Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹34,698
Closing Date
4 Nov 2026, 12:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer NTKD-II PHED
Administrative Building 2nd Floor, Water Treatment Plant Site, Tank No.-I, New Town, Rajarhat, Kolkata-700156
Extension of sewerage network due to creation of new plot (sold by DLF LTD.) IT-ITES SEZ, Premise no. 01-0370, Plot no. IIF-1, AA-II, New Town Kolkata-700156
2026_PHED_5079548_1
PHE/NTKD-II/e-28 OF 2026-27
Open Tender
CIVIL WORKS
Percentage
45 days
work
Please refer Tender documents.
6 documents required · 6 mandatory
₹34,698
13 Oct 2026
13 Oct 2026
6 Nov 2026
14 Oct 2026
4 Nov 2026
14 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
In ground floor including roof
(a) upto 150 mm. thick | 3 | cum | 939 | ₹2,817 |
| 1.2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 27 | cum | 119.27 | ₹3,220.29 |
| 2 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 9 | cum | 192.38 | ₹1,731.42 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 11.25 | Sqm. | 361 | ₹4,061.25 |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety | 6.75 | Cum | 5,572.5 | ₹37,614.38 |
| 5 | Aligning following diameter HDPE gravity sewer line through Horizintal Directional Drilling (HDD) technology all complete that includes necessary excavation and shoring works for the receiving and terminal pits, drilling pilot holes with necessary inclination and azimuth, with average depth of 4000 mm BGL and average slope of 1 in 1000, pre-reaming/reaming of pilot hole/repeating the intermediate steps to minimize the force to be required for pulling the HDPE pipe, including necessary jointing through butt-fusion welding, testing hydrostatic drain test, including repairing and mending good damages of the receiving and terminal pits to be used as manholes.
i) 200 mm diameter (OD) HDPE pipe
Note:- The mode of measurement to be length of sewer line driven through HDD technology. | 78 | Mtr | 13,800 | ₹10,76,400 |
| 6 | Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984- 1995 with latest revision & amendments if any with necessary HDPE specials (excluding cost of CIDF valves) including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade and aits flank but excluding moorum laterite or sand stone / hard rock cutting with chisel required including cutting road flank/ brick pavement etc. without damaging the exisiting telephone/electrical cable line etc.(in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be brone by the agency at his own cost)upto the depth (avg.) so as to maintain 1.10m.earth cushion from top of the pipe upto G.L. including loading unloading carrying lowering laying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding/ adopting suitable method (But weld jointing with help of hydraulic tack and trimming machines, Hitter etc. for reaching at necessary melting point of HDPE pipe so that joint can be monolithic) so as to facilitate the maintenance of pipe line locally as per conventional method in future.
(B) Pressure Rating : PN 6
(ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
h) 200mm(OD) | 90 | Mtr | 1,365 | ₹1,22,850 |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation | 9 | Sqm. | 209 | ₹1,881 |
| 8 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation. | 9.75 | cum | 77.54 | ₹756.02 |
| 9 | Construction of manhole with chamber of size as given below as per requirement and 600mm × 600mm. (inside measurement) square shaft, with cement brickwork (1:4) over 150 mm. thick jhama cement concrete (1:4:8) bed, over a layer of brick flat soling including providing 150mm. thick R.C.C. slab with ordinary concrete (mix 1:1.5:3) with reinforcement as per standard drawing over the chamber, brick-on-edge flooring with ordinary cement concrete (mix 1:2:4) in the invert with 20mm. thick cement plaster (1:4) finished fine with 1.5mm. thick neat cement in the inside walls and invert including supplying, fitting and fixing R.C.P.C. cover and frame (35 M.T. load bearing capacity) with ordinary cement concrete (mix 1:2:4) and C.I. steps (4 Kg. each) including cutting hard crust, excavation, de-watering, back filling and removal of spoils but excluding shoring complete as per standard drawing.
iii) Average depth of invert 2.5m. below G.L With 375 mm. thick brick work
a) 150 mm to 400 mm dia having internal size
(1500mm × 750mm) | 4 | Each | 51,086 | ₹2,04,344 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
2911.pdf
Tender Documents • 0.69 MB
SECTION_A_B_C_D_E.pdf
Additional Documents • 0.62 MB
BOQ_5183166.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .