| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC 154 GANDHI MARKET AMBALA CANTT HARYANA 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹27.7 L Quoted ₹27.9 L | L1 | Accepted-AOC BEING LOWEST BIDDER |
| 2 | L2₹28.3 L+₹32,520 (1.16%)Rejected-Finance | ₹28.3 L+₹32,520 (1.16%) | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| 3 | L3₹34.1 L+₹6.1 L (22.0%)Rejected-Finance 231 JAGGI GARDEN BALDEV NAGAR AMBALA CITY HARYANA 134003 | AMBALA CITY | AMBALA | HARYANA | 134003 | ₹34.1 L+₹6.1 L (22.0%) | L3 | Rejected-Finance OTHER THAN LOWEST BIDDER |
Tender Value
Refer Docs
EMD Value
₹80,400
Closing Date
8 Mar 2021, 6:00 pmClosed
GE AF AMABLA
GE AF AMBALA
GE AF/AMB-59/2020-21 MANNING AND OPERATION OF CENTRAL AC PLANT AND COMPREHENSIVE MAINTENANCE OF CENTRAL AC PLANT AT IACCS (601SU) AND GURTH COMPLEX AT GE (AF) AMBALA
2021_MES_418858_1
GE AF/AMB-59/2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
GE AF AMBALA
ALL AS PER NIT AND TENDER DOCUMENTS
10 documents required · 10 mandatory
₹500
GE AF AMBALA
₹80,400
Yes
31 Mar 2021
4 Feb 2021
10 Mar 2021
4 Feb 2021
8 Mar 2021
23 Feb 2021
11 Feb 2021 - 15 Feb 2021
Amount
PART-I (M&O WORKS)
Manning and operation of AC plant at IACCS 3x100TR by providing one skilled refrigeration mechanic for 03 (three) shifts {each shift of 08hours (0600 to 1400hrs, 1400 to 2200hrs and 2200 to 0600hrs), one mechanic for each shift}, including duties of descaling of condensor, checking of pipe lines, pressure / temperature gauges, extension valves, honey comb, control wiring, condensor/chiller pumps, accessories, etc. on all days including Sundays & holidays, round the clock for trouble free functioning of the installations complete all as specified hereafter and as directed by the Engineer-in-Charge
Manning and operation of AC plant at GURTH complex 3x60TR by providing one skilled refrigeration mechanic for 03 (three) shifts {each shift of 08hours (0600 to 1400hrs, 1400 to 2200hrs and 2200 to 0600hrs), one mechanic for each shift}, including duties of descaling of condensor, checking of pipe lines, pressure / temperature gauges, extension valves, honey comb, control wiring, condensor/chiller pumps, accessories, etc. on all days including Sundays & holidays, round the clock for trouble free functioning of the installations complete all as specified hereafter and as directed by the Engineer-in-Charge
Notes for serial item Nos. 2 & 3: (i) Number of shifts will be informed fortnightly as per requirements through designated duty rosters by the Engineer-in-charge. The timings for each shift shall be as decided by the Engineer-in-charge. Non-requirement or engagement of opeartors on weekly off days of the Station premises of plants will be intimated through duty rosters by the Engineer-in-charge. No claim whatsoever on this aspect is admissible (ii) The minimum wages as derived by the Department including all statutory provision such as EPF, ESIC, Bonus, GST, etc. as applicable except the Contractor's profit for skilled refrigeration mechanic works out to Rs. 765/-per person per shift (iii) Bidder has to upload an signed undertaking in firm's letter head confirming that he has not quoted his rates lower than the derived minimum rates of the Department. Bids not accompanied with such undertaking shall not qualify for opening of the price bids. As applicable, his tender will be treated as 'NON BONAFIDE' if found at any stage and will not be considered for acceptance. In such case, the lowest tender shall be determined by the lowest amount amongst valid / bonafide bids only.
Notes for serial item No. 2 & 3 contd: (iv) However increased minimum fair wages as notified time to time by the Government of India / State Government / Local bodies / Labour Regulations whichever is higher including all statutory provisions such as EPF, ESI, Bonus, taxes, etc. as applicable, irrespective of derived minimum wages as above (v) Increased wages including all other benefits in compliance of statutory provisions shall be paid to the workers by the Contractor. No other claim whatsoever shall be admissible on this account and the bidders shall note this aspect and quote their rates accordingly. It must be noted that in compliance of all statutory provisions, the increase shall be passed over to the workers (vi) Rates quoted by the bidder shall be deemed to be inclusive of any extra manpower required (if any) for relieving, replacement, etc. (vii) The operator placed shall be further responsible for the following: (a) to attend complaints related to cooling appliances / AC plants of concerned location as directed (b) recording of cooling parameters and plant parameters (c) maintaining of HP/LP logs (viii) Conveyance/vehicle for moving around of the staff employed and or any T&P required and detailed specifics as per particular specifications shall be provided by the Contractor. (ix) A penalty of Rs. 500/- per complaint shall be imposed on non-attending of such complaints as directed. Such penalties shall be recovered immediately from corrosponding RARs/FB of the Contractor (x) Further requirements shall be as stipulated in these tender documents
PART-II (COMPULSORY COMPREHENSIVE & PREVENTIVE MAINTENANCE WORKS)
Periodical, preventive and comprehensive maintenance of package type 3Nos. chiller units, each consisting of 1No. 100TR alongwith motors and their condensors including descaling, flooded chiller, scale guard units, micro-processor based control panel system of central air conditioning plant installed at IACCS, Air Force Stn Ambala, as per manufacturer's manual of preventive and comprehensive maintenance with periodicity mentioned there in and as per particular specifications detailed hereafter snd for the following equipment: (i) Condensing pump sets alongwith motors 12.5HP-03Nos (ii) Chiller pump sets alongwith motors 12.5HP-03Nos
Periodical, preventive and comprehensive maintenance of package type 3Nos. chiller units, each consisting of 1No. 60TR alongwith motors and their condensors including descaling, flooded chiller, scale guard units, micro-processor based control panel system of central air conditioning plant installed at GURTH Complex, Air Force Stn Ambala, as per manufacturer's manual of preventive and comprehensive maintenance with periodicity mentioned there in and as per particular specifications detailed hereafter snd for the following equipment: (i) Condensing pump sets alongwith motors-03Nos (ii) Chiller pump sets alongwith motors-03Nos
Notes for serial item No. 7 & 8: (i) The maintenance services shall be done through OEM i.e. Voltas. The Contractor shall submit a MoU on stamp paper duly notarized, as per performa specified hereinafter alongwith a copy of Annual Maintenance Contract from Voltas within 10 days from the date of acceptance, failing which the contract will be liable to be cancelled and work shall be got executed at the risk & cost of the Contractor (ii) The Contractor will arrange OEM visit quarterly for inspection and to check functionality of the plants including maintenance services as required and shall provide satisfaction certificate of smooth functioning of plant (iii) The rates quoted shall be deemed to be inclusive of the above
Periodical, preventive and comprehensive maintenance of the following accessories of central air conditioning plant installed at IACCS, Air Force Stn Ambala, as per manufacturer's manual of preventive and comprehensive maintenance with periodicity mentioned there in and as per particular specifications detailed hereafter: (i) FRP cooling towers with motor, fan, gear box-02Nos (ii) Compressor water pipe line and its control valves -01lot (iii) Chiller water pipe lines and its control valves- 01lot (iv) AHUs with accessories such as casing chilled water coil, hot water coil, any type of air filters, drive motors control panel, etc. having capacitiy 28000CFM-01No, 24000CFM-01No & 23000CFM-01No. (v) Expansion tanks including their insulation for chilled water and hot water system-01No (vi) Electrical operated hot generator of capacity 2 x KW with automatic and safety controls such as safety valve, purge valve, high limit cut out automatic and manual reset, low level cut out stop controller, thermostat, heaters including its control panel-01No (vii) Hot water pump set alongwith motor and control valves pump set 5HP -02Nos (viii) Hot water piping, insulation, fittings control valves connected between hot water unit to pump set and pump set to various AHUs-01lot
Item No. 10 contd... (ix) Replacement of controller for compressor (x) Controls for AHUs comprising of three way mixing valves with modulating motor, thermostat and humidistat- 03 Nos (xi) Supply air ducting complete, aluminium section grills/diffusers its dampers, fire dampers, etc. (xii) Cubical type floor mounted main LT panel consisting of control switch gear, starters of pump sets, cooling towers and its single phase preventors, no volt and under volt protection system, meters indication lamps -02Nos (xiii) Sub control panel provided for AHUs including controls starter, meters indication lamps -03Nos (xiv) Central control console panel comprising of ON/OFF push buttons and ON/OFF indication lights-03Nos (xv) LT cables from main electrical panel to compressor motor, pump motors cooling towers motors, sub panels of AHUs units floor mounted and ceiling suspended and control cables of central console panel - 01lot (xvi) 02Nos. earth pits and earthing strips provided for panels and motors - 01lot (xvii) Air washer operated on 230AC Supply - 02Nos
Periodical, preventive and comprehensive maintenance of the following accessories of central air conditioning plant installed at Gurth Complex, Air Force Stn Ambala, as per manufacturer's manual of preventive and comprehensive maintenance with periodicity mentioned there in and as per particular specifications detailed hereafter: (i) FRP cooling towers with motor, fan, gear box-01 No (ii) Compressor water pipe line and its control valves -01 lot (iii) Chiller water pipe lines and its control valves- 01 lot (iv) AHUs with accessories such as casing chilled water coil, hot water coil, any type of air filters, drive motors control panel etc -02 Nos. (v) Expansion tanks including their insulation for chilled water and hot water system-01 No (vi) Electrical operated hot generator with automatic and safety controls such as safety valve, purge valve, high limit cut out automatic and manual reset, low level cut out stop controller, thermostat, heaters including its control panel-01No (vii) Hot water pump set alongwith motor and control valves pump set -02 Nos (viii) Hot water piping, insulation, fittings control valves connected between hot water unit to pump set and pump set to various AHUs- 01lot (ix) Controls for AHUs comprising of three way mixing valves with modulating motor thermostat and humidistat- 02Nos (x) Supply air ducting complete, aluminium section grills/diffusers its dampers, fire dampers
Item No. 12 contd... (xi) Cubical type floor mounted main LT panel consisting of control switch gear, starters of pump sets, cooling towers and its single phase preventors, no volt and under volt protection system, meters indication lamps -01No (xii) Sub control panel provided for AHUs including controls starter, meters indication lamps -02Nos (xiii) Central control console panel comprising of ON/OFF push buttons and ON/OFF indication lights-02Nos (xiv) LT cables from main electrical panel to compressor motor, pump motors cooling towers motors, sub panels of AHUs units floor mounted and ceiling suspended and control cables of central console panel - 01lot (xv) Earth pits and earthing strips provided for panels and motors - 01lot
Notes for item Nos. 10 to 13: (i) The works shall be got done through authorised service agency of the OEM. The Contractor shall carry out all major and minor break down/repairs pertaining to machineries of central AC Plant & connected cooling towers, AHUs and the rates quoted is deemed to be included for all other aspects except any damage due to natural disasters such as flash, floods, earth quake, cyclone etc. (ii) The contractor shall maintain indoor design condition as dry bulb 23 degree celsius plus/minus 2 degree, if the above said temperature and relative humidity as specified is not achieved a penalty of Rs 5000/- per hour shall be imposed on the contractor from the dues as and when becomes due. (iii) Submission of testing report of AC plant (iv) In case of breakdown, the additional manpower if required will be arranged by the contractor without any extra cost
Notes for item Nos. 10 to 13 contd.. (v) The rates quoted are deemed to be included the labour factor for fixing supply only items in replacement unless otherwise specified in respective item. (vi) To check and servicing the undergiven items fitted in plants: (a) All the valves of water pipe line of condenser (b) All the valves of water pipe line of chiller motor (c) Painting of all pipe line of air conditioning system. (d) Fitting float valves in cooling towers. (e) Fitting new water pipe line from reserve water tank to coling towers . (f) Fitting new water pipe line in both reserve wtaer tank. (Incoming water pipe line) seperately with On/Off valves
Notes for item Nos. 10 to 13: contd... (g) Fitting float valves to Reserve water tanks (h) Fitting water by pass valve to both cooling tower (j) Replacement of FRP of both cooling tower (k) Maintenance of Air ducts of Air conditioning system (l) Checking of Air flow of Air conditioning system (m) Putting insulator (n) Replacement of coarse filters (o) 1No AHU is having low cooling efficiency thoroughly checking of sytem (p) Setting of thermostats in AHU room for temperature control (q) Replacement of U/S thermometer . (r) Fitting new water pipe lines to reserve water tank for over flow of water
PART-III (COMPULSORY ROUTINE REPAIR / SERVICE / MAINTENANCE WORKS)
Overall acessed maintenance cost of AC plant 3x100TR installed at 601SU (value of plant asset Rs. 1,12,30,000) for keeping the plant functional throughout the currency of the contract comprising of all elements of all required material, labour, tools & plants including material, labour, necessary T&P, necessary spare parts, topping with compressor oil, recharging of refrigerant gas, hiring company rep to assess and rectify any defects, breakdwon and routine epair, periodical services, covering all aspects of major / minor repair to compressor motor, chiller condensor, cooling towers, pumps, liquid and condensing line, all types of valves, controllers, sensors, hot water generators, strip heaters, humidity control system, electric panels, protection and controll measuring instruments, protection devices, calibration system, etc. complete all as specified and as directed
Overall acessed maintenance cost of AC plant 3x30TR installed at GURTH Complex (value of plant asset Rs. 69,79,000) for keeping the plant functional throughout the currency of the contract comprising of all elements of all required material, labour, tools & plants including material, labour, necessary T&P, necessary spare parts, topping with compressor oil, recharging of refrigerant gas, hiring company rep to assess and rectify any defects, breakdwon and routine epair, periodical services, covering all aspects of major / minor repair to compressor motor, chiller condensor, cooling towers, pumps, liquid and condensing line, all types of valves, controllers, sensors, hot water generators, strip heaters, humidity control system, electric panels, protection and controll measuring instruments, protection devices, calibration system, etc. complete all as specified and as directed
Notes for serial item Nos. 18 to 19: (a) Plant asset values are estimated and the Contractor has to ascertain the same at site and assesss these for his purpose of quoting. (b) The quoted cost shall be inclusive of all aspects in keeping the plants functional at all times (c) The quoted cost shall be inclusive of all encumbrances, site conditions, requirements, etc. (d) The rates quoted shall be deemed to be inclusive of all as above and as stipulated in these tender documents irrespective of the fac the Contractor visits the site for his own assessments, etc. or not and no claim whatsoever is entertainable at any later dates
Supplying and charging of refrigerent R-134a gas in plant after detection/ rectification of any leakages in the system by using CO2 gas and flushing the complete system thoroughly with nitrogen gas including pressure test (for Central AC plant Screw type compressor of capacity 100TR at IACCS complete all as specified and as directed
Supply only in replacement PVC fins honey combs of size 24"x12"x6" for cooling towers at at (a) IACCS Bldg (b) Gurth Complex complete all as specified and as directed
Supply only in replacement mild steel class 'C' pipe line including all welding works in the duct complete all as specified and as directed of the following sizes:
50mm bore
80mm bore
100mm bore
150mm bore
Supply only in replacement top protector cover to the CT fan motor at the iron top of the cooling tower made out of GI sheet 20SWG, conical shape with and including flat iron clamps of required size to protect the CT fan motor form rain water complete all as specified and as directed
Supply only in replacement metallic viscos filter made out of GI wire mesh interspaced with two crimp layers with three flat layers and housed in 2" deep metal frame, efficiency 65%, as per existing size and pattern complete all as specified and as directed
Supply only in replacement water pressure gauge 100mm dia range 0-100LBS/sq inches complete all as specified and as directed
Supply only in replacement suction pressure gauge suitable for range (-) 30 to 150LBS/sq inches complete all as specified and as directed
Supply only in replacement discharge pressure gauge suitable for range 0 -300Lbs/sq inches complete all as specified and as directed
Supply only in replacement air dampers with necessary nuts, bolts, clamps and MS frame made out of angle iron for opening and closing of grills complete all as specified and as directed
Supply only in replacement Y strainer 150mm size complete all as specified and as directed
Supply only in replacement Y strainer 100mm size complete all as specified and as directed
Supply only in replacement Y strainer 80mm size complete all as specified and as directed
Supply only in replacement pressure transmitter range (-) 01 to 12 bar, output 10 to 90% , supply 4.75 to 8V DC complete all as specified and as directed
Supply only in replacement pressure transmitter range upto 16 bar, output 4 to 20mA, supply 9 to 28V DC complete all as specified and as directed
Supply only in replacement pressure transmitter range upto 25 bar, output 4 to 20mA, supply 9 to 28V DC complete all as specified and as directed
Supply only in replacement MCCB 630Amp, 25kA, three pole and protection from short circuit and overload with adjustable thermal and magnetic setting complete all as specified and as directed
Supply only in replacement MCCB 250Amp, 16kA, three pole and protection from short circuit and overload with adjustable thermal and magnetic setting complete all as specified and as directed
Supply only in replacement MCCB 160Amp, 16kA, three pole and protection from short circuit and overload with adjustable thermal and magnetic setting complete all as specified and as directed
Supply only in replacement MCCB 63Amp, 16kA, three pole and protection from short circuit and overload with adjustable thermal and magnetic setting complete all as specified and as directed
Supply only in replacement volt meter digital type suitable for 0-500V complete all as specified and as directed
Supply only in replacement ammeter digital type suitable for 0-200Amps complete all as specified and as directed
Supply only in replacement indicator bulbs Red, Blue and Yellow phases complete all as specified and as directed
Supply only in replacement On/OFF switch to start/stop the motors complete all as specified and as directed
Supply only in replacement contactor MNO 22E,2No+2NC 230V complete all as specified and as directed
Supply only in replacement 25A MNX contactor 230 V, 2No+2NC complete all as specified and as directed
Supply only in replacement 32A MNX contactor 230 V, 2No+2NC complete all as specified and as directed
Supply only in replacement timer ETR 550 of 220V complete all as specified and as directed
Supply only in replacement overload relay MN 9-14A complete all as specified and as directed
Supply only in replacement overload relay MN 15-23A complete all as specified and as directed
Supply only in replacement overload relay MN 6-10A complete all as specified and as directed
Supply only in replacement add on auxilary contact block 2No+ 2NC complete all as specified and as directed
Supply only in replacement V belt of size B-82 complete all as specified and as directed
Supply only in replacement V belt of size B-87 complete all as specified and as directed
Supply only in replacement V belt of size B-90 complete all as specified and as directed
Supply only in replacement V belt of size B-103 complete all as specified and as directed
M&L for spray painting to central AC plant including cooling tower compressor, compressor motors, electric panel, AHU, discharge pipe line, suction pipe line, condenser pump, chiller pump by removing peeled old paint with scrapper and applying two coats of synthetic enamel paint of 1st quality, of approved tint over a coat of primer and writing SM No/ MES No as exists with black enamelled paint complete all as specified and as directed
M&L for preparation to old painted surfaces by scrubing of old paint from MS pipes upto 150mm bore of condensor/cooling tower located at different pockets and applying two coats of synthetic enamel paint of approved tint over a coat of primer complete all as specified and as directed
M&L for servicing of FRP cooling tower capacity 60 to 125TR, cleaning of water tanks,body of cooling tower to make the cooling tower functional and servicable in all respect with and including rectification of minor leakages from the cooling tower by using suitable sealing adhesives complete all as specified and as directed
M&L for repairs to wiring of control system of AC plant starter panel including contactor by using copper conductor PVC insulated wire of size as exists and making necessary connections to make the control / interlocking system functional with and including minor repair of contactor complete all as specified and as directed
M&L for taking down/out hot water generater,disconnecting electric/water connections, cleaning the tank with recommended chemical/cleaning agent, replacing defective parts such as heating element, nuts, bolts & washers including repairing of electircal panel of hot water generator by replacing the spare parts, repairing hot water generator tank by welding, making necessary electrical/water connections to make the plants functional complete all as specified and as directed Note: Spare parts shall be measured & paid seperetely. Cost of element, nuts, bolts & washers is deemed to be included in the quoted rates
M&L for servicing, repair and overhauling of semi sealed type compressor capacity 60TR, after disconnecting,removing from system, transporting to work shop of OEM, replacement of gasket set, seals, suction / discharge reeds and other minor spares as required and transporting back to site, re-installing, commissioning and testing of the same and making necessary connections to make the the unit functional with existing system complete all as specified and as directed Note: The cost of minor spares such as gasket set, seals, suction and discharge reeds as required shall be deemed to be included in quoted rates
Supply only in replacement pulley of AHU motor with and including seal or gland packing, packing set, metalling, grinding /turning of shaft, ball bearing as per existing type and make complete all as specified and as directed
M&L for repair to wiring of control system of AHUs including contactor by using copper conductor PVC insulated wire of size as exists and making necessary connections to make the control / interlocking system functional with and including minor repair of contactor complete all as specified and as directed
Supply only in replacement power contactor 32Amp, 3 pole, 415V, AC with 01 No + 01 No auxilary contact complete all as specified and as directed
Supply only in replacement power contactor 50Amp, 3 pole, 415V, AC with 01 No + 01 No auxilary contact complete all as specified and as directed
S&F humidity controller with and including sheet metal enclosures for fixing humidity controller after taking down/out controller with encloser of existing type, model and as per site complete all as specified and as directed
S&F chilled water flow meter with and including sheet metal enclosures after taking down/out meter with encloser of existing type, model and as per site complete all as specified and as directed
S&F sheet metal encloser for fixing of humidity controller and chilled water flow controller with transformer of 24V step down type including all necessary control wiring complete all as specified and as directed
M&L for servicing ACB with microprocessor, range 800Amps, 450V, 50Hz 50kA and electrical panel including dismantling of old unserviceable/defectice ACB from existing LT panel, supply and fixing ACB for LT panel including repairing arrangement for their movement on rail with male/female contacts and complete mechanism microprocessor based ET trip system with thermal memory, fully rated neutral with in-built protection, short circuit breaking capacity conforming to IEC 60947/ISI 13947 (Part I & II), ACB fully functional protection units with flexible and adjustable current time protection settings for overload, short circuit, instantaneous short circuit and earth fault protection, fault indication for overload, short circuit and earth fault complete all as specified and as directed comprising of the following parts: (a) Arc chutes (b) Draw out type handle (c) Magnet hold trigger (d) Anti pumping relay
S&F fan blade assembly having six blades 1/68 inches in length with housing in aluminium body to match and fit with existing 100 TR FB type cooling tower after taking down/out blades as existing at site complete all as specified and as directed. Note: Replacement be done in time not more than 48hrs failing which contractor shall be imposed a panel recovery of Rs. 1000 per hour for delay
S&F fan motor 5HP, 415V, 3 phase, 900RPM after taking down/out motor as per exising type at site complete all as specified and as directed
S&F cylinderical capacitor, 440V, rating 25kVAR to 27kVAR after taking down/out capacitor as per existing at site complete all as specified and as directed
S&F in replacement microprocessor based power factor controller with features as automatic C/K, rated step adjustment automatic correction, display power factor, programmable, under/over voltage alarm and high harmonic distarrtion alarm complete all as specified and as directed
M&L fof taking down power factor correction panel for detecting faults for repair and for replacement of the defective parts if any, refixing to make it functional complete all as specified and as directed Note: Parts replaced will be measured and paid separetely under respective items herein
M&L for taking down end covers of condensor for de-scaling using solvent, wire/nylon brush, then washing with fresh water and refixing the end covers complete all as specified and as directed
Baliyan Electrical Works
Bairagi Builders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .