| 1.00retarring | ||||||
| 1.00 | OD260156/2025-2026:SCARIFYING the existing Bituminous surface then Spreading/laying and Compacting the
scarified material and preparing a rigid stratum, for preparing WMM surface, using 3 wheeler
80-100kN static roller @16cum/hr etc complete | 348.3 | sqm | 7.6 ₹2,647.08 | 6.9 ₹2,403.27 | 7.55 ₹2,629.67 |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 26.12 | cum | 3,656.87 ₹95,528.42 | 3,315.57 ₹86,612.64 | 3,630.62 ₹94,842.69 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 348.3 | sqm | 78.36 ₹27,292.79 | 71.05 ₹24,746.72 | 77.8 ₹27,097.74 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 348.3 | sqm | 18.42 ₹6,415.69 | 16.7 ₹5,816.61 | 18.29 ₹6,370.41 |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 313.1 | sqm | 15.4 ₹4,821.74 | 13.96 ₹4,370.88 | 15.28 ₹4,784.17 |
| 1.01 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 31.91 | sqm | 305.09 ₹9,736.34 | 276.61 ₹8,827.45 | 302.9 ₹9,666.45 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 661.4 | sqm | 281.98 ₹1.9 L | 255.66 ₹1.7 L | 279.96 ₹1.9 L |
| 1.01 | 11.4.2.2:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>II. P.C.C grade M 15 <br> (ii) Nominal mix 1:2.5:5 (Hand mixing) | 0.53 | cum | 8,941.65 ₹4,756.96 | 8,107.09 ₹4,312.97 | 8,877.44 ₹4,722.80 |
| 1.01 | OD399292/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 2.54 | cum | 4,056.22 ₹10,323.08 | 3,677.63 ₹9,359.57 | 4,027.09 ₹10,248.94 |
Tender Value
₹4.2 L
EMD Value
₹10,524
Closing Date
28 Jan 2026, 3:00 pmClosed
ASSISTANT ENGINEER
LSGD SECTION VELLOOR
Annual Plan-84/2025-26 Velloor GP MAINTENANCE OF VELLOOR JUNCTION RAILWAY STATION NADUPURACKAL SUBCENTRE ROAD IN WARD-05
2026_LSGD_829327_1
53/AE/LSGD/VELLOOR/2025-26
Open Tender
Civil Works - Roads
180 days
Velloor
Bank details
Registration details
12 documents required · 12 mandatory
₹930
₹10,524
26 Feb 2026
20 Jan 2026
29 Jan 2026
20 Jan 2026
28 Jan 2026
20 Jan 2026
retarring
OD260156/2025-2026:SCARIFYING the existing Bituminous surface then Spreading/laying and Compacting the scarified material and preparing a rigid stratum, for preparing WMM surface, using 3 wheeler 80-100kN static roller @16cum/hr etc complete
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
11.4.2.2:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>II. P.C.C grade M 15 <br> (ii) Nominal mix 1:2.5:5 (Hand mixing)
OD399292/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD398711/2025-2026:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes Details of cost for hand rail of railing of two flights of staircase, length of hand rail = 5.40 m i.e. 20.09 kg(Modified item of 10.26.3 from DSR)
OD410094/2025-2026:Painting works synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1392627.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1392627.xls
BOQ • 0.31 MB
SBD.pdf
Tender Documents • 1.75 MB
Download all tender documents and submit your bid