| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | ₹2.3 L | L1 | Accepted-AOC 228741.44 |
| 2 | L2₹2.4 LRejected-Finance BALAL VILLAGE PO VELLARIKUNDU | KERALA | ₹2.4 L | L2 | Rejected-Finance ALL BIDS ARE QUALIFIED |
| 3 | L3₹2.5 LRejected-Finance | ₹2.5 L | L3 | Rejected-Finance ALL BIDS ARE QUALIFIED |
| Sl No | Description | Qty | Unit | ANJITH K THOMAS L2 | SABASTIAN MD L1 | JACOB E J L3 |
|---|---|---|---|---|---|---|
| 1.00Drainage | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 34.21 | cum | 230.24 ₹7,876.28 | 210.6 ₹7,204.42 | 234.8 ₹8,032.27 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.89 | cum | 7,089.65 ₹34,647.12 | 6,716.51 ₹32,823.58 | 7,229.95 ₹35,332.77 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 13.03 | cum | 7,475.45 ₹97,420.06 | 7,100.1 ₹92,528.50 | 7,623.38 ₹99,347.89 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.36 | cum | 8,254.23 ₹11,209.24 | 7,819.79 ₹10,619.27 | 8,417.57 ₹11,431.06 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.86 | cum | 9,373.86 ₹54,968.32 | 8,880.5 ₹52,075.25 | 9,559.36 ₹56,056.09 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 351.86 | kilogram | 100.47 ₹35,351.78 | 95.18 ₹33,490.42 | 102.46 ₹36,051.99 |
Tender Value
₹2.5 L
EMD Value
₹6,355
Closing Date
11 Nov 2025, 5:00 pmClosed
AssistantEngineer
Balal GP
Drainage work
2025_LSGD_817972_13
AE/LSGD/BGP/TEN/05/25-26
Open Tender
Civil Works - Others
Balal GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,355
Yes
23 Feb 2026
4 Nov 2025
13 Nov 2025
4 Nov 2025
11 Nov 2025
4 Nov 2025
Amount
Drainage
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
ANJITH K THOMAS (BID ID -2435924)
JACOB E J (BID ID -2435991)
Bidder Name
SABASTIAN MD
ANJITH K THOMAS
JACOB E J
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1371534.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1371534.xls
BOQ • 0.30 MB
PA.pdf
Tender Documents • 0.26 MB
SBD.pdf
Tender Documents • 0.96 MB
FOT.pdf
Tender Documents • 0.26 MB
Affidavit.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid