Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -19.30% | ₹1.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.1 L+₹40,513.15 (23.9%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.1 L+₹40,513.15 (23.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.2 L+₹51,008.78 (30.1%)Admitted-Fee/PreQual/Technical/Finance | +5.00% | ₹2.2 L+₹51,008.78 (30.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
EMD Value
₹5,250
Closing Date
23 Jul 2026, 1:35 pmClosed
Managing Director
KHRWS, General Hospital Campus, Red cross Road, Tvpm - 695035
KHRWS - Urgent rectification of blocked waste line pipe and other petty repairs at Deluxe Payward, Panchakarma Ayurveda Hospital, Poojappura, Thiruvananthapuram
2026_KHRWS_860837_1
25/2026-27/KHRWS
Open Tender
Civil Works - Others
Percentage
14 days
Poojappura
Registration certificate of KHRWS
7 documents required · 7 mandatory
₹500
₹5,250
25 Jul 2026
16 Jul 2026
25 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil work | |||||
| 1.001 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | - | sqm | 365.33 | - |
| 1.002 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | - | sqm | 377.98 | - |
| 1.003 | OD87750/2026-2027:Providing and fixing PVC pipes, including fixing the pipe with clamps/clips at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 90 mm dia 4 Kgf/cm2 - External work - Exposed on wall | - | metre | 288.65 | - |
| 1.004 | OD87751/2026-2027:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 90 x 90 x 90 mm dia Tee. | - | each | 120.53 | - |
| 1.005 | OD87752/2026-2027:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement- 90 mm dia Door Elbow. | - | each | 119.37 | - |
| 1.006 | OD87753/2026-2027:Providing and fixing PVC moulded fittings/accessories for Rigid PVC pipes,including jointing with PVC solvent cement - 90 mm dia Socket/ coupling. | - | each | 92.65 | - |
| 1.007 | 50.18.8.9.2:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC Solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 110 mm pipe 4 kgf/cm2 | - | metre | 765.76 | - |
| 1.008 | 50.18.9.22.1:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 110 mm dia Elbow | - | no | 114.21 | - |
| 1.009 | 50.18.9.17.2:Providing and fixing PVC pipes including fixing the pipe with clamps/clips at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 63 mm dia 4 Kgf/cm2- External work - exposed on wall | - | metre | 251.95 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Tender_conditions_2019revisedlatest.pdf
Additional Documents • 0.36 MB
Agreementformat.pdf
Tender Documents • 0.10 MB
RevisedGeneralConditionsforeTendering.pdf
Other Document • 0.41 MB
BOQ_1455771.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .