dewatering machine and floater machine on constructed RCC work
The mode of measurement shall be on Smt. basis.
Item No.10 : Making 15 mm Groove on RCC work on road and finished it good include all
labour charges etc Comp as directed (approved rate)
Making 15 mm Groove on RCC work on road and finished it good include all
labour charges etc Comp as directed (approved rate).
The mode of measurement shall be on Rmt. basis.
Item No.11 : Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm
thick, M-35 Grade of any size ; shape (Usually Uni-Paver Blocks) using black
trap good quality aggragate of 20 mm nominal size for footpath, parking areas,
service lanes and other areas as mentioned in the drawing / instruction of
engineer in charge. Cost includes formworks using rubber mould, Rate
providing and laying paver blocks as per required grading and specification. The
paver block shall be mechanically compacted. The work of paving blocks
shall be executed in line and level by skill mason of flooring work only. It should
be laid in such a way that the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut by machine only and
carting. The finished surface of the paver block shall have resonably good, plain
finished. Paver blocks shall be compacted and shall be relaid if necessary. Gravel
Signature of Bidder Page 82 AMC
Ahmedabad Municipal Corporation
or such type of materials shall not be allowed for production. Laying on 5cms
thick sand beddding.(AMC approved Rate )
The scope of work includes manufacturing, supplying and laying of precast paver blocks at
various Retail outlets. The work includes :Verification of the existing site condition and
advising our project in charge to lay suitable base course if required.
Contractors are required to satisfy themselves with quality of sub grade, sub -base course
before the paver blocks are laid and suggest strengthening if required.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver
blocks.Manufacturing of paver blocks in your plant as per requirements in technical
specification enclosed.Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification, within shortest
possible time the site is public place hence care should be taken to ensure that the routine
activities shall not be disturbed. The job of laying may required to be carried out during
Testing of paver blocks through reputed Govt./Non Govt. Test house and submission of
test results as per requirements in Technical Specifications. AMC reserves the right to
carryout test at random. Cost for such tests to be borne by party.The contractor shall
guarantee that all material and components designed, fabricated, supplied and laid by him
shall be free from any type of defect due to faulty material and/or workmanship/erection
for a period of 5 year from the date of completion of work. However, the contractor
years shall render free mintenance.
TECHNICAL SPECIFICATIONS :
I) Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high
level of compaction by application of hydraulic compaction and also by high intensity
vibration to the moulds. The machine should have automatic control panel for uniformity
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete
ingredient should be mixed in concrete Batching & Mixing plant with minimum capacity
of 30 cum/hour. The plant should equipped with automatic control panel for maintaining
water cement ratio from batch to batch to obtain concrete of uniform quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw
materials into mixer and conveyor belt for transportation of concrete from mixer to
concrete block making machine to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver
1.4 Laboratory (Desirable but not essential) :
Signature of Bidder Page 83 AMC
Ahmedabad Municipal Corporation
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1). Systematic record of test results of various paver blocks manufactured in the factory.
(2). Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using
approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS”
with minimum colour pigment of 3% by weight of cement. The colour shade shall be “RED”
as selected by AMC before commencement of the work. White cement shall be used for
colored pavers to obtain the desired colour shade. The job also includes providing 50 mm
thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of
months from the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured
pavers will be as per attachment.
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the
same should be retained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted
sand filling after vibration on the paver S urface.
The concrete mix design should be followed for each batch of materials separately and
automatic batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying,
desired shape of the surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size
150mm X 250mm X 380mm. The kerbing should be embedded for 100mm depth. The
concrete used for kerbing shall be cured properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm Shape Unirregular (Uniform Shape with no Hollow Or Cracks) Uni, I
shape, tri hex or directed by Addl .C.E.
Chamfer 4mm to 6mm along top edges Colour Natural cement grey colour without use of
For coloured pavers refer “specifications for coloured pavers”
(+/-) 2mm for length & width,(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR.NO.* TEST SPECIFICATION Average Values (Average of Minimum Five
Signature of Bidder Page 84 AMC
Ahmedabad Municipal Corporation
1. Compressive Strength Min. 35 N/Sqmm for 60mm thick
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Content 380 Kg/Cum (Not Essential)
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks..
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be Min. 35 N/Sqmm.
Sampling of Paver blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than
blocks, shall be divided into ten approximately equal groups. Three blocks shall be drawn
from each group.Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the
designated section of part thereof, and the consignment represented by the sample, are
clearly defined. The sample shall be dispatched to the approved test laboratory taking
precaution to avoid damage to the paving in transit. Protect the paving from damage and
contamination until they have been tested. The testing shall be carried as soon as possible,
after the sample has been taken. As soon as practicable after sampling. The samples shall
be stored in water at 20 degree C ± 5 degree C for 24 hours prior to testing.
The mode of measurement shall be on Smt. basis.
Item No.12 : Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for
Footpath in M-20 grade using 20 mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork , mould with well equipped with vibratory system for kerb
stones of approved design including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include necessary cutting of asphalt,
fixing the Kerb stones in line and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the flush pointing in CM
(1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb
stone fixed with Bituminous concrete mixed in proper position as directed by
Engineer in change to form a portable mixture. In any case Gravel or such type
of materials shall not be allowed for production. (AMC approved Rate )a) Laying
on 5 cm thick Sand Bedding.
Trenches of specified width and depth shall first be mode along the edges of the
wearing course of the road or along the line of pave block flooring to receive the
restraint block.
Signature of Bidder Page 85 AMC
Ahmedabad Municipal Corporation
The bed of the trenches shall be compacted manually with steel rammers or a firm and
even surface and then stones shall be set in sand bedding
The edge restraint blocks shall be laid with their length running parallel to the paving
edge, true in line and gradient.
The joints of blocks shall be not more than to mm and filled with the CM 1:2 (1 cement
: 2 fine sand/) which shall be cured for 7 days.
The edge shall be restored and all surplus earth including rubbish etc. disposed off as
directed by the engineer in charges.
Length of the finished work shall be measured in running meter along the edge of the
paving correct to a cm. Rate The rate shall include the cost of the materials and labour
including stone of specified materials involved in all the operation described above.
The mode of measurement shall be on Rmt. basis.
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed /
Fair finish / texture finish kerb stones of approved make as per approved sample of any
size and any type. Kerbs shall be fixed on the foundation prepared as per approved
design. The rate shall also include for erecting and fixing the pieces in position for
complete kerb system with chamfered type of kerbs including necessary accessories of
kerb like radius kerbs, angles and quadrant kerbs, droplet kerbs etc. complete as per
drawing. Kerb shall be fixed as paper joint without any jointing material. However
cement mortar shall be provided at the backside of kerb stone joint. (Sample must be
approved) Cost of excavation, cutting , base , side filling shall includes as directed
engineer - incharge in above item description as per BOQ (b) 380 mm high Footpath
Material: (1) Water shall conform to M-1. (2) Cement shall conform to M-3.
(3) Sand shall conform to M-6. Stone aggregate shall conform to M-12 (5)
Pre cast kerb shall be of approved make and as per approvedsample.
1.0 Workmanship :
All Precast exposed/ fare finish/ texture finish kerb stones shall be of approved
make.Sufficient curing shall be done before placement of the same.
The method of transporting and placing the precast members shall be as approved by
theArchitect and Engineer-in-charge. Members shall be so transported that no
breakage orundue stresses are induced inthem.
The pits of the size 0.15 M in width and 0.23 M. in depth or as per site condition shall first
be excavated, true to line and level. The specifications for excavation shall be followed
as per relevant item.
The pits shall be filled with a layer of 0.15 M. thick lean concrete M15. The kerbs shall
be laid on existing PCC base in true line and plumb. The specifications for PCC work
shall be followed as per relevant item.
The rate shall also include for erecting and fixing the pieces in position for complete
Kerb systems with Chamfered type of kerbs including all type of necessary accessories
of kerb like Radius Kerbs, Angles and Quadrant Kerbs, inlet kerb etc complete as per
Signature of Bidder Page 86 AMC
Ahmedabad Municipal Corporation
The rate shall also include the flush pointing in CM (1:2) for all joints of
the kerb stones.
Mode of Measurement & Payment:
The rate shall include the cost of material and labour for fixing the kerb system including
laying, jointing and finishing but excluding the cost of excavation, bitumen cutting, base PCC, zari
filling with bitumen material.
The Measurement of the item shall be in Rmt basis.
Item No.14 : Labour work for fixing interlocking blocks / any kind of pavement on up to
50 mm thick sand bedding, leveling, watering and fixing in line & level as
well cleaning the site etc. comp. as directed
Specification as per Item No. 14 only work as mentioned in Abstract.
Item No.15 : Labour work of fixing Kerb any design of central verge, (both side) footpath
kurb, items includes necessary excavation, asphalt cutting of any thickness, erecting
in line and position and pointing with cement mortar (1:3), watering, etc complete,
filling with zari along the side of the kurb, the kurb stone fix prepared with
bitumnious top surface, as directed by engineer in charge.
Work shall be carried out as per item description including cost of all labour and materials etc.
complete as directed. General standard practice of laying of paver block is applicable.
The measurements shall be on SMT basis.
Item No.16 : Repairing damaged M.H. and rasing M.H. up to road level incl. removing
damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in
C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the
debris from MH and carting the same as directed.
(B) up to 0.35mt. (@ Four Coarse)
This item relates to repairing work of above item of machine hole with fixing existing
seat at top & fixing pre-cast FRC cover (medium duty) repairing up to 2.00 mt. depth. This
item relates to repairing existing machine hole of 1.40 x 1.00 or 1.00 x 0.75 mt. size with
removing first existing seat & cover including demolishing existing loose masonry work
up to from GF level to depth if specified & up to same height brick work in CM 1:5 shall
be completed & after of that work plastering work in CM 1:3 shall also be done. Rate
including fixing existing or new (if not there) C.I. steps shall fixed at time of masonary
work. After completion of brick work & plastering same machine hole seat & cover fixing
at top & casted it in C.C. 1:2:4 etc. Measurements shall be given on no. of basis up to
mt. depth work.
For detailed specification refer R & B Department booklet for General Technical Specification for building
Items also includes:
1. Proper Barricading to avoid accidents.
2. Removal of debris from site.
3. Compaction of Bitumen by Roller.
4. Applying tack coat before laying of Hotmix material.
Signature of Bidder Page 87 AMC
Ahmedabad Municipal Corporation
The mode of payment for this item shall be on No. Basis.
Item No.17 : Constructing Chamber of following size including excavation, refilling, BBCC
(1:5:10) for foundation, C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement slurry, Brick masonary in CM
1:5 & excluding the cost of chamber seat cover etc.completed.
a) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90 meter
Constructing Chamber of following size including excavation, refilling, BBCC
(1:5:10) for foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster
inside in CM 1:3, finishing with cement slurry, Brick masonary in CM 1:5 &
excluding the cost of chamber seat cover etc..completed. (Based on Drainage SOR
(A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia
<=150mm. (Drainage SOR 2009-10, P.H.E.Chamber, Item No.243 Page No. 63)
(B) 0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter for pipe dia <=230
mm (Drainage SOR 2009-10, P.H.E.Chamber, Item No.241 Page No. 63)
(C) Chamber seat cover (FRC) cover 706 x 556 x 50 mm rectangular cover frame size
600 x 450 mm clear opening outer size 816 x 666 x 100 mm
Mode of measurement:
The rate shall be for a unit of No. basis.
Item No.18 : Providing F.R.C. MH seat cover incl. carting to the work site etc. comp.
a) F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø
& 100 mm thick circular cover, 35.00 MT load design, 100x2mm MS flat allround,
16mm ø plain round bar for lifting the cover & should be fitted with plastic cups.
Frame : 560 mm ø clear opening, outer size- 888x888x175 mm. On the upper
periphery of frame 25 x 3 mm wide MS flat should be well embed in concrete to
protect the edges of frame. FRC E.H.D.-35 manhole cover & frame described as
d) F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm clear
opening, The dimension of frame and cover as per mentioned in Amend No.1 to IS
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed. (Based on rate of
(A)FRC heavy duty cover size 730 mm. & 90 mm thick circular cover 20 M.T. design load
and frame size 560 mm clear opening size 890 x 890 x 120 mm.
(B)FRC heavy duty cover size 730 mm. & 90 mm thick circular cover 20 M.T. design load and frame
size 560 mm clear opening size 890 x 890 x 120 mm.
Mode of measurement:
The rate shall be for a No. basis
Item No.19 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to
mt including excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at bottom and
15 mm thick cement plaster inside the catch pit in the proportion of CM (1:3)
with out jali etc. comp. as directed.
For detailed specification refer clause No. 24.44.1 of R & B Department booklet
for General Technical Specification for building works
Signature of Bidder Page 88 AMC
Ahmedabad Municipal Corporation
• Extra Depth of Catch pit size 600mm x 600mm for every additional depth of
mm or Part thereof beyond 1000mm depth upto 1500 mm depth
For detailed specification refer clause No.24.46 of R & B Department booklet for General Technical
Specification for building works.
Mode of measurement and payment
The contractor shall be responsible for any loss or damage to the catch pit up to the end
of work. He shall also be responsible for the cleaning all bituminous material from the
The rate shall be for a unit of one No.
Item No.20 CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x
600mm clear opening etc. comp.. As directed by engineer in charge.
For detailed specification refer clause No. 24.35 of R & B Department booklet forGeneral
Technical Specification for building works.
The contractor shall be responsible for any loss or damage to the catch pit up to
the end of work. He shall also be responsible for the cleaning all bituminous material
from the catch pit.
The rate shall be for a unit of one No.
Item No.21 Providing & Supplying ISI Standard RCC pipes (of sulphate resisting cement) in
a standard lengths of following class & dia meter suitable for socket-spigot type
including all taxes , insurance, transporation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to departmental stores, staking etc
complete (IS 458:1989) Class NP-3, test pressure 0.7/kg/sqcm. Rate also includes
supplying RCC collar for RCC pipes including taxes, carting, loading,
unloading, etc complete. Including labour work for lowering, laying, jointing,
RCC pipes in CM 1:1 1/2 of following diameters in proper position, grade and
alignent at all as directed by engineer in charge. (RCC pipe Horizontal cast)
a) 300 mm internal diameter
Providing & Supplying ISI Standard RCC pipes (of OP cement) in a
standard lengths of following class & dia meter suitable for socket-spigot type
including all taxes , insurance, transporation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to departmental stores, staking etc
complete (IS 458:1989) Class NP-3, test pressure 0.7/kg/sqcm. Rate also includes
supplying RCC collar for RCC pipes including taxes, carting, loading, unloading,
etc complete. Including labour work for lowering, laying, jointing, RCC pipes in
CM 1:1 1/2 of following diameters in proper position, grade and alignent at all as
directed by engineer in charge. inlcuding conveyance from store to site of work
labour giving hydraulic testing and all necessary testing as per IS code .(GWSSB
SOR-2022-23, page no:15, Item no:10.2.A & 10.3 & section part 1&2 B labour
section, item no:11.B) (RCC pipe Horizontal cast) 300 mm internal diameter
The mode of measurement shall be on Rmt. basis.
Item No.22 Hiring Charges For J.C.B.Machine Inclduing Cost Of Fuel, Operator, Dirver
For relevant Specification of Item as per item description & instruction of Engineer-in-
Charge and/or his authorized representative.
Mode of measurements shall be on HR basis.
Signature of Bidder Page 89 AMC
Ahmedabad Municipal Corporation
Item no.23 Hiring of Tractor with trolley considering 8 Hrs. As working Day hours inclu.
For relevant Specification of Item as per item description & instruction of Engineer-in-
Charge and/or his authorized representative.
Mode of measurements shall be on Day basis.
Item no 24 Constructing Slab type M.H. Chamber of the following size including excavation,
refilling, brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel
(1:2:4) of thickness 10 C.M., finished 15 mm thick cement plaster inside & outside
(Only for shaft) in CM 1:3, finishing with cement slurry, P/F 4 mm dia M.S.Steel
HDPE coated steps 35 cm c/c at 35 cm staggered in masonary CM 1:5, RCC Slab
in CC 1:1.5:3 of thickness 23 C.M., including Cantering & reinforcement (double
jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding the cost of Manholeseat
cover etc..completed. of Size 1.00 X 1.40 meter (Inside Clear,M.H. length
should be parallel to the flow, for pipe dia <= 800 mm)
Item No 25 Excavation for pipe line trenches for sewerage line, manhole etc all with shoring
and struting if required as per required gardient and line including safety
provisions using site railes and stacking excavated stuff including upto all
required lead cleaning the site etc. Complete for all leads and strata as
specified.(1) Excavation upto 1.5mt depth( In all sorts of soil and soft murrum),
(2)Excavation upto 1.5 to 3.0mt depth(In all sorts of soil and soft murrum)
Excavation for pipe line trenches for sewerage line, manhole etc all with shoring
and struting if required as per required gardient and line including safety provisions
using site railes and stacking excavated stuff including upto all required lead
cleaning the site etc. Complete for all leads and strata as specified. (GWSSB SOR-
2022-23, page no:32, section: 1& 2 B labour, Item no:1)
The mode of measurement shall be on Cmt. basis.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE
ITEMS (AS PER STANDARD P.W.D. TECHNICAL SPECIFICATIONS FOR THE
ITEMS AND ALSO I HAVE THE BOOK OF THE SAME ) AND AGREE TO ABIDE BY
THEM. INCASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY
ITEMS AVAILABLE ,SPECIFICATION GIVEN BY THE ENGINEER IN CHARGE
SHALL BE FOLOWED AND FOR THE
SAME I AGREE TO ABIDE BY THEM.
Signature of Bidder AMC
Signature of Bidder Page 90 AMC
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender no 41 Gamtal Rcc Road vol 1.pdf
Tender no 41 Gamtal Rcc Road vol 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .