NHPC Limited
Subansiri Lower Project-NHPC
Tech Rejected
River bank protection erosion control measures on the Right bank of River Subansiri adjacent to village Haridash goan Beyond 30km
NHPC Limited Subansiri Lower HE Project Gerukamukh | Dhemaji, AssamAOC Updated 25 Aug 2026
CPPP
AOC
CPPP
AOC
Est₹5.6 CrEst
₹5.6 Cr
M/s PRIDIB INFRATECH PRIVATE LIMITED
Tech Rejected
L1
This company
M/s PRIDIB INFRATECH PRIVATE LIMITED
Tech Rejected