Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.4 L+₹18,479.90 (8.53%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.5 L+₹36,721.35 (16.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹3.0 L
EMD Value
₹5,960
Closing Date
11 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
Improvement of EIDGAH PARK near Eidgah At Johama , SECHEME ADF
2026_RDPR_319571_19
184/Xen/Rew/Bla/2026-27 Dated 05/08/2026
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹5,960
28 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
11 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. | 6.42 | Cum | 256.85 | ₹1,648.98 |
| 2 | P/L of dry stone soling duly handpacked including all types of carriages | 4.89 | Cum | 960 | ₹4,694.4 |
| 3 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.96 | Cum | 9,821 | ₹48,712.16 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 40mm nominal size aggregate.with 20% Plum | 4.75 | Cum | 5,733.6 | ₹27,234.6 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 infoundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 6.45 | Cum | 9,027.2 | ₹58,225.44 |
| 6 | Centering and Shuttering etc and removal of formwork | 13.6 | SqMtr | 286 | ₹3,889.6 |
| 7 | Centering and Shuttering etc and removal of formwork SLAB | 19.93 | SqMtr | 577.5 | ₹11,509.58 |
| 8 | 12mm Plaster in 1:4 mix | 50.2 | SqMtr | 283.8 | ₹14,246.76 |
| 9 | Providing and laying vitrified floor tiles/wall tiles in different sizes 600 mmx1200 mm (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete | 25.9 | SqMtr | 1,395.1 | ₹36,133.09 |
| 10 | Flooring with marble stone of specified thickness as per sample of marble approved by Engineer-in-charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement:4 coarse sand) laid and jointed with grey cement slurry including rubbing, polishing ,moulding and curing complete.18 mm Thick | 5.2 | SqMtr | 2,123 | ₹11,039.6 |
stage.html
html • 0.02 MB
finance_1059158.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1059158.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .