Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.9 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.0 L+₹5,061.15 (2.60%)Rejected-AOC | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SABU K.S. L2 | P K MURALIDHARAN NAIR L1 |
|---|---|---|---|---|---|
| 1.00Canal maintenance | |||||
| 1.00 | 60.63.1:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers. | 3.15 | metre | 2,349.4 ₹7,400.61 Lowest | 2,360.34 ₹7,435.07 |
| 1.00 | 60.63.2:FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers. | 0.54 | sqm | 21,846.71 ₹11,687.99 | 21,832.83 ₹11,680.56 Lowest |
| 1.00 | 60.4:Locking Arrangements - Supplying and Fixing lock and locking arrangements with suitable chain hooks,and padlock of 65mm size. | 2 | each | 888.53 ₹1,777.06 | 874.79 ₹1,749.58 Lowest |
| 1.00 | OD26772/2025-2026:Engaging coolie for slab removal and putting back | 6 | each | 1,022.23 ₹6,133.38 | 1,004.26 ₹6,025.56 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.34 | cum | 8,724.3 ₹20,414.86 | 8,543.27 ₹19,991.25 Lowest |
| 1.01 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 42 | sqm | 53.38 ₹2,241.96 | 52.38 ₹2,199.96 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 90 | sqm | 349.28 ₹31,435.2 | 340.17 ₹30,615.3 Lowest |
| 1.01 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 4.5 | cum | 2,401.17 ₹10,805.27 | 2,336.09 ₹10,512.41 Lowest |
| 1.01 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 2.7 | cum | 5,832.28 ₹15,747.16 | 5,668.04 ₹15,303.71 Lowest |
Tender Value
₹2.1 L
EMD Value
₹5,285
Closing Date
23 Oct 2025, 5:00 pmClosed
Assistant Executive Engineer
Minor Irrigation Sub Division, Mini Civil Station, IInd Floor, Aranmula
GENERAL-MI PTA - AMC 2025-26 - PANCHAVADI-Annual Civil Maintenance of Panchavadi LI Scheme for the year 2025-26 under MI section Maramon-General Civil Work
2025_Irrig_810798_1
IRR/IA/TR/4170/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Puramattom
Please see the tender documents
7 documents required · 7 mandatory
₹555
Yes
₹5,285
Yes
14 Nov 2025
16 Oct 2025
25 Oct 2025
16 Oct 2025
23 Oct 2025
16 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1353489.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1353489.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .