Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | ₹3.7 L Quoted ₹3.1 L | L1 | Accepted-AOC DUE TO L1,Work is awarded as per observing all formalities |
| 2 | L2₹4.4 LRejected-Finance AT UPPER KULHI P O JHARIA DIST DHANBAD | JHARIA | DHANBAD | ₹4.4 L | L2 | Rejected-Finance DUE TO L2 |
| 3 | L3₹4.5 LRejected-Finance | ₹4.5 L | L3 | Rejected-Finance DUE TO L3 |
| Sl No | Description | Qty | Unit | JAISWAL ENTERPRISES L1 | KIRAN TRADING AND ENGG WORKS L3 | BRIGHT ENGG WORKS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Shaft Sleeve (DE) SS | 1 | No | 24,000 ₹24,000 | 42,000 ₹42,000 | 39,000 ₹39,000 |
| 2.00 | Shaft Sleeve (NDE) SS | 1 | No | 21,000 ₹21,000 | 38,000 ₹38,000 | 36,500 ₹36,500 |
| 3.00 | Neck Ring GM | 3 | No | 6,100 ₹18,300 | 5,600 ₹16,800 | 8,100 ₹24,300 |
| 4.00 | Neck Bush GM | 2 | No | 5,100 ₹10,200 | 9,000 ₹18,000 | 7,500 ₹15,000 |
| 5.00 | Impeller Ist Stage | 1 | No | 24,100 ₹24,100 | 42,000 ₹42,000 | 8,500 ₹8,500 |
| 6.00 | Diffuser 2nd Stage | 1 | No | 21,250 ₹21,250 | 23,000 ₹23,000 | 36,500 ₹36,500 |
| 7.00 | Both Side Bearing (GM) | 2 | No | 41,000 ₹82,000 | 46,500 ₹93,000 | 34,500 ₹69,000 |
| 8.00 | Balance Valve | 1 | No | 21,250 ₹21,250 | 49,000 ₹49,000 | 56,000 ₹56,000 |
| 9.00 | Balance Sitling Bush | 1 | No | 21,200 ₹21,200 | 20,500 ₹20,500 | 31,500 ₹31,500 |
| 10.00 | Shaft welding, machining allingment & thread cutting both side barring | 1 | Job | 17,500 ₹17,500 | 25,000 ₹25,000 | 35,600 ₹35,600 |
Tender Value
₹4.4 L
EMD Value
₹5,600
Closing Date
16 Mar 2026, 11:00 amClosed
Project Engineer (EnM), Tapin North OCP, Hazaribag
Tapin North OCP, Hazaribagh Area
Repairing rectification and full overhauling with spares of 3 CHR, Pluro III, 1000 GPM, 150MH, MnP make pump assembly of Tapin North open cast Project Hazaribagh Area.
2026_CCL_355228_1
PE(EnM)/TNOCP/Tender/25-26/38
Open Tender
Electrical and Maintenance Works
10 days
Tapin North OCP, Hazaribagh Area
PLEASE REFER TENDER DOCUMENTS.
2 documents required · 2 mandatory
₹5,600
26 Mar 2026
2 Mar 2026
17 Mar 2026
3 Mar 2026
16 Mar 2026
3 Mar 2026
3 Mar 2026 - 10 Mar 2026
Shaft Sleeve (DE) SS
Shaft Sleeve (NDE) SS
Neck Ring GM
Neck Bush GM
Impeller Ist Stage
Diffuser 2nd Stage
Both Side Bearing (GM)
Balance Valve
Balance Sitling Bush
Shaft welding, machining allingment & thread cutting both side barring
Distance bush
O Ring
Lalten Ring
Oil Ring (GM)
Shaft Check Nut SS
Sturd with Nut 32 mm for Stpin box HT
Repairing of 2nd & 3rd Impeller
Pump opening & fitting , cleaning, paintiong
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_368072.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid