Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
27 Aug 2026, 6:00 pm3d left
Executive Engineer
Office Of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_320944_9
70 REW Samba of 2026-27, Dated 14.08.2026
Open Tender
Civil Works
Percentage
30 days
Nud
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW samba
₹3,000
14 Aug 2026
14 Aug 2026
28 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth lead upto 25m in All kinds of soil | 9.35 | no's | 256.85 | ₹2,401.55 |
| 2 | P/L of C.Conc. Of specified grades excluding cost of shuttering in 1:5:10 C.conc. 20 mm stone aggregates. | 1.87 | cum | 4,826.5 | ₹9,025.56 |
| 3 | 1:3:6 with , 20mm stone agg. | 9.8 | cum | 5,733.6 | ₹56,189.28 |
| 4 | Supply & dumping of stone on horizontal incl. cost of stone. | 4.2 | cum | 700 | ₹2,940 |
| 5 | (1:1.5:3) reinforced c.conc. excl. cost of shuttering & reinforcement | 2.59 | cum | 9,821.85 | ₹25,438.59 |
| 6 | Centering and shuttering incl. Propping and removal of same in Foundation Footings | 30.86 | sqm | 286.35 | ₹8,836.76 |
| 7 | Centering and shuttering incl. Propping and removal of same in Slab | 4.46 | sqm | 718.2 | ₹3,203.17 |
| 8 | Centering and shuttering incl. Propping and removal of same inLintel and beams | 2.23 | sqm | 577.55 | ₹1,287.94 |
| 9 | Centering and shuttering incl. Propping and removal of same in Edges of slab | 11.59 | rmt | 262.2 | ₹3,038.9 |
| 10 | Reinforcement for RCC work incl. cutting, bending , binding etc. all | 233.2 | kg | 123.2 | ₹28,730.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_1069093.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].