Loading…
Loading…
Tender Value
₹13.4 Cr
EMD Value
₹5 L
Closing Date
21 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Superintending Engineer
PH CIRCLE, KWA, MALAPPURAM
Jal Jeevan mission AR Nagar GP-Providing FHTCs-Phase-1,Package-1 Construction of 9 MLD Water treatment plant 26 LL OHSR and allied electrical works
2026_KWA_857514_1
SE/PHC/MPM/04/2026-27
Open Tender
Civil Works - Water Works
365 days
A.R. Nagar
Refer Tender Documents
8 documents required · 8 mandatory
₹16,540
₹5 L
PH CIRCLE, KWA, MALAPPURAM
29 Jun 2026
29 Jun 2026
22 Jul 2026
29 Jun 2026
21 Jul 2026
29 Jun 2026
29 Jun 2026 - 2 Jul 2026
2 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix-1 (a) Aerator | |||||
| 1.01 | 100.2.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited. | - | cum | - | - |
| 1.02 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | - | cum | - | - |
| 1.03 | 5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level | - | cum | - | - |
| 1.04 | 5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level | - | cum | - | - |
| 1.05 | 5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum). | 1 | cum | - | - |
| 1.06 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.07 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | sqm | - | - |
| 1.08 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 0.4 | sqm | - | - |
| 1.09 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.35 MB
NIT1_merged.pdf
Tender Documents • 9.88 MB
q1toq8new.pdf
Tender Documents • 0.19 MB
BOQ_1449551.xls
BOQ • 0.40 MB
NIT_VOL_2.pdf
Tender Documents • 22.55 MB
Download all tender documents and submit your bid