| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.8 CrRejected-Finance | ₹1.8 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹2.1 CrRejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹2.1 Cr | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | M/S RAJENDRA SINGH YADAV L1 | M/S BADRI SINGH L3 | S.B. ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00Earth work in excavation of foundation in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | ||||||
| 1.01 | Soft rock/soil | 1,029.6 | m3 | 79 ₹81,338.40 | 80 ₹82,368 | 86 ₹88,545.60 |
| 1.02 | Hard rock | 742.5 | m3 | 352 ₹2.6 L | 390 ₹2.9 L | 286 ₹2.1 L |
| 2.00 | Laying C.C. 1:3:6 (M–10) in foundation with cement, coarse sand FM not less than 2.0 and hard stone ballast of size 20 to 40 mm. including cost of all material, labour, T&P etc. required for proper completion of work. | 290.25 | m3 | 2,655 ₹7.7 L | 3,600 ₹10.4 L | 3,286 ₹9.5 L |
| 3.00 | Centering and shuttering for R.C.C. work including all cost of labour charges, T&P etc. required for proper completion of work. | 1,335.97 | m2 | 609 ₹8.1 L | 490 ₹6.5 L | 486 ₹6.5 L |
| 4.00 | Providing and laying M-20 (1:1.5:3) for R.C.C work with cement, coarse sand FM not less than 2.0 and stone grit of size 4.75mm to 20mm by Mechanical mixing, compaction by vibrator with all materials, labour, T&P etc. required for proper completion of work. | 1,046.94 | M3 | 3,881 ₹40.6 L | 5,400 ₹56.5 L | 5,286 ₹55.3 L |
| 5.00 | Cutting, Bending, Binding and placing of reinforcement including all cost of material ,labour charges T&P etc. required for proper completion of work. | 123.28 | MT | 51,917 ₹64.0 L | 70,000 ₹86.3 L | 60,000 ₹74.0 L |
| 6.00 | S/L P.V.C. Pipe in weep hole 50 mm Ø including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. @2.50 m c/c | 32.4 | RM | 70 ₹2,268 | 80 ₹2,592 | 86 ₹2,786.40 |
| 7.00 | Laying and fixing joint filler board/coir soaked with bitumen in seal gap 18 mm thick including cutting, placing, all cost of material, labour charges T&P etc. required for proper completion of work. | 78.37 | m2 | 747 ₹58,542.39 | 700 ₹54,859 | 886 ₹69,435.82 |
| 8.00 | Bore hole drilling for 60 cm dia pile including all cost of labour, T&P etc. required for proper completion of work. | 52.5 | RM | 2,223 ₹1.2 L | 3,000 ₹1.6 L | 2,586 ₹1.4 L |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
27 Jan 2026, 2:00 pmClosed
Superintending Engineer, B S C C C-2 Mzp
Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Protection work at confluence point of constructed escape channel at Km. 27.600 of B.S.F.C.
2026_UPIDC_1106192_1
07/SE/2025-26
Open Tender
Civil Works
240 days
Sidhi, MP
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹4.7 L
18 Mar 2026
14 Jan 2026
27 Jan 2026
14 Jan 2026
27 Jan 2026
15 Jan 2026
Earth work in excavation of foundation in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work.
Soft rock/soil
Hard rock
Laying C.C. 1:3:6 (M–10) in foundation with cement, coarse sand FM not less than 2.0 and hard stone ballast of size 20 to 40 mm. including cost of all material, labour, T&P etc. required for proper completion of work.
Centering and shuttering for R.C.C. work including all cost of labour charges, T&P etc. required for proper completion of work.
Providing and laying M-20 (1:1.5:3) for R.C.C work with cement, coarse sand FM not less than 2.0 and stone grit of size 4.75mm to 20mm by Mechanical mixing, compaction by vibrator with all materials, labour, T&P etc. required for proper completion of work.
Cutting, Bending, Binding and placing of reinforcement including all cost of material ,labour charges T&P etc. required for proper completion of work.
S/L P.V.C. Pipe in weep hole 50 mm Ø including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. @2.50 m c/c
Laying and fixing joint filler board/coir soaked with bitumen in seal gap 18 mm thick including cutting, placing, all cost of material, labour charges T&P etc. required for proper completion of work.
Bore hole drilling for 60 cm dia pile including all cost of labour, T&P etc. required for proper completion of work.
Carriage and Laying stone(weight not less than 40 kg.)for pitching in R/S slope of canal including all cost of material labour charges T&P etc.required for proper completion of work. u/s in Retaining wall
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
Tender_Document_07.pdf
Tender Documents • 5.34 MB
BOQ_2040930.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid