Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.1 LAccepted-AOC KOTOHA NEWJAN GAON KOTOHA NEWJAN GAON KOTOHA NEWJAN GAON KOTOHA NEWJAN GAON DIBRUGARH ASSAM 785676 | DIBRUGARH | ASSAM | 785676 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹38.3 L+₹2.2 L (5.97%)Rejected-Finance C O M KHARKARANG LUMJINGSUK BLOCK A MADANRTING SHILLONG 793021 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793021 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹42.4 L+₹6.3 L (17.5%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹45.2 L+₹9.1 L (25.2%)Rejected-Finance 7TH MILE P O NONGLYER UPPER SHILLONG 793002 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793002 | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹47.1 L+₹11.0 L (30.4%)Rejected-Finance 7TH MILE UPPER SHILLONG P O NONGLYER SHILLONG 793009 MEGHALAYA | EAST KHASI HILLS | MEGHALAYA | 793009 | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | M/S BISWA CONSTRUCTION L6 | M/s M.L Consortium L3 | Bhuiya Construction L2 | S K ENTERPRISE L5 | madan enterprise L4 | PRIDIB INFRATECH PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Material and labour for grass removal, excavation, surface preparation and grass laying-Cricket fileld as under mentioned scope:
(a) Development of required manpower, tools and machinery (i.e. Grass cutter machine, excavator, roller etc.)
(b) Cleaning of debris of any foreign material before starting grass removal.
(c) Removal of existing grass from the field
(d) Stacking or disposing of the removed grass outside the playing area as per instruction by the Engineer-In-Charge and also removal the grass from root level to avoid re-growth.
(e) Excavation of soil up to 15 cm depth and disposal as per instruction of Engineer-In-Chage and ensuring uniform depth to maintain uniform level playing surfaces.
(f) Surface preparation including levelling, dressing and compacting.
(g) Supply and spreading of screened topsoil before grass laying.
(h) Supplying healthy , fresh and well rooted (grass type: Bermuda, Doob grass)
(j) watering and rolling grass after laying as per direction of Engineer-In-Charge.
(k) fertilizer application as per direction of Engineer-In-Charge.( only if specified or required)
(l) Contractor shall maintain the grass for six month after physical date of completion like watering, fertilization and removal of weeds etc. | 6,957.5 | Sqm | 700 ₹48,70,250 | 610 ₹42,44,075 | 550 ₹38,26,625 | 676.8 ₹47,08,836 | 650 ₹45,22,375 | 519 ₹36,10,942.5 Lowest |
Tender Value
₹43.6 L
EMD Value
₹87,200
Closing Date
12 Dec 2025, 6:00 pmClosed
GE I AF SHILLONG
GE (I) (AF) Shillong Elephant Falls Camp PO Nonglyer Shillong-793009
UPGRADATION OF SPORTS GROUND AT AF STATION LAITKOR PEAK UNDER GE (I) (AF) SHILLONG
2025_MES_740938_1
8083/25/E8
Open Tender
Civil Works
Item Rate
180 days
GE I AF SHILLONG
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE I AF SHILLONG
₹87,200
Yes
12 Jan 2026
21 Nov 2025
15 Dec 2025
21 Nov 2025
12 Dec 2025
5 Dec 2025
Amount
Material and labour for grass removal, excavation, surface preparation and grass laying-Cricket fileld as under mentioned scope: (a) Development of required manpower, tools and machinery (i.e. Grass cutter machine, excavator, roller etc.) (b) Cleaning of debris of any foreign material before starting grass removal. (c) Removal of existing grass from the field (d) Stacking or disposing of the removed grass outside the playing area as per instruction by the Engineer-In-Charge and also removal the grass from root level to avoid re-growth. (e) Excavation of soil up to 15 cm depth and disposal as per instruction of Engineer-In-Chage and ensuring uniform depth to maintain uniform level playing surfaces. (f) Surface preparation including levelling, dressing and compacting. (g) Supply and spreading of screened topsoil before grass laying. (h) Supplying healthy , fresh and well rooted (grass type: Bermuda, Doob grass) (j) watering and rolling grass after laying as per direction of Engineer-In-Charge. (k) fertilizer application as per direction of Engineer-In-Charge.( only if specified or required) (l) Contractor shall maintain the grass for six month after physical date of completion like watering, fertilization and removal of weeds etc.
Bhuiya Construction (BID ID -3501371)
M/s M.L Consortium (BID ID -3499210)
madan enterprise (BID ID -3502812)
S K ENTERPRISE (BID ID -3502721)
M/S BISWA CONSTRUCTION (BID ID -3493960)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tender8083.pdf
Tender Documents • 0.65 MB
BOQ_829671.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .