Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8 LAccepted-Finance A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.5 L+₹50,000 (6.25%)Rejected-Finance | ₹8.5 L+₹50,000 (6.25%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.1 L+₹1.1 L (13.6%)Rejected-Finance | ₹9.1 L+₹1.1 L (13.6%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not eligible as per NIT Conditions |
| Sl No | Description | Qty | Unit | Dharam Pal L3 | Rajinder Kumar Thakur L2 | Manoj Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Sair Dobha Karot whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 9,09,000 ₹9,09,000 | 8,50,000 ₹8,50,000 | 8,00,000 ₹8,00,000 Lowest |
| 2.00 | Description of main components of the scheme is as under:-
Civil works: 1 Nos pump house, Slow sand WTP, Clear water Tank and collection Tank.
Rising main: LWSS Sair Dobha Karot
1st Scheme: Booster stage 100 mm dia 300 Rmt 1st stage 125 mm dia= 2800 Rmt.
Pumping machinery: LWSS Sair Dobha Karot
1st Scheme: Booster stage 2x5HP=10 HP, 1st stage 2x60=120 HP.
Approximate length of distribution system=70.00KM
No. of storage tanks=5 Nos., Nos of habitation=19 Nos, Total working hours 25.30 hours-through 5 Nos. of person (Chowkidar=1 No Helper=2 Nos and Beldar=2 Nos.)
Indicators to be monitored:
(1) Nos of complaints received through different mode such as C.M. Sankalap, E. Samadhan, complaint register etc.
(2) Quantity of water lifted per day.
(3) Nos of Pumping hours per day and energy consumption per day. | - | - | - | - | - |
Tender Value
₹6.8 L
EMD Value
₹13,510
Closing Date
29 Jul 2026, 5:00 pmClosed
EE JSV Division Jagatkhana
EE JSV Division Jagatkhana
(SH Deployment of manpower for operation of pumping machinery and distribution system of water supply from sector storage tank to different habitations for one year).
2026_HPIPH_139435_1
NIT 5122-5221 dt 18.07.2026
Open Tender
Repair and Maintenance Works
Item Rate
365 days
Jukhala
Please refer Tender documents.
3 documents required · 3 mandatory
₹350
Yes
₹13,510
Yes
6 Aug 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Sair Dobha Karot whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 100 | ₹100 |
| 2 | Description of main components of the scheme is as under:-
Civil works: 1 Nos pump house, Slow sand WTP, Clear water Tank and collection Tank.
Rising main: LWSS Sair Dobha Karot
1st Scheme: Booster stage 100 mm dia 300 Rmt 1st stage 125 mm dia= 2800 Rmt.
Pumping machinery: LWSS Sair Dobha Karot
1st Scheme: Booster stage 2x5HP=10 HP, 1st stage 2x60=120 HP.
Approximate length of distribution system=70.00KM
No. of storage tanks=5 Nos., Nos of habitation=19 Nos, Total working hours 25.30 hours-through 5 Nos. of person (Chowkidar=1 No Helper=2 Nos and Beldar=2 Nos.)
Indicators to be monitored:
(1) Nos of complaints received through different mode such as C.M. Sankalap, E. Samadhan, complaint register etc.
(2) Quantity of water lifted per day.
(3) Nos of Pumping hours per day and energy consumption per day. | - | - | 100 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
PWD6.pdf
Tender Documents • 0.68 MB
PWD8.pdf
Tender Documents • 1.42 MB
TC6.pdf
Additional Documents • 0.53 MB
BOQ_206667.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .