| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75,962.82Accepted-AOC CHERUVATHUR VILLAGE AE LID AND EW SECTION TRIKARIPUR GRAMA PANCHAYATH | L1 | Accepted-AOC L1 | |
| 2 | L2₹76,409.56+₹446.74 (0.59%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | DILIPKUMAR T P L2 | VASANTHKUMAR K P L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF TOILET | |||||
| 1.00 | OD295131/2025-2026:Demolishing Laterite work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-Charge.
In cement mortar | 0.99 | cum | 2,103.81 ₹2,093.29 | 2,003.63 ₹1,993.61 Lowest |
| 1.00 | 15.13.1:Taking out doors, windows and clerestory window shutters (steel or wood ) including stacking within 50 metres lead:Of area 3 sq. metres and below | 2 | each | 139.52 ₹279.04 Lowest | 139.52 ₹279.04 Lowest |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 7.91 | sqm | 71.37 ₹564.54 Lowest | 71.37 ₹564.54 Lowest |
| 1.00 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 11.97 | sqm | 53.16 ₹636.33 Lowest | 53.16 ₹636.33 Lowest |
| 1.00 | OD295141/2025-2026:Laterate masonry with Department Supplied laterate stone of size 35x20x20cm or nearest size in cement<br>mortar 1:6 for foundation and basement including all cost of materials, labour charges etc | 0.6 | cum | 3,456.88 ₹2,063.76 Lowest | 3,456.88 ₹2,063.76 Lowest |
| 1.01 | OD295144/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest size in cement mortar 1:6 for Super Structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 1.06 | cum | 6,875.86 ₹7,288.41 | 6,548.44 ₹6,941.35 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.13 | cum | 12,645.57 ₹1,618.63 Lowest | 12,645.57 ₹1,618.63 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 1.27 | sqm | 717.68 ₹915.04 Lowest | 717.68 ₹915.04 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 12.75 | kilogram | 105.76 ₹1,348.44 Lowest | 105.76 ₹1,348.44 Lowest |
Tender Value
₹75,963
EMD Value
₹1,899
Closing Date
4 Oct 2025, 11:40 amClosed
SUMESH KUMAR P
Assistant Engineer LID and EW Section Cheruvathur Grama Panchayat
P No 182 - CONSTRUCTION OF TOILET FOR ASSISTANT ENGINEERS OFFICE
2025_LSGD_802417_6
DB1/TN(04)/2025-26
Open Tender
Civil Works - Buildings
Item Rate
CHERUVATHUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,899
Yes
10 Nov 2025
26 Sept 2025
7 Oct 2025
26 Sept 2025
4 Oct 2025
26 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1333512.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .