Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹256.6 CrAdmitted-Finance BLOCK NO 758 EAGLE NEST BEHIND CHOPRA COURT ULHASNAGAR 421003 DIST THANE | 421003 | ₹256.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹256.6 CrAdmitted-Finance 1C 1D VINDHYA TELELINKS LIMITED UDYOG VIHAR REWA MADHYA PRADESH 486006 | REWA | MADHYA PRADESH | 486006 | ₹256.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹268.7 CrAdmitted-Finance | ₹268.7 Cr | L3 | Admitted-Finance |
| 4 | L4₹270.2 CrAdmitted-Finance AHEMDABAD B WING 15TH FLOOR PRIVILON BUILDING VIKRAM NAGAR AMBALI BOPAL ROAD BEHIND ISCONTAMPLE AHEMDABAD 380058 GUJRAT INDIA | AHMADABAD | GUJARAT | 380058 | ₹270.2 Cr | L4 | Admitted-Finance |
| 5 | L5₹271.7 CrAdmitted-Finance S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | ₹271.7 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Laxmi Civil Engineering Services Pvt Ltd L7 | WPIL Limited L8 | GVPR ENGINEERS LIMITED L9 | MEGHA ENGINEERING AND INFRASTRUCTURES LIMITED L5 | LARSEN AND TOUBRO LIMITED L6 | Vindhya Telelinks limited L2 | Dilip Buildcon Limited L3 | LCC Projects Limited L4 | EAGLE INFRA INDIA LTD L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Execution of 05 nos. of Lift Irrigation Schemes with intake points on Mahanadi & Daya River having Command area between 500Ha. to 2000 Ha. in Cluster No. XXXIV in the district of Khurda & Puri including its distribution network, up to 1 Ha Chak having total planned Culturable Command Area of 7,700 Ha. on “EPC –Turn Key” basis comprising work of Detailed Survey, Planning, Design, Drawing, Estimation, Preparation of Land Acquisition Cases, Preparation of cases for forest land if any, Installation of electrical system connectivity from the Local/Identified Grid Substations, and commissioning of all the LI schemes. | 1 | Nos | 2,51,59,73,765 ₹251.6 Cr | 2,65,54,54,955 ₹265.5 Cr | 3,45,53,00,000 ₹345.5 Cr | 2,51,56,94,167 ₹251.6 Cr | 2,51,34,10,000 ₹251.3 Cr | 2,37,38,89,917 ₹237.4 Cr | 2,35,28,64,591 ₹235.3 Cr | 2,50,02,81,028.88 ₹250.0 Cr | 2,34,78,97,366.12 ₹234.8 Cr |
| 2.00 | Operation & maintenance of 5 schemes of the cluster including local substations for 15(fifteen) years or fifteen Khariff water supply seasons whichever is more, after completion as per relevant clauses of the agreement. | 1 | Nos | 20,12,77,901 ₹20.1 Cr | 21,24,36,397 ₹21.2 Cr | 11,50,00,000 ₹11.5 Cr | 20,12,55,534 ₹20.1 Cr | 20,37,90,000 ₹20.4 Cr | 19,22,85,083 ₹19.2 Cr | 33,38,96,779 ₹33.4 Cr | 20,12,72,622.82 ₹20.1 Cr | 21,81,10,684.28 ₹21.8 Cr |
Tender Value
₹301.9 Cr
EMD Value
₹3.0 Cr
Closing Date
28 Jul 2025, 5:00 pmClosed
CHIEF ENGINEER, MEGALIFT, BHUBANESWAR
PLOT NO. A-8/2, BHOI NAGAR, BHUBANESWAR-751022
MEGALIFT PROJECTS
2025_CEMLP_114632_1
1ML/2025-26
Open Tender
Civil Works - Lift Irrigation Schemes
1080 days
KHURDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
₹3.0 Cr
Yes
O/O CHIEF ENGINEER, MEGALIFT, BHUBANESWAR
9 Mar 2026
21 Jun 2025
1 Aug 2025
21 Jun 2025
28 Jul 2025
21 Jun 2025
21 Jun 2025 - 29 Jun 2025
1 Jul 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid