Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 LRejected-AOC | ₹2.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K.A.Gopikumar L1 | PRADEEP M D L2 |
|---|---|---|---|---|---|
| 1.00A | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 6 | sqm | 18 ₹108 | 18 ₹108 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1.5 | cum | 359 ₹538.50 | 359 ₹538.50 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.6 | cum | 7,932 ₹4,759.20 | 7,932 ₹4,759.20 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 74.47 | sqm | 386 ₹28,745.42 | 386 ₹28,745.42 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 15.49 | cum | 10,488 ₹1.6 L | 11,000 ₹1.7 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 126 | kilogram | 112 ₹14,112 | 112 ₹14,112 |
Tender Value
₹2.1 L
EMD Value
₹5,271
Closing Date
12 Feb 2026, 5:00 pmClosed
ASSISSTANT ENGINEER
OFFICE OF THE ASSISTANT EXECUTIVE ENGINEER LID AND EW IRINJALAKUDA MUNICIPALITY
Annual Plan-Irinjalakuda municipality 2025- 2026 Project No.607 Perumthodu naveekaranam balance portion -ward 21- General Civil Work
2026_LSGD_833308_1
607/2025-2026
Open Tender
Civil Works - Others
IRINJALAKUDA
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹5,271
1 Jun 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
12 Feb 2026
4 Feb 2026
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1401336.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1401336.xls
BOQ • 0.30 MB
epay.pdf
Tender Documents • 0.22 MB
fot.pdf
Tender Documents • 0.19 MB
integrity.pdf
Tender Documents • 0.22 MB
pa.pdf
Tender Documents • 0.19 MB
aff.pdf
Tender Documents • 0.22 MB
sbd.pdf
Tender Documents • 1.96 MB
Download all tender documents and submit your bid