Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance | ₹10.0 L | L1 | Admitted-Finance |
| 2 | L2₹10.0 LAdmitted-Finance LOCATION UTTARAKHAND UT | ₹10.0 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | - | - | Not Admitted-Fee/PreQual/Technical Others-Offline/physically tender not submitted |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | AAMFD5429L L1 | AJAY KUMAR CHAUHAN L2 |
|---|---|---|---|---|---|
| 1.00SUPPLY | |||||
| 2.00 | LT clamp SP-21 with N&B | 400 | Nos | 194 ₹77,600 | 195 ₹78,000 |
| 3.00 | Stay clamp for SP-21 with N&B | 70 | Nos | 203 ₹14,210 | 205 ₹14,350 |
| 4.00 | Shackle Insulator 75x90mm with N&B | 400 | Nos | 59 ₹23,600 | 61 ₹24,400 |
| 5.00 | Stay Insulator | 70 | Nos | 22 ₹1,540 | 25 ₹1,750 |
| 6.00 | Excavation of pit for stay set | 30.24 | CBM | 298 ₹9,011.52 | 299 ₹9,041.76 |
| 7.00 | Errection of LT stay set | 70 | Nos | 549 ₹38,430 | 555 ₹38,850 |
| 8.00 | Excavation of pit for pole | 106.4 | CBM | 308 ₹32,771.20 | 309.1 ₹32,888.24 |
| 9.00 | Errection of single SP-21 pole | 140 | Nos | 674 ₹94,360 | 675.9 ₹94,626 |
| 10.00 | Dismantling of SP-21/23 single pole | 140 | Nos | 1,174 ₹1.6 L | 1,175 ₹1.6 L |
Updated dates
Tender Value
₹10.0 L
EMD Value
₹30,000
Closing Date
16 Jan 2026, 4:00 pmClosed
EE,EDD,Ranikhet
EDD,Ranikhet
Replacment of damaged 140 No. damaged ST poles under Bagwalipokhar section under EDSD, Dwarahat
2025_UPCL9_89530_1
08/2025-26EDD(R)
Open Tender
Electrical Works
60 days
Ranikhet
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE
₹30,000
3 Feb 2026
8 Dec 2025
17 Jan 2026
8 Dec 2025
16 Jan 2026
8 Dec 2025
LT clamp SP-21 with N&B
Stay clamp for SP-21 with N&B
Shackle Insulator 75x90mm with N&B
Stay Insulator
Excavation of pit for stay set
Errection of LT stay set
Excavation of pit for pole
Errection of single SP-21 pole
Dismantling of SP-21/23 single pole
Laying of 2P 3W LT line (weasel)
Cartage of SP-21/23 pole,100-150 Km
Cartage of petty material, 71-100 Km
Cartage of petty material, 100-150 Km
Head load cartage of SP-21/23 pole(1-3 km)
Head load cartage of material(1-3 km)
Compatibility Report for 140poles.xls
Run on 12/5/2025 14:13
The following features in this workbook are not supported by earlier versions of Excel. These features may be lost or degraded when you save this workbook in an earlier file format.
Significant loss of functionality
Any effects on this object will be removed. Any text that overflows the boundaries of this graphic will appear clipped.
'BoQ1'!A1:II32
Minor loss of fidelity
Some formulas in this workbook are linked to other workbooks that are closed. When these formulas are recalculated in earlier versions of Excel without opening the linked workbooks, characters beyond the 255-character limit cannot be returned.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
BOQ_106151.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid