Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-Finance | L1 | Accepted-Finance ACCEPT | |
| 2 | L2₹18.9 L+₹46,020 (2.50%)Accepted-Finance | L2 | Accepted-Finance ACCEPT | |
| 3 | L3₹19.8 L+₹1.4 L (7.50%)Accepted-Finance 0 VILLAGE CHAMPANER NAGLA BALLAM POST SANTOSHPUR GHAT ETAWAH UTTAR PRADESH 206253 | ETAWAH | UTTAR PRADESH | 206253 | L3 | Accepted-Finance ACCEPT |
Tender Value
₹15.6 L
EMD Value
₹15,600
Closing Date
11 Apr 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC ETAWAH
HYDEL COLONY STATION ROAD ETAWAH
METER INSTALLATION
2022_DVVNL_684947_1
01/EDCE/2022-23
Open Tender
Manpower Supply
Item Wise
365 days
EDD IInd ETAWAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
DVVNL.ORG
₹15,600
1 Aug 2022
6 Apr 2022
12 Apr 2022
6 Apr 2022
11 Apr 2022
6 Apr 2022
90 days
Safe Carriage of 3 Phase LT meter with box from store centre to concerning Test Lab & Test Lab to work site with loading and unloading at both respective ends. (Approx distance 0 to 50 kms)
A) Installtion of 3 Phase LT meter of PTW connection at appropriate outside location and height (at least 5 feet), than connecting the meter with HT/LT distribution network/line and consumer's cut out/electrical fitting work includes proper completion and submission of sealing certificate to the concern supervisory engineer with the pre and post work photograhps and entry of meter advise in billing data by providing meter advise report in prescribed M.S. excel format and conversion consumers to MU base billing. B) Review of connection for confirming MU base billling after 10-15 days of meter installation as per billing parameter and providing meter reading in KWH and maximum demand (MD) in M.S. Excel format. NOTE :- The Contractor will have to arrange all concern items, such as clamp, nut & bolts, Tape, M-Seal etc. for the metering work and submitting the data in M.S. Excel to A.E. (M), EE(Test) for making MU Billing. Payment shall be made after issu of frist MU Bill.
MS BUILDERS AND SERVICES
M/s Radha Krishan
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .