Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.1 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹40.5 L+₹1.3 L (3.41%)Rejected-Finance | L2 | Rejected-Finance other than L1 | |
| 3 | L3₹43.2 L+₹4.1 L (10.4%)Rejected-Finance | L3 | Rejected-Finance other than L1 | |
| 4 | Rejected-Technical 10 CHANDRA NAGAR RAEBARELI UTTAR PRADESH 229001 | RAE BARELI | UTTAR PRADESH | 229001 | - | Rejected-Technical Not recommended due to not enlisted in c(i) category. |
| Sl No | Description | Qty | Unit | The Electrical Engineers L2 | M/s Yash Trading Company L1 | Radhe Krishn Engineering L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 70 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 2 | Each Job | 2,55,000 ₹5,10,000 | 2,95,000 ₹5,90,000 | 2,39,099 ₹4,78,198 Lowest |
| 2.00 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 125 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1 | Each Job | 3,75,000 ₹3,75,000 Lowest | 4,95,000 ₹4,95,000 | 3,80,001 ₹3,80,001 |
| 3.00 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 60 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1 | Each Job | 2,15,000 ₹2,15,000 | 2,49,000 ₹2,49,000 | 2,10,000 ₹2,10,000 Lowest |
| 4.00 | Supply fixing installation and testing complete a new Cooling Tower of Capacity 50 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1 | Each Job | 1,95,000 ₹1,95,000 | 2,10,000 ₹2,10,000 | 1,76,100 ₹1,76,100 Lowest |
| 5.00 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 90 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge.
Note FOR Item 1 to 5 :
(i) Rates are inclusive of all minor/Major parts complete set of Cooling Tower.
(ii) Size and capacity of Cooling Tower will be as per mentioned above
(iii) LPS/PVC Fills rates are included in quoted rates.
(iv) Tie Rod/Turn Buckle SS/Eliminators/Fan Assembly with motor etc complete set with all connected items. | 1 | Each Job | 3,40,000 ₹3,40,000 | 4,00,000 ₹4,00,000 | 2,90,000 ₹2,90,000 Lowest |
| 6.00 | S&F in replacement 50 mm dia butterfly valve with rubber gasket and flange of AC chiller plant circulation pipe line, of existing model including cutting/welding work complete the same as per existing fixing arrangements complete all as specified and as directed. | 12 | Each | 1,350 ₹16,200 Lowest | 2,500 ₹30,000 | 3,100 ₹37,200 |
| 7.00 | All as per item no 6.00 above but of size 80mm dia | 12 | Each | 1,700 ₹20,400 Lowest | 3,500 ₹42,000 | 3,900 ₹46,800 |
| 8.00 | All as per item No 6.00 above but of size 100mm dia | 12 | Each | 2,100 ₹25,200 Lowest | 5,000 ₹60,000 | 5,100 ₹61,200 |
| 9.00 | S & F in replacement of GM gate valve ISI marked including cutting / threading and welding of existing GI pipe of size 50 mm dia complete all as specified and directed. | 5 | Each | 4,000 ₹20,000 | 3,500 ₹17,500 Lowest | 3,500 ₹17,500 Lowest |
| 10.00 | All as per item No. 9.00 above but of size 40 mm dia | 5 | Each | 3,200 ₹16,000 | 2,500 ₹12,500 Lowest | 3,100 ₹15,500 |
Tender Value
₹44 L
EMD Value
₹88,000
Closing Date
29 Jun 2026, 6:00 pmClosed
CWE (AF) BAREILLY
HQ Commander Works Engineers (AF) Military Engineer Services Bareilly 243002
As described in BOQ
2026_MES_758553_2
81618/E8
Open Tender
Civil Works
Item Rate
180 days
GE (AF) BAREILLY
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) BAREILLY
₹88,000
17 Aug 2026
17 Jun 2026
7 Jul 2026
17 Jun 2026
29 Jun 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 70 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 2 | Each Job | - | - |
| 2 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 125 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1 | Each Job | - | - |
| 3 | Supply, fixing, installation and testing complete a new Cooling Tower of Capacity 60 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1 | Each Job | - | - |
| 4 | Supply fixing installation and testing complete a new Cooling Tower of Capacity 50 TR of induced draft top discharge counterflow type FRP Cooling Tower (Rectangular/Round bottle shape) with FRP body and base, water spray headers, cooling tower fills, fan with motor, supporting base frames, as per manufacturer's standard instructions with Turbine pump and fan complete set of top cover/PVC Fill/nozzle/sprinkler/fan assly/eliminator/Wire mess/float valve/ incl nut-bolts and placement of rusted nuts, bolts with washers etc all as specified and directed by Engineer-in-charge. | 1 | Each Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Retender81618.pdf
Tender Documents • 0.93 MB
BOQ_865350.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .