Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 L+₹22,014.60 (6.44%)Admitted-Finance VILLAGE AMARU PO SAI TEH BADDI DISTT SOLAN H P | BADDI | SOLAN | HIMACHAL PRADESH | ₹3.6 L+₹22,014.60 (6.44%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 L+₹45,104.60 (13.2%)Admitted-Finance N A | FARIDABAD | HARYANA | 121004 | ₹3.9 L+₹45,104.60 (13.2%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Rajinder Singh L2 | Manu Katoch L1 | Ramesh Chand L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches in earth work,lifts up to 1.50 meters atacking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stacking soil in 15cm .layers, when required in to plinths sides of foundations etc, consolidating each deposted layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20 metres in all respect with in all leads and lifts as per the direction of Engineer-in-Charge. | 16.31 | Cum | 540 ₹8,807.4 | 550 ₹8,970.5 | 430 ₹7,013.3 Lowest |
| 2.00 | Providing and laying cement concrete 1:4:8(1cement :4 sand : 8 graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth complete in all respect with in all leads and lifts as per the direction of Engineer in charge. | 2.25 | Cum | 7,400 ₹16,650 | 7,500 ₹16,875 | 7,300 ₹16,425 Lowest |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work in:- | ||||||
| 3.01 | Vertical surfaces such as Walls ( any thickness but attached pilasters, buttresses, plinth and string courses etc. and the like complete in all leads and lifts. | 51.07 | Sqm | 580 ₹29,620.6 | 540 ₹27,577.8 Lowest | 590 ₹30,131.3 |
| 4.00 | Providing and laying reinforcement cement concrete 1:2:4(1cement:2sand: 4graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work :- foundation and plinth including all leads and lifts Suspended floors, roofs, | 12.13 | Cum | 8,500 ₹1,03,105 | 8,000 ₹97,040 Lowest | 8,900 ₹1,07,957 |
| 5.00 | Providing mild tor steel reinforcement for RCC work including bending, binding and placing in position i/c binding wire complete up to floor two level complete in all respect as per direction & to the entire satisfaction of engineer in charge upto all lead & lifts. | 5.11 | Qtl | 11,200 ₹57,232 | 11,500 ₹58,765 | 10,200 ₹52,122 Lowest |
| 6.00 | Steel work welded in built up sections,trusses and framed work including cutting,hoisting, fixing in position and applying a priming coat of red lead paint :-in gratting,framed guard bar,ladders,railingbrackets and similar works. | 485 | Kg | 180 ₹87,300 | 158 ₹76,630 Lowest | 190 ₹92,150 |
| 7.00 | Wire crates made of G.I.wire filled with boulders with square cut faces against the wire, (Boulder filling to be measured and paid for separately) i/c all leads and lifts. (a) G.I.Wire 5mm thick corresponding to SWG-6(15Cmx15cm.Mesh .complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge. | 62.52 | Sqm | 480 ₹30,009.6 | 410 ₹25,633.2 Lowest | 550 ₹34,386 |
| 8.00 | Wire crate made of G.I wire filled with boulders with square cut faces against the wire (Wire crate to be measured and paid for separately)complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge. | 15.63 | Cum | 2,000 ₹31,260 | 1,950 ₹30,478.5 Lowest | 3,000 ₹46,890 |
Tender Value
Refer Docs
EMD Value
₹6,659
Closing Date
29 Jul 2026, 5:00 pmClosed
EE CHAUNTRA
EE JSD CTR
Improvement Extension Aug of old water supply scheme GO villages in GP village in GP Dhelu, Nichla Garoroo and Dart Bagla etc in Tehsil Joginder Nagar Distt Mandi HP SH CO concrete weir protection work for create work NABARD
2026_HPIPH_139463_1
EE-CTR-TA-5139-88 dated 17.07.2026-9
Open Tender
Civil Works - Others
Item Rate
90 days
Joginder Nagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
EE CHAUNTRA
₹6,659
18 Aug 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches in earth work,lifts up to 1.50 meters atacking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stacking soil in 15cm .layers, when required in to plinths sides of foundations etc, consolidating each deposted layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20 metres in all respect with in all leads and lifts as per the direction of Engineer-in-Charge. | 16.31 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:4:8(1cement :4 sand : 8 graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth complete in all respect with in all leads and lifts as per the direction of Engineer in charge. | 2.25 | Cum | - | - |
| 3Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work in:- | |||||
| 3.01 | Vertical surfaces such as Walls ( any thickness but attached pilasters, buttresses, plinth and string courses etc. and the like complete in all leads and lifts. | 51.07 | Sqm | - | - |
| 4 | Providing and laying reinforcement cement concrete 1:2:4(1cement:2sand: 4graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work :- foundation and plinth including all leads and lifts Suspended floors, roofs, | 12.13 | Cum | - | - |
| 5 | Providing mild tor steel reinforcement for RCC work including bending, binding and placing in position i/c binding wire complete up to floor two level complete in all respect as per direction & to the entire satisfaction of engineer in charge upto all lead & lifts. | 5.11 | Qtl | - | - |
| 6 | Steel work welded in built up sections,trusses and framed work including cutting,hoisting, fixing in position and applying a priming coat of red lead paint :-in gratting,framed guard bar,ladders,railingbrackets and similar works. | 485 | Kg | - | - |
| 7 | Wire crates made of G.I.wire filled with boulders with square cut faces against the wire, (Boulder filling to be measured and paid for separately) i/c all leads and lifts. (a) G.I.Wire 5mm thick corresponding to SWG-6(15Cmx15cm.Mesh .complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge. | 62.52 | Sqm | - | - |
| 8 | Wire crate made of G.I wire filled with boulders with square cut faces against the wire (Wire crate to be measured and paid for separately)complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge. | 15.63 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Form6.pdf
Tender Documents • 0.44 MB
Form8.pdf
Tender Documents • 1.13 MB
Condition.pdf
Tender Documents • 0.59 MB
BOQ_206714.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .