Tender Value
₹5.8 L
EMD Value
₹11,640
Closing Date
25 Aug 2026, 1:00 pmDue tomorrow
Executive Engineer Jal Shakti PHE Division Samba
Executive Engineer Jal Shakti PHE Division Samba
Please refer BOQ
2026_PHE_319124_1
e-NIT No.PHES/24 of 2026-27 dated. 03.08.2026
Open Tender
Civil Works - Water Works
Percentage
30 days
Bari-Brahmana
Please refer E-NIT
2 documents required · 2 mandatory
₹600
Executive Engineer Jal Shakti PHE Division Samba
₹11,640
25 Aug 2026
3 Aug 2026
25 Aug 2026
3 Aug 2026
25 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. | 4.09 | Cum | 2,516.85 | ₹10,293.92 |
| 2 | Extra labour to be engaged for taking out the mulba of dismantled RCC from the GSR | 24 | Nos. | 553 | ₹13,272 |
| 3 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improveworkability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level For Raft | 3.35 | Cum | 8,021.1 | ₹26,870.69 |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improveworkability without impairing strength and durability as per direction of Engineer-incharge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately All works above plinth level upto floor level V (Walling, beams, dome & deduction of manhole)) | 5.8 | Cum | 9,412.05 | ₹54,589.89 |
| 5 | 12mm cement plaster of mix :1:4 (1cement: 4 fine sand) | 61.6 | Sqm | 283.8 | ₹17,482.08 |
| 6 | 12mm cement plaster of mix :1:3 (1cement: 4 fine sand) | 59.25 | Sqm | 370.75 | ₹21,966.94 |
| 7 | Extra for plastering on circular works | 120.85 | Sqm | 37.8 | ₹4,568.13 |
| 8 | Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.83 | Cum | 10,377.15 | ₹29,367.33 |
| 9 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo -Mechanically Treated bars of grade Fe-500 or more | 724 | kg | 123.2 | ₹89,196.8 |
| 10 | Centring and shuttering including strutting, propping etc and removal of form for walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 65.32 | Sqm | 628.95 | ₹41,083.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_1055665.xls
BOQ • 0.34 MB
Corrigendumem24DDC2.pdf
PDF • 0.28 MB
Corrigendumem24DDC.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].