Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC VILL P O RUDRANAGAR P O SAGAR SOUTH 24 PARGANAS | SAGAR | SOUTH 24 PARGANAS | WEST BENGAL | ₹7.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.4 L+₹7,647.49 (1.05%)Rejected-Finance VILL P O RUDRANAGAR P S SAGAR SOUTH 24 PARGANAS | SOUTH 24 PARGANAS | WEST BENGAL | ₹7.4 L+₹7,647.49 (1.05%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.4 L+₹14,930.81 (2.05%)Rejected-Finance KRISHNANAGAR SAGAR SOUTH 24 PARGANAS PIN 743373 | SAGAR | SOUTH 24 PARGANAS | WEST BENGAL | 743373 | ₹7.4 L+₹14,930.81 (2.05%) | L3 | Rejected-Finance L3 |
Tender Value
₹7.3 L
EMD Value
₹14,567
Closing Date
10 Feb 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, KAKDWIP IRRIGATION DIVISION
Irrigation Waterways Directorate Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas
M/R to 3 ( three ) nos sluice ( Naren das, Rush pur and Netra Mohan sluice ) at Mouza-Khan saheb abad, Gangasagar and Mahishmari under Sagar ( I ) SUB-Division of Kakdwip ( I ) Division
2026_IWD_996384_20
WBIW/EE/KIDIVISION/e-NIT- 18 (e)/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
SAGAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹14,567
Yes
26 Aug 2026
3 Feb 2026
11 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement
concrete plain or reinforced, stacking serviceable
materials at site and removing rubbish as directed
within a lead of 75 m
a) In ground floor including roof | - | Cum. | 532.73 | - |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.
(b) above 150 mm. thick | 1 | Cum. | 1,688.78 | ₹1,687.09 |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | - | % Cum. | 22,927.85 | - |
| 4 | Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD. | - | Mtr | 7,285.52 | - |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety | 1 | Cum. | 9,876.25 | ₹9,866.37 |
| 6 | Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor | - | Cum. | 9,043.75 | - |
| 7 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | - | Sqm. | 22.64 | - |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course,scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(ii) With 1:4 cement mortar
(a) 20 mm thick plaster | - | Sqm. | 292.97 | - |
| 9 | Neat cement punning about 1.5 mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. | - | Sqm. | 50.72 | - |
| 10 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
(ii) 15 cm av. Diameter | - | Metre | 310.34 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
Tendernotice_2.pdf
PDF • 1.01 MB
BOQ_2438743.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .