| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Ist₹5.2 CrAccepted-AOC LUCKNOW 226010 | LUCKNOW | UTTAR PRADESH | 226001 | ₹5.2 Cr | Ist | Accepted-AOC Ist Lowest |
| 2 | IInd₹8.6 CrRejected-AOC | ₹8.6 Cr | IInd | Rejected-AOC High Rate |
| 3 | IIIrd₹9.2 CrRejected-AOC | ₹9.2 Cr | IIIrd | Rejected-AOC High Rate |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
28 Feb 2024, 3:00 pmClosed
E.E.
E.E. Office Bareilly
Engineering, Procuring, Construction, Commissioning (EPC) by Five years Operation and maintenance work for 5 years of sewerage treatment plant 2 MLD Capacity based on Sequential Batch Reactor (SBR) Technology under Lohia Vihar Yojna, Bareilly
2024_BDAUP_882968_1
T-02/2024/1
Open Tender
Civil Works - Others
Item Rate
365 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
Vice Chairman, Bareilly Development Authority
₹1.3 L
22 Jun 2024
20 Jan 2024
28 Feb 2024
20 Jan 2024
28 Feb 2024
20 Jan 2024
Amount
(A)Survey, Investigation, Design, Supply, Construction, Installation, Testing and Commissioning of 2.00 MLD STP on SBR Technology including Preliminary treatment of waste water/ raw sewage, secondary treatment, tertiary treatment (if required to achieve treated effluent parameters as per tender documents), Sludge handling, outfall sewer, treated water pumping if required to dispose into river, required buildings, earth filling, site development, Boundary wall for complete campus of 2.4 Hectare & allied works in an odour free environment as per scope of bid document and 2 year DLP for E/M works that shall include but not limited to getting NOC from different departments, vetting of design drawing from IIT, third party testing of influent, treated effluent, sludge, & other related works. Note – In case of technology Provider, Technology provider Must have Register office in India (B) Survey, Investigation, Design, Supply, Construction, Installation, Testing and Commissioning of 2.00 MLD MPS with civil and E&M work as per tender documents, with,reciving chamber , Coarse screen chanel , , wett well required buildings, earth filling, site development with one year of Defects Liability Period for civil works and 2 year DLP for E/M works that shall include but not limited to getting NOC from different departments, vetting of design drawing from IIT & other related works.
Description of Work / Item(s)
Amount
Operation and maintenance work for 5 years of sewerage treatment plant 2 MLD capacity based on “Sequential Batch Reactor (SBR) Technology under Lohia Vihar Yojna”, Bareilly (maintenance work to be start after 2 years defect removal period with separate agreement before last date of defect removal period.)
Rohanta Infra Solutions
Rohtash Kumar Contractor
Rohanta Infra Solutions
Rohtash Kumar Contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .